会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • HUMIDITY CONTROL APPARATUS
    • 湿度控制装置
    • US20150040766A1
    • 2015-02-12
    • US14345119
    • 2012-09-14
    • Naotoshi FujitaShuji Ikegami
    • Naotoshi FujitaShuji Ikegami
    • F24F11/00F24F3/14
    • F24F11/0008B01D53/1425B01D53/263F24F3/1417F24F2203/026
    • In the present invention, liquid absorbent is cooled or heated during off-peak hours of electricity demand to prevent the margin between electricity supply and demand from being tightened. A humidity control apparatus switches an absorbent circuit between a regenerated position in which a regeneration circuit is formed, and a humidity-controlled position in which a humidity control circuit is formed. In the regeneration circuit, during a period during which humidity control operation is stopped, outlet and inlet ends of a regeneration passage communicate with each other, and liquid absorbent circulates within the regeneration passage. In the humidity control circuit, during the humidity control operation, a humidity control passage and the regeneration passage communicate with each other, and liquid absorbent circulates between the humidity control passage and the regeneration passage.
    • 在本发明中,液体吸收剂在电力需求的非高峰时段被冷却或加热,以防止电力和需求之间的裕度被收紧。 湿度控制装置在形成再生回路的再生位置与形成有湿度控制电路的湿度控制位置之间切换吸收电路。 在再生回路中,在湿度控制动作停止的期间,再生通路的出口端和入口端相互连通,液体吸收剂在再生通路内循环。 在湿度控制电路中,在湿度调节运转中,湿度调节通路和再生通路相互连通,吸湿剂在湿度调节通路与再生通路之间循环。
    • 7. 发明申请
    • HUMIDITY CONTROLLER
    • 湿度控制器
    • US20100170292A1
    • 2010-07-08
    • US12664307
    • 2008-06-03
    • Yoshinori NarikawaShuji IkegamiNobuki Matsui
    • Yoshinori NarikawaShuji IkegamiNobuki Matsui
    • F25B15/00
    • F24F3/1411F24F3/1429F24F3/147F24F11/0008
    • In a casing (11) of a humidity controller (10), a first heat exchanger chamber (37) which accommodates a first adsorption heat exchanger (51), and a second heat exchanger chamber (38) which accommodates a second adsorption heat exchanger (52) are arranged next to each other in the left-to-right direction. An indoor air side passage (32) and an outdoor air side passage (34) are provided on the rear panel portion (13) side of the heat exchanger chambers (37, 38), and a supply side passage (31) and exhaust side passage (33) are provided on the front panel portion (12) side of the heat exchanger chambers (37, 38). The rear panel portion (13) is provided with an outdoor air intake opening (24) and an indoor air intake opening (23) at locations close to a center of the rear panel portion (13) in the left-to-right direction. A first side panel portion (14) is provided with a supply opening (22) at a location close to the front, and a second side panel portion (15) is provided with an exhaust opening (21) at a location close to the front. A supply fan (26) is connected to the supply opening (22), and an exhaust fan (25) is connected to the exhaust opening (21). By this structure, a pressure loss at a time when air flows in the casing can be reduced.
    • 在湿度控制器(10)的壳体(11)中,容纳第一吸附热交换器(51)的第一热交换器室(37)和容纳第二吸附热交换器(38)的第二热交换器室 52)在左右方向上彼此相邻布置。 在热交换器室(37,38)的后面板部(13)侧设置有室内空气侧通路(32)和室外空气侧通路(34),供给侧通路(31)和排气侧 通道(33)设置在热交换器室(37,38)的前面板部分(12)侧。 后板部(13)在靠近后板部(13)的中心的左右方向的位置设有室外空气吸入口(24)和室内空气吸入口(23)。 第一侧板部分(14)在靠近前部的位置处设置有供应开口(22),并且第二侧板部分(15)在靠近前部的位置设置有排气开口(21) 。 供给风扇26连接到供给开口22,排气扇25与排气口21连接。 通过这种结构,可以减少空气在壳体中流动时的压力损失。
    • 8. 发明授权
    • Humidity controller
    • 湿度控制器
    • US07472553B2
    • 2009-01-06
    • US10555081
    • 2004-05-24
    • Shuji IkegamiTomohiro Yabu
    • Shuji IkegamiTomohiro Yabu
    • F25D17/06F25B17/00
    • B01D53/265F24F3/1411F24F3/1429F24F2011/0002
    • A humidity controller apparatus (10) includes a refrigerant circuit provided with first and second heat exchangers (61, 62). An adsorbent is supported on the surface of each of the first and second heat exchangers (61, 62). The refrigerant circuit is configured to allow for switching of the circulation direction of a refrigerant by operation of a four-way selector valve. In addition, in the humidity controller apparatus (10), a switching mechanism (50) switches the distribution routes of air streams. The humidity controller apparatus (10) operates the four-way selector valve and the switching mechanism (50), whereby a first air stream is dehumidified in the heat exchanger (61) or (62), whichever is acting as an evaporator while, on the other hand, a second air stream is humidified in the heat exchanger (61) or (62), whichever is acting as a condenser. In the humidity controller apparatus (10), the operation of the refrigerant circuit and the switching time interval of the air stream distribution routes are set depending on the load of humidity control. As the humidity control load increases, the switching time interval is set smaller.
    • 一种调湿装置(10)具备设置有第一及第二热交换器(61,62)的制冷剂回路。 吸附剂被支撑在第一和第二热交换器(61,62)中的每一个的表面上。 制冷剂回路构成为能够通过四通换向阀的动作切换制冷剂的循环方向。 另外,在湿度控制装置(10)中,切换机构(50)切换空气流的配送路径。 湿度调节装置(10)操作四通换向阀和切换机构(50),由此第一空气流在热交换器(61)或(62)中被除湿,无论哪个用作蒸发器,而在 另一方面,第二气流在热交换器(61)或(62)中被加湿,无论作为冷凝器。 在湿度控制装置(10)中,根据湿度控制的负荷来设定制冷剂回路的运转和气流分配路径的切换时间间隔。 随着湿度控制负载的增加,切换时间间隔变小。