会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Processing gas supplying system and processing gas supplying method
    • 加工气体供应系统和加工气体供应方法
    • US08261762B2
    • 2012-09-11
    • US12093491
    • 2007-08-10
    • Kiyoshi KomiyamaAkitoshi TsujiTakuya Fujiwara
    • Kiyoshi KomiyamaAkitoshi TsujiTakuya Fujiwara
    • H01L21/30B05C11/00
    • F17C7/00F17C5/06F17C2205/0326F17C2205/0335F17C2205/0352F17C2221/016F17C2223/0123F17C2227/044F17C2227/045F17C2250/032F17C2250/0443F17C2250/0626F17C2250/0636F17C2250/0673F17C2260/044F17C2260/053F17C2270/0518Y10T137/0419Y10T137/4259
    • A gas supplying system includes a processing gas supply pipe for supplying a processing gas from a gas cylinder 210 into a processing apparatus and a nonreactive gas supply source 230 for supplying a nonreactive gas into the gas supply pipe. While the system is in operation, the gas supply pipe is charged with the nonreactive gas and a control unit is in a standby state. If a processing gas use start signal is received from the processing apparatus, the system exhausts the nonreactive gas from the gas supply pipe to create a vacuum therein; charges the gas supply pipe with the processing gas; and starts a supply of the processing gas from the processing gas supply source. If a processing gas use finish signal is received from the processing apparatus, the system stops the supply of the processing gas from the processing gas supply source; exhausts the processing gas from the gas supply pipe to create a vacuum therein; and charges the gas supply pipe with the nonreactive gas. Accordingly, the gas pipe from the processing gas supply source to the processing apparatus can be kept charged with the nonreactive gas when the processing gas is not used in the processing apparatus. Therefore, a deposit generation inside the gas pipe can be prevented during that period.
    • 气体供给系统包括用于将来自气瓶210的处理气体供给到处理装置中的处理气体供给管和用于向气体供给管供给非反应性气体的非反应性气体供给源230。 当系统运行时,气体供给管上装有非反应气体,控制单元处于待机状态。 如果从处理装置接收到处理气体使用开始信号,则系统从气体供给管排出非反应性气体,以在其中产生真空; 用加气处理供气管; 并开始从处理气体供应源供应处理气体。 如果从处理装置接收到处理气体使用完成信号,则系统停止从处理气体供应源供应处理气体; 从气体供给管排出处理气体以在其中产生真空; 并用非反应性气体对气体供给管进行充电。 因此,当在处理装置中不使用处理气体时,从处理气体供给源到处理装置的气体管道可以保持充满非反应性气体。 因此,能够防止在该期间内的气体管内的沉积物。
    • 6. 发明授权
    • Method for transporting and installing a semiconductor manufacturing apparatus
    • 运输和安装半导体制造装置的方法
    • US06530136B1
    • 2003-03-11
    • US09658500
    • 2000-09-08
    • Kiyoshi Komiyama
    • Kiyoshi Komiyama
    • B23Q300
    • H01L21/67196H01L21/67017Y10T29/49758Y10T29/4981Y10T29/49895
    • An apparatus substitute is carried and installed in a clean room prior to installation of a semiconductor manufacturing apparatus. The apparatus substitute is composed of separate assembling boxes and is provided with tentative utility connection parts having the same specifications with respect to utility connection parts of the semiconductor manufacturing apparatus. Each of the utility connection parts is temporarily connected to one of a utility line via respective joint pipes. In the utility connection works or temporary connection, an apparatus installation position can be adjusted; a position or a size of a support plate of a floor can be corrected; a route of a utility line or a position can be corrected; or an inspection with respect to each utility line can be performed. After the completion of the inspection of the temporary connection, the utility lines are disconnected from the respective utility connection parts, and the apparatus substitute is divided into the individual boxes and removed from the clean room.
