    • 1. 发明授权
    • Sewage tank system and method of construction
    • 污水池系统及施工方式
    • US5248219A
    • 1993-09-28
    • US829223
    • 1992-02-03
    • Leo J. Heiler, Jr.
    • Leo J. Heiler, Jr.
    • B09B1/00E03F5/10E03F11/00E04H7/18
    • E03F11/00B09B1/00E04H7/18
    • A sewage collection and separation tank (10) and method of construction is described. The sewage tank is built on a prepared earthen site (21) and is comprised of a tank floor (11) constructed from multiple wedge shaped concrete floor sections (13, 15, 17 and 19) that encase a first elastomeric gasket (37) mounted around the perimeter of a centrally located sump pump pit (23). A second elastomeric gasket (41) is mounted in a side (13c) of the first section so that half of the second gasket remains exposed. The tank floor is completed when the fourth section is poured. By the time the fourth section of the tank floor is poured, the first section has cured to the point that the first section will not seal against the wet concrete of the fourth section. However, a side (19e) of the fourth section, adjacent to the first section, encases the exposed half of the second gasket. This provides a liquid impervious seal between the adjacent first and fourth sections. Without the second gasket, the first and fourth sections would not be capable of sealing against each other. The sewage tank is completed by continual interlocking sidewall panels (25) that are mounted around the perimeter of the tank floor and by interlocking roof panels (not shown) mounted on the wall panels and supported by columns (not shown).
    • 对污水收集分离罐(10)和施工方法进行了说明。 污水箱建在一个准备好的土地(21)上,并由一个由多个楔形混凝土地板部分(13,15,17和19)构成的储罐地板(11)构成,其中装有第一弹性垫圈(37) 围绕位于中心的集水泵凹坑(23)的周边。 第二弹性垫圈(41)安装在第一部分的侧面(13c)中,使得第二垫圈的一半保持暴露。 当第四部分倒出时,罐底完成。 当坦克地板的第四部分被倒出时,第一部分固化到第一部分不会密封第四部分的湿混凝土。 然而,与第一部分相邻的第四部分的侧面(19e)包围第二垫圈的暴露的一半。 这提供了在相邻的第一和第四部分之间的液体不可渗透的密封。 没有第二垫圈,第一和第四部分将不能彼此密封。 污水箱是通过连续互锁的侧壁板(25)来完成的,该侧壁板围绕罐底部的周边安装,并且通过互锁的安装在壁板上并由柱(未示出)支撑的顶板(未示出)来完成。
    • 2. 发明授权
    • Sewage tank system and method of construction
    • 污水池系统及施工方式
    • US5114274A
    • 1992-05-19
    • US672391
    • 1991-03-20
    • Leo J. Heiler, Jr.
    • Leo J. Heiler, Jr.
    • B09B1/00E03F5/10E04H7/18
    • E03F5/101B09B1/00E04H7/18
    • A sewage collection and separation tank (10) and method of construction is described. The sewage tank is built on a prepared earthen site (21) and is comprised of a tank floor (11) constructed from multiple wedge shaped concrete floor sections (13, 15, 17 and 19) that encase a first elastomeric gasket (37) mounted around the perimeter of a centrally located sump pump pit (23). A second elastomeric gasket (41) is mounted in a side (13c) of the first section so that half of the second gasket remains exposed. The tank floor is completed when the fourth section is poured. By the time the fourth section of the tank floor is poured, the first section has cured to the point that the first section will not seal against the wet concrete of the fourth section. However, a side (19e) of the fourth section, adjacent to the first section, encases the exposed half of the second gasket. This provides a liquid impervious seal between the adjacent first and fourth sections. Without the second gasket, the first and fourth sections would not be capable of sealing against each other. The sewage tank is completed by continual interlocking sidewall panels (25) that are mounted around the perimeter of the tank floor and by interlocking roof panels (not shown) mounted on the wall panels and supported by columns (not shown).
    • 对污水收集分离罐(10)和施工方法进行了说明。 污水箱建在一个准备好的土地(21)上,并由一个由多个楔形混凝土地板部分(13,15,17和19)构成的储罐地板(11)构成,其中装有第一弹性垫圈(37) 围绕位于中心的集水泵凹坑(23)的周边。 第二弹性垫圈(41)安装在第一部分的侧面(13c)中,使得第二垫圈的一半保持暴露。 当第四部分倒出时,罐底完成。 当坦克地板的第四部分被倒出时,第一部分固化到第一部分不会密封第四部分的湿混凝土。 然而,与第一部分相邻的第四部分的侧面(19e)包围第二垫圈的暴露的一半。 这提供了在相邻的第一和第四部分之间的液体不可渗透的密封。 没有第二垫圈,第一和第四部分将不能彼此密封。 污水箱是通过连续互锁的侧壁板(25)来完成的,该侧壁板围绕罐底部的周边安装,并且通过互锁的安装在壁板上并由柱(未示出)支撑的顶板(未示出)来完成。