会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Installation for the production of steel by pre-smelting of pig iron
    • 安装生铁预生产生铁
    • US4627601A
    • 1986-12-09
    • US748118
    • 1985-06-24
    • Aristide BerthetGuy Denier
    • Aristide BerthetGuy Denier
    • C21C1/02C21C1/00C21C1/04C21C5/56
    • C21C5/567C21C1/00C21C1/04
    • Installation according to the invention comprising a desilication and dephosphorization stage (A), followed by a decarburization stage and in which the pig iron to be pre-smelted is intended to form a bath whose free surface is maintained at a predetermined level (N.sub.1).The dephosphorization comprises a reactor (1) comprising means (5, 6, 8) respectively for introducing the pig iron to be pre-smelted, for adding desilication and dephosphorization agents, and for creating an oxidizing atmosphere, as well as rabbling means (9). It also comprises a decanter (2) separated from the reactor (1) by a partition (3) having an opening (4) below the level (N.sub.1) and whose upper end is above the latter. The decanter comprises an immersed outlet opening (10) connected to the decarburization stage and an overflow (12) for evacuating the slag. The slag formed in the reactor (1) flows out in the decanter (2), overflows above the partition (3), and moves toward the overflow (12) which evacuated it.
    • 根据本发明的包括脱磷和脱磷阶段(A)的装置,随后是脱碳阶段,其中预先熔炼的生铁旨在形成其自由表面保持在预定水平(N1)的浴。 脱磷包括反应器(1),其包括分别用于引入待熔炼的生铁,用于添加脱硅和脱磷剂并用于产生氧化气氛的装置(5,6,8)以及冲洗装置(9 )。 它还包括通过具有在水平面(N1)下方的开口(4)并且其上端在其上方的开口(4)与反应器(1)分离的滗析器(2)。 滗析器包括连接到脱碳阶段的浸没式出口(10)和用于排出炉渣的溢流(12)。 在反应器(1)中形成的炉渣在滗析器(2)中流出,溢出在分隔件(3)的上方,并向排出的溢流器(12)移动。