    • 装置替代品在安装半导体制造装置之前被运送并安装在洁净室中。 设备替代品由单独的组装箱组成,并且具有相对于半导体制造装置的公用连接部件具有相同规格的临时公用连接部件。 每个公用设施连接部分经由各自的连接管道临时连接到公用线路之一。 在实用连接工程或临时连接中,可以调整设备安装位置; 可以校正地板的支撑板的位置或尺寸; 公用线路或位置的路线可以被校正; 或者可以执行关于每条公用事业线的检查。 在临时连接检查完成后,将公用设施线路与相应的公用设施连接部分断开,将设备替代品分成各个箱体,并从洁净室中取出。
    • 7. 发明申请
    • PROCESSING GAS SUPPLYING SYSTEM AND PROCESSING GAS SUPPLYING METHOD
    • 加工气体供应系统和加工气体供应方法
    • US20090170332A1
    • 2009-07-02
    • US12093491
    • 2007-08-10
    • Kiyoshi KomiyamaAkitoshi TsujiTakuya Fujiwara
    • Kiyoshi KomiyamaAkitoshi TsujiTakuya Fujiwara
    • H01L21/306B05C11/00H01L21/30
    • F17C7/00F17C5/06F17C2205/0326F17C2205/0335F17C2205/0352F17C2221/016F17C2223/0123F17C2227/044F17C2227/045F17C2250/032F17C2250/0443F17C2250/0626F17C2250/0636F17C2250/0673F17C2260/044F17C2260/053F17C2270/0518Y10T137/0419Y10T137/4259
    • A gas supplying system includes a processing gas supply pipe for supplying a processing gas from a gas cylinder 210 into a processing apparatus and a nonreactive gas supply source 230 for supplying a nonreactive gas into the gas supply pipe. While the system is in operation, the gas supply pipe is charged with the nonreactive gas and a control unit is in a standby state. If a processing gas use start signal is received from the processing apparatus, the system exhausts the nonreactive gas from the gas supply pipe to create a vacuum therein; charges the gas supply pipe with the processing gas; and starts a supply of the processing gas from the processing gas supply source. If a processing gas use finish signal is received from the processing apparatus, the system stops the supply of the processing gas from the processing gas supply source; exhausts the processing gas from the gas supply pipe to create a vacuum therein; and charges the gas supply pipe with the nonreactive gas. Accordingly, the gas pipe from the processing gas supply source to the processing apparatus can be kept charged with the nonreactive gas when the processing gas is not used in the processing apparatus. Therefore, a deposit generation inside the gas pipe can be prevented during that period.
    • 气体供给系统包括用于将来自气瓶210的处理气体供给到处理装置中的处理气体供给管和用于向气体供给管供给非反应性气体的非反应性气体供给源230。 当系统运行时,气体供给管上装有非反应气体,控制单元处于待机状态。 如果从处理装置接收到处理气体使用开始信号,则系统从气体供给管排出非反应性气体,以在其中产生真空; 用加气处理供气管; 并开始从处理气体供应源供应处理气体。 如果从处理装置接收到处理气体使用完成信号,则系统停止从处理气体供应源供应处理气体; 从气体供给管排出处理气体以在其中产生真空; 并用非反应性气体对气体供给管进行充电。 因此,当在处理装置中不使用处理气体时,从处理气体供给源到处理装置的气体管道可以保持充满非反应性气体。 因此,能够防止在该期间内的气体管内的沉积物。
    • 9. 发明授权
    • Managing apparatus and managing method of a semiconductor manufacturing apparatus
    • 管理半导体制造装置的装置和管理方法
    • US07212977B2
    • 2007-05-01
    • US09886475
    • 2001-06-22
    • Akitoshi TsujiOsamu SuenagaKiyoshi Komiyama
    • Akitoshi TsujiOsamu SuenagaKiyoshi Komiyama
    • G06Q99/00
    • H01L21/67276G06Q30/0283G06Q50/06H01L21/67242H01L21/67253Y02A20/22Y02P90/84
    • Power consumption of electric equipment used in a semiconductor manufacturing apparatus (100) is obtained and the total amount is displayed as calories by a display means. The semiconductor manufacturing apparatus is configured so that the equipment is set up inside a housing (10). The amount of heat discharged from the inside to the outside (a clean room) via the housing is obtained, and further, the amount of heat removed by exhaust from the interior of the housing and the amount of heat removed by cooling water that cools the equipment is also obtained, and the total amount of heat is displayed. Additionally, factors pertaining to operating costs such as power consumption are measured and their cost obtained, the amount of power consumed is multiplied by a crude oil conversion coefficient to obtain the amount of CO2 generated, and the result is displayed. The factors to be measured are measured by a thermocouple, an anemometer and an power meter, and the measurements are input to a personal computer (6) via a conversion module (7).
    • 获得半导体制造装置(100)中使用的电气设备的功耗,并且通过显示装置将总量显示为卡路里。 半导体制造装置被配置为使得设备被设置在壳体(10)内。 通过外壳从内向外(洁净室)排出的热量得到,另外,从壳体内部排出的热量以及冷却水的冷却水除去的热量 也可获得设备,并显示总热量。 此外,测量与运行成本(如功耗)相关的因素,并获得其成本,消耗的功率量乘以原油转化系数以获得产生的CO 2的量,结果 被展示。 待测量的因素由热电偶,风速计和功率计测量,测量通过转换模块(7)输入个人计算机(6)。