会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • Methods for completing and stimulating a well bore
    • 完井和刺激井眼的方法
    • US20100212897A1
    • 2010-08-26
    • US12378932
    • 2009-02-20
    • Philip D. NguyenRonald G. DusterhoftLoyd East
    • Philip D. NguyenRonald G. DusterhoftLoyd East
    • E21B43/267
    • E21B43/267
    • Methods are providing, including methods comprising providing a liner disposed within a well bore that penetrates a subterranean formation, such that the well bore comprises an annular space between the exterior surface of the liner and the well bore wall; providing a jetting tool disposed within the liner; introducing a stimulation fluid to a treatment interval of the well bore via the jetting tool, such that the stimulation fluid is introduced with sufficient pressure to create or enhance a plurality of perforations in the liner in the treatment interval; introducing a proppant slurry comprising a plurality of resin-coated particulates to the treatment interval of the well bore; and allowing the resin-coated particulates to fill at least a portion of the liner in the treatment interval and at least a portion of the annular space in the treatment interval.
    • 提供的方法包括提供设置在穿透地下地层的井眼内的衬套的方法,使得井筒包括在衬套的外表面和井眼壁之间的环形空间; 提供设置在所述衬套内的喷射工具; 通过所述喷射工具将刺激流体引入所述井眼的治疗间隔,使得所述刺激流体以足够的压力被引入以在所述治疗间隔中产生或增强所述内衬中的多个穿孔; 将包含多个树脂涂覆的颗粒的支撑剂浆料引入井眼的处理间隔; 并且允许树脂涂覆的颗粒在处理间隔内填充衬垫的至少一部分以及处理间隔中的环形空间的至少一部分。
    • 2. 发明授权
    • Methods for completing and stimulating a well bore
    • 完井和刺激井眼的方法
    • US07882894B2
    • 2011-02-08
    • US12378932
    • 2009-02-20
    • Philip D. NguyenRonald G. DusterhoftLoyd East
    • Philip D. NguyenRonald G. DusterhoftLoyd East
    • E21B43/26
    • E21B43/267
    • Methods are providing, including methods comprising providing a liner disposed within a well bore that penetrates a subterranean formation, such that the well bore comprises an annular space between the exterior surface of the liner and the well bore wall; providing a jetting tool disposed within the liner; introducing a stimulation fluid to a treatment interval of the well bore via the jetting tool, such that the stimulation fluid is introduced with sufficient pressure to create or enhance a plurality of perforations in the liner in the treatment interval; introducing a proppant slurry comprising a plurality of resin-coated particulates to the treatment interval of the well bore; and allowing the resin-coated particulates to fill at least a portion of the liner in the treatment interval and at least a portion of the annular space in the treatment interval.
    • 提供的方法包括提供设置在穿透地下地层的井眼内的衬套的方法,使得井筒包括在衬套的外表面和井眼壁之间的环形空间; 提供设置在所述衬套内的喷射工具; 通过所述喷射工具将刺激流体引入所述井眼的治疗间隔,使得所述刺激流体以足够的压力被引入以在所述治疗间隔中产生或增强所述内衬中的多个穿孔; 将包含多个树脂涂覆的颗粒的支撑剂浆料引入井眼的处理间隔; 并且允许树脂涂覆的颗粒在处理间隔内填充衬垫的至少一部分以及处理间隔中的环形空间的至少一部分。
    • 5. 发明授权
    • Method and composition for enhancing coverage and displacement of treatment fluids into subterranean formations
    • 用于增强处理流体进入地层的覆盖和位移的方法和组成
    • US07757768B2
    • 2010-07-20
    • US10961508
    • 2004-10-08
    • Ronald G. DusterhoftPhilip D. Nguyen
    • Ronald G. DusterhoftPhilip D. Nguyen
    • E21B43/16
    • E21B43/16C09K8/584C09K8/588
    • A method of injecting a treatment fluid into a portion of a subterranean formation, comprising providing a treatment fluid having a viscosity; determining the breakdown pressure of the portion of the subterranean formation; calculating the maximum sustainable flow rate for the treatment fluid; and, injecting the treatment fluid into the portion of the subterranean formation at a flow rate less than or equal to the maximum sustainable flow rate for the treatment fluid. A method of injecting a treatment fluid into a portion of a subterranean formation, comprising providing a treatment fluid having a viscosity; determining the breakdown pressure of the portion of the subterranean formation; calculating the maximum allowable treatment fluid viscosity; adjusting the viscosity of the treatment fluid to a viscosity less than or equal to the maximum allowable treatment fluid viscosity; and injecting the treatment fluid into the subterranean formation at the selected treatment fluid flow rate.
    • 一种将处理流体注入地层的一部分的方法,包括提供具有粘度的处理流体; 确定地下部分的击穿压力; 计算处理液的最大可持续流量; 并且以小于或等于处理流体的最大可持续流速的流量将处理流体注入到地下部分的部分中。 一种将处理流体注入地层的一部分的方法,包括提供具有粘度的处理流体; 确定地下部分的击穿压力; 计算最大允许处理液体粘度; 将处理流体的粘度调节至小于或等于最大允许处理流体粘度的粘度; 并以所选择的处理流体流速将处理流体注入到地下地层中。