会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Method and apparatus for producing a three-dimensional curved surface
from two-dimensional curves in perpendicular planes
    • 用于从垂直平面中的二维曲线生成三维曲面的方法和装置
    • US4755926A
    • 1988-07-05
    • US711578
    • 1985-03-06
    • Hajimu KishiMasaki Seki
    • Hajimu KishiMasaki Seki
    • B23Q15/00G05B19/4093G05B19/4097G05B19/4099G05B19/41G05B19/4103G06F17/50G06F15/46G05B19/18
    • G05B19/4099G05B19/41G05B2219/35146
    • A method and apparatus for specifying a three-dimensional curve having steps of entering data specifying a first projection curve (CV.sub.1) and a second projection curve (CV.sub.2) is obtained when a three-dimensional curve (31a) is projected onto two adjacent planes (e.g., an XY plane and a YZ plane) in a rectangular coordinate system. The method also includes finding coordinate values (a.sub.i, b.sub.i) of an i-th (i=1, 2 . . . ) partition point P.sub.i from among partition points partitioning the first projection curve (CV.sub.1) into a number of line segments and finding coordinate values (b.sub.i,c.sub.i) of a point Q.sub.i on the second projection curve (CV.sub.2) having a coordinate value b.sub.i on a common axis (Y axis) among coordinate axes of the two adjacent planes. The three-dimensional curve (31a) is specified by a collection of points (R.sub.i) having the three-dimensional coordinate values (a.sub.i, b.sub.i, c.sub.i).
    • PCT No.PCT / JP84 / 00347 Sec。 371日期:1985年3月6日 102(e)1985年3月6日PCT PCT。1984年7月7日PCT公布。 公开号WO85 / 00442 日期:1985年1月31日。当三维曲线(31a)为三维曲线(31a)时,获得用于指定具有输入指定第一投影曲线(CV1)和第二投影曲线(CV2)的数据的步骤的三维曲线的方法和装置 被投影到矩形坐标系中的两个相邻平面(例如,XY平面和YZ平面)上。 该方法还包括从划分第一投影曲线(CV1)的分割点中找到第i(i = 1,2,...)分割点Pi的坐标值(ai,bi)到多个线段并找到 在两个相邻平面的坐标轴之间的公共轴(Y轴)上具有坐标值bi的第二投影曲线(CV2)上的点Qi的坐标值(bi,ci)。 三维曲线(31a)由具有三维坐标值(ai,bi,ci)的点(Ri)的集合来指定。
    • 5. 发明授权
    • Method of controlling comb-cutter lathe
    • 控制梳刀车床的方法
    • US4680719A
    • 1987-07-14
    • US621925
    • 1984-06-18
    • Hajimu KishiMasaki SekiTakashi Takegahara
    • Hajimu KishiMasaki SekiTakashi Takegahara
    • B23B1/00G05B19/416G05B19/00G06F15/00
    • B23B1/00G05B19/4166G05B2219/45141G05B2219/49157G05B2219/49392G05B2219/50291Y10T82/2502
    • A method of controlling a comb-cutter lathe in which one face of a tool rest (TBS) is provided with two or more juxtaposed tools (TL1, TL2) for subjecting a workpiece (WK) to machining by using: (1) predetermined tools in succession, (2) part dimensions, (3) a tool selection sequence, (4) a machining start location for each tool, and (5) mounting dimension information measured from a reference point on the tool rest to a distal end of each tool. Machining is sequentially performed based on this information by predetermined tools at machining locations (P.sub.5 -P.sub.4 -P.sub.3 -P.sub.2 -P.sub.1 ; P.sub.6 -P.sub.7 -P.sub.8 -P.sub.9 -P.sub.10) assigned to the tools, and after machining is completed by a first tool (TL1), the tool rest (TBS) is moved to position the next tool (TL2) at a machining location and machining is performed by that tool. The method includes moving the tool rest along a Z axis to a point P.sub.r at which none of the tools (TL1, TL2) will contact the workpiece (WK) when the tool rest (TBS) is moved in a direction (X-axis direction) at right angles to the longitudinal direction (Z-axis direction) of the workpiece, and thereafter moving the tool rest along the X axis to a point P.sub.t at which an X-axis position of a selected tool coincides with an X-axis coordinate value of a position at which machining is to be started by the selected tool, and thenforth performing machining using the selected tool.
    • PCT No.PCT / JP83 / 00373 Sec。 371日期1984年6月18日 102(e)日期1984年6月18日PCT提交1983年10月25日PCT公布。 出版物WO84 / 01730 日期:1984年5月10日。一种控制梳齿机床的方法,其中刀架(TBS)的一个面设有两个或多个并置工具(TL1,TL2),用于使工件(WK)通过使用 :(1)连续预定的工具,(2)零件尺寸,(3)刀具选择顺序,(4)每个刀具的加工开始位置,以及(5)将从刀具座上的参考点测量的尺寸信息安装 到每个工具的远端。 基于该信息,通过分配给工具的加工位置(P5-P4-P3-P2-P1; P6-P7-P8-P9-P10)上的预定工具依次进行加工,并且在通过第一工具 TL1),移动刀架(TBS)以将下一个刀具(TL2)定位在加工位置,并通过该刀具进行加工。 该方法包括:将工具架沿着Z轴移动到点Pