会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Base sequence detecting electrode, base sequence detecting device and base sequence detecting method
    • 碱基序列检测电极,碱基序列检测装置和碱基序列检测方法
    • US07718048B2
    • 2010-05-18
    • US11452370
    • 2006-06-14
    • Jun OkadaKoji HashimotoMasayoshi Takahashi
    • Jun OkadaKoji HashimotoMasayoshi Takahashi
    • G01N27/327
    • C12Q1/6825C12Q2563/173C12Q2549/125
    • A conductive detecting electrode (2), first blocking molecules (21) formed so as to cover a surface of the detecting electrode (2), the first blocking molecules decreasing adsorption of an intercalating agent to the surface of the detecting electrode (2), a target-complementary probe (23) immobilized to the detecting electrode (2) via a spacer member (22) comprising straight chain organic molecules, the target-complementary probe including a base sequence complementary to a target base sequence which is an object of detection, a conductive comparison electrode (3), and second blocking molecules (31) formed so as to cover a surface of the comparison electrode (3), the second blocking molecules decreasing adsorption of an intercalating agent to the surface of the comparison electrode (3), are provided.
    • 导电检测电极(2),形成为覆盖检测电极(2)的表面的第一阻挡分子(21),第一阻挡分子减少插入剂吸附到检测电极(2)的表面, 通过包含直链有机分子的间隔构件(22)固定在检测电极(2)上的目标互补探针(23),靶互补探针包括与作为检测对象的目标碱基序列互补的碱基序列 ,导电比较电极(3)和形成为覆盖比较电极(3)的表面的第二阻挡分子(31),第二阻断分子减少插入剂吸附到比较电极(3)的表面 )。
    • 9. 发明申请
    • CONNECTION-STRUCTURE OF A FLEXIBLE TUBE
    • 柔性管的连接结构
    • US20120217740A1
    • 2012-08-30
    • US13403954
    • 2012-02-23
    • Satoru HosotaniYoshinari RokkenJun OkadaTakeshi Amano
    • Satoru HosotaniYoshinari RokkenJun OkadaTakeshi Amano
    • F16L33/00
    • F16L33/30
    • A connection-structure of a flexible tube, in which the flexible tube is fitted to an end portion of a metal pipe, comprises an annular projection, a first radially enlarged portion, a seal ring and a second radially enlarged portion. The annular projection is formed on an outer surface of the end portion of the metal pipe. The first radially enlarged portion is formed on the tip side of the metal pipe relative to the projection, defining a first annular groove with the projection. The seal ring is fitted into the annular groove. The second enlarged portion is formed on the base side of the metal pipe relative to the projection, defining a second annular groove with the projection. The tip portion of the flexible tube is positioned close to the maximum diameter portion of the second enlarged portion.
    • 软管的连接结构,其中柔性管装配到金属管的端部,包括环形突起,第一径向扩大部分,密封环和第二径向扩大部分。 环形凸起形成在金属管的端部的外表面上。 第一径向扩大部分相对于突起形成在金属管的末端侧,从而限定了具有突起的第一环形槽。 密封环安装在环形槽中。 第二扩大部分相对于突起形成在金属管的基部侧上,与突出部限定第二环形槽。 柔性管的顶端位于第二扩大部分的最大直径部分附近。