会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Apparatus and method for computer host system and adaptor interrupt reduction including clustered command completion
    • 计算机主机系统和适配器中断减少的装置和方法,包括集群命令完成
    • US06219727B1
    • 2001-04-17
    • US09326736
    • 1999-06-04
    • Kailash KailashBalakrishna B. BayarVytla P. ChandramouliSanjeev B. Gokhale
    • Kailash KailashBalakrishna B. BayarVytla P. ChandramouliSanjeev B. Gokhale
    • G06F1300
    • G06F13/24
    • The number of interrupts are controlled by delaying communication of the interrupt to the host computer or processor according to predetermined rules. This reduces the processing overhead and greatly increases system performance. Application of the inventive structure and method to network servers and RAID disk drive storage arrays is particularly beneficial. In one embodiment, the invention provides structure and method for reducing the number of system interrupts to the host processor to reduce host processor overhead for operation of a computer system having a host processor and a peripheral device coupled to the host processor by a device controller. In another embodiment, the invention provides structure and method for clustering command completion prior to posting completion. System, apparatus, method, and computer program products are described.
    • 通过根据预定的规则将中断的通信延迟到主机计算机或处理器来控制中断的数量。 这减少了处理开销并大大提高了系统性能。 将本发明的结构和方法应用于网络服务器和RAID磁盘驱动器存储阵列是特别有益的。 在一个实施例中,本发明提供了用于减少到主机处理器的系统中断次数的结构和方法,以减少主机处理器开销,以便操作具有主机处理器和由设备控制器耦合到主机处理器的外围设备的计算机系统。 在另一个实施例中,本发明提供了在发布完成之前对命令完成进行聚类的结构和方法。 描述了系统,装置,方法和计算机程序产品。