    • Steam Turbine Power Plant and Method for Activating Steam Turbine Power Plant
    • 蒸汽轮机发电厂和激活蒸汽轮机发电厂的方法
    • US20150121872A1
    • 2015-05-07
    • US14532253
    • 2014-11-04
    • Mitsubishi Hitachi Power Systems, Ltd.
    • Tatsuro YASHIKIYukinori KATAGIRITakuya YOSHIDAMiyuki KAWATAYasuhiro YOSHIDAEunkyeong KIMKenichiro NOMURAKazunori YAMANAKAFumiyuki SUZUKINorihiro IYANAGA
    • F01K13/02F01K7/16
    • F01K13/02F01K7/165F05D2260/821F22B35/00
    • Providing a steam turbine power plant that can be safely activated at a high speed while maintaining thermal stress at a level equal to or lower than a limit in consideration of operational results of the plant, and a method for activating the steam turbine power plant. The steam turbine power plant includes a life consumption amount calculator 22 configured to calculate life consumption amounts of a turbine rotor based on a value measured by a measurer 11, 12, a life consumption amount storage device 23, a thermal stress limit update timing determining device 24 configured to determine a time when thermal stress limits are updated, an accumulated life consumption amount calculator 25 configured to calculate accumulated life consumption amounts of the turbine rotor when the thermal stress limits are updated, a planned life consumption amount setting device 26 configured to set planned life consumption amounts of the turbine rotor based on the accumulated life consumption amounts of the turbine rotor, a thermal stress limit calculator 27 configured to calculate and update the thermal stress limits based on the planned life consumption amounts of the turbine rotor, and a plant command value calculator 28 configured to calculate a plant command value based on the thermal stress limits.
    • 提供一种蒸汽轮机发电厂,其可以在考虑到工厂的运行结果的同时将热应力保持在等于或低于极限的水平的情况下以高速度被安全地激活,以及激活蒸汽轮机发电厂的方法。 蒸汽轮机发电厂包括寿命消耗量计算器22,其被配置为基于由测量器11,12测量的值,寿命消耗量存储装置23,热应力极限更新定时确定装置 24,被配置为确定更新热应力限制的时间;累积寿命消耗量计算器25,被配置为计算当热应力极限更新时所述涡轮转子的累积寿命量;计划寿命消耗量设定装置26, 基于涡轮转子的累积寿命消耗量的涡轮转子的计划寿命消耗量,被配置为基于涡轮转子的计划寿命消耗量来计算和更新热应力极限的热应力极限计算器27以及设备 被配置为计算植物指令值bas的指令值计算器28 根据热应力极限。
    • 4. 发明申请
    • Activation Control Apparatus
    • 激活控制装置
    • US20170002690A1
    • 2017-01-05
    • US15195268
    • 2016-06-28
    • Mitsubishi Hitachi Power Systems, Ltd.
    • Yasuhiro YOSHIDATakuya YOSHIDATatsuro YASHIKIKazunori YAMANAKAFumiyuki SUZUKINorihiro IYANAGA
    • F01K7/16F01D17/14F01D25/10F01D17/10
    • F01K7/165F01D17/105F01D17/145F01D25/10F01K7/16F01K13/02F05D2220/31F05D2260/606Y02E20/16
    • An object of the invention is to provide an activation control apparatus by which a steam turbine can be activated safely at a high speed in response to a state of a power generation plant. In an activation control apparatus for a power generation plant including a heat source apparatus that heats low-temperature fluid by a heat source medium to generate high-temperature fluid; steam generation equipment that generates steam by thermal exchange with the high-temperature fluid; a steam turbine that is driven by the steam; and an adjustment apparatus that adjusts a plant operation amount, the activation control apparatus comprises: a thermal effect amount prediction calculation device that calculates at least a prediction value for a thermal effect amount for use for activation control of the steam turbine; a changeover device that decides, based on a state value of the power generation plant, the sensitivity of the thermal effect amount to a variation of the plant operation amount and outputs a changeover signal for a control mode for the thermal effect amount in accordance with the sensitivity; and an adjustment device that calculates, based on the changeover signal, the plant operation amount so as not to exceed a predetermined limit value.
    • 本发明的一个目的是提供一种激活控制装置,通过该激活控制装置可以响应于发电厂的状态,高速地安全地启动蒸汽轮机。 一种用于发电厂的激活控制装置,包括:通过热源介质加热低温流体以产生高温流体的热源装置; 通过与高温流体热交换产生蒸汽的蒸汽发生设备; 由蒸汽驱动的汽轮机; 所述激活控制装置包括:热效应量预测计算装置,其至少计算用于所述蒸汽轮机的启动控制的热效应量的预测值; 根据发电厂的状态值决定热效应量对设备运行量的变化的灵敏度的转换装置,并输出用于热效应量的控制模式的切换信号, 灵敏度; 以及调整装置,其基于所述切换信号,将所述装置运转量计算为不超过规定的限制值。
    • 5. 发明申请
    • Activation Control Device
    • 激活控制装置
    • US20150135712A1
    • 2015-05-21
    • US14546197
    • 2014-11-18
    • Mitsubishi Hitachi Power Systems, Ltd.
    • Eunkyeong KIMYasuhiro YOSHIDATatsuro YASHIKIYukinori KATAGIRITakuya YOSHIDAKenichiro NOMURAKazunori YAMANAKAFumiyuki SUZUKINorihiro IYANAGA
    • F01K13/02
    • F01K13/02F05D2260/85F05D2270/44
    • A steam turbine plant activation control device is provided, which generates an activation schedule that enables a reduction in a time period required for the activation of a steam turbine plant without complex calculation such as prediction and calculation of a temperature and calculation of thermal stress. The activation control device includes: a storage circuit for storing a correlation between an initial value of a state amount parameter and a plant operation amount which includes a control reference value related to a control target amount and time lengths of phases in a process of activating the steam turbine plant; an operation amount determination circuit for determining time lengths of phases and a control reference value based on the initial value of the state amount parameter and the correlation stored in the storage circuit; and an activation schedule circuit configured to generate activation schedules of the phases based on the phase time lengths and the control reference value, which are determined by the operation amount determination circuit, and generate an activation schedule for a time period from the start to the completion of the activation of the steam turbine plant by combining the activation schedules.
    • 提供了一种蒸汽轮机设备激活控制装置,其产生启动计划,其能够减少激活蒸汽轮机设备所需的时间段,而无需诸如温度的预测和计算以及热应力的计算的复杂计算。 激活控制装置包括:存储电路,用于存储状态量参数的初始值和工厂操作量之间的相关性,所述工厂操作量包括与控制目标量相关的控制参考值和激活所述控制目标量的相位的时间长度 汽轮机厂; 基于所述状态量参数的初始值和存储在所述存储电路中的相关性,确定相位的时间长度的运算量确定电路和控制基准值; 激活调度电路,被配置为基于由操作量确定电路确定的相位时间长度和控制参考值来产生相位的激活时间表,并且从开始到完成的时间段生成激活时间表 通过组合激活时间表来激活蒸汽轮机设备。