会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Control device for a power converter circuit
    • 电源转换器电路的控制装置
    • US09281742B2
    • 2016-03-08
    • US14345205
    • 2012-09-18
    • Nagasaki UniversityPANASONIC CORPORATION
    • Fujio KurokawaMasahito Ohnishi
    • H02M1/00H02M1/42H02M3/157H02M7/06
    • H02M1/42H02M1/4225H02M3/157H02M7/06H02M2001/0022Y02B70/126
    • In DC/DC converter circuit, the peak value of the reactor current is found based on output voltage and an input voltage, thereby, the operation with the predetermined electric current mode is thereby enabled. The AC/DC converter circuit is run with a predetermined current mode, the power factor improvement is accomplished. The first control part 211 inputs a detected value of output voltage Eo, and a turn-off timing predicted value of switch Tr of the DC/DC converter 1 is calculated. The first control part 211 sends the calculation result to the switch drive signal generate part 213. The second control part 212 inputs the detected value of the output voltage and the input voltage, and it receives the turn-off timing predicted value from the first control part 211. Even more particularly, the second control part 212 calculates the peak value of the reactor current of the DC/DC converter 1 based on the turn-off timing predicted value, and it calculates the time that the reactor current decreases to a predetermined preset value from the peak value as a turn-on timing predicted value.
    • 在DC / DC转换器电路中,基于输出电压和输入电压求出电抗器电流的峰值,从而能够实现预定电流模式的动作。 AC / DC转换器电路以预定的电流模式运行,功率因数提高完成。 第一控制部分211输入输出电压Eo的检测值,并且计算DC / DC转换器1的开关Tr的截止定时预测值。 第一控制部件211将计算结果发送到开关驱动信号生成部件213.第二控制部件212输入检测出的输出电压值和输入电压值,并从第一控制部分接收关断定时预测值 更具体地说,第二控制部件212基于关断定时预测值计算DC / DC转换器1的电抗器电流的峰值,并且计算电抗器电流降低到预定的时间 从峰值的预设值作为开启时间预测值。
    • 2. 发明申请
    • CONTROL DEVICE FOR POWER CONVERSION CIRCUIT
    • 电源转换电路的控制装置
    • US20150155778A1
    • 2015-06-04
    • US14404890
    • 2013-05-31
    • NAGASAKI UNIVERSITYPANASONIC CORPORATION
    • Fujio KurokawaMasahito Ohnishi
    • H02M3/156H02M1/42
    • H02M3/156G01R19/175H02M1/42H02M1/4225H02M2001/0009H02M2001/4291Y02B70/126
    • The control device 1A includes an on-time information generation circuit 11, a zero cross detecting circuit 12 and a PWM signal generation circuit 13. The on-time information generation circuit 11 inputs at least a power converter circuit information including an output voltage value of a power converter circuit 2, and generates the on-time information about a switch 212. The zero cross detecting circuit 12 detects a time when a inductor current becomes zero by inputting a voltage between both terminals of the inductor 214, and generates a zero cross detection signal when the inductor current became zero. The PWM signal generation circuit 13 inputs the on-time information and the zero cross detection signal, and generates a turn on signal and a turnoff signal. The zero cross detecting circuit 12 has an edge detecting circuit. The zero cross detecting circuit 12 generates a zero cross detection signal when the edge detecting circuit detected an edge appearing in a voltage between both terminals of the inductor 214. The PWM signal generation circuit 13 generates a turn-on signal when a zero cross detection signal was input. The PWM signal generation circuit 13 generates the turn-off signal, when a time based on the on-time information passed, In this way, by the present invention, a change of the inductor current is acquired precisely, and a good critical mode control is carried out.
    • 控制装置1A包括导通时间信息生成电路11,零交叉检测电路12和PWM信号生成电路13.接通时间信息生成电路11至少输入包含输出电压值 功率转换器电路2,并且产生关于开关212的导通时间信息。零交叉检测电路12通过在电感器214的两个端子之间输入电压来检测电感器电流变为零的时间,并产生零交叉 当电感电流变为零时检测信号。 PWM信号生成电路13输入导通时间信息和过零检测信号,并产生导通信号和截止信号。 零交叉检测电路12具有边缘检测电路。 零交叉检测电路12当边缘检测电路检测到出现在电感器214的两个端子之间的电压中的边沿时产生零交叉检测信号。当信号为零时,PWM信号产生电路13产生导通信号 被输入。 当基于接通时间信息的时间时,PWM信号产生电路13产生关断信号。以这种方式,通过本发明,精确地获取电感器电流的变化,并且获得良好的临界模式控制 完成了。
    • 4. 发明申请
    • CONTROL DEVICE FOR A POWER CONVERTER CIRCUIT
    • 电源转换器电路的控制装置
    • US20150003129A1
    • 2015-01-01
    • US14345205
    • 2012-09-18
    • Nagasaki UniversityPANASONIC CORPORATION
    • Fujio KurokawaMasahito Ohnishi
    • H02M1/42H02M7/06H02M3/157
    • H02M1/42H02M1/4225H02M3/157H02M7/06H02M2001/0022Y02B70/126
    • In DC/DC converter circuit, the peak value of the reactor current is found based on output voltage and an input voltage, thereby, the operation with the predetermined electric current mode is thereby enabled. The AC/DC converter circuit is run with a predetermined current mode, the power factor improvement is accomplished. The first control part 211 inputs a detected value of output voltage Eo, and a turn-off timing predicted value of switch Tr of the DC/DC converter 1 is calculated. The first control part 211 sends the calculation result to the switch drive signal generate part 213. The second control part 212 inputs the detected value of the output voltage and the input voltage, and it receives the turn-off timing predicted value from the first control part 211. Even more particularly, the second control part 212 calculates the peak value of the reactor current of the DC/DC converter 1 based on the turn-off timing predicted value, and it calculates the time that the reactor current decreases to a predetermined preset value from the peak value as a turn-on timing predicted value.
    • 在DC / DC转换器电路中,基于输出电压和输入电压求出电抗器电流的峰值,从而能够实现预定电流模式的动作。 AC / DC转换器电路以预定的电流模式运行,功率因数提高完成。 第一控制部分211输入输出电压Eo的检测值,并且计算DC / DC转换器1的开关Tr的截止定时预测值。 第一控制部件211将计算结果发送到开关驱动信号生成部件213.第二控制部件212输入检测出的输出电压值和输入电压值,并从第一控制部分接收关断定时预测值 更具体地说,第二控制部件212基于关断定时预测值计算DC / DC转换器1的电抗器电流的峰值,并且计算电抗器电流降低到预定的时间 从峰值的预设值作为开启时间预测值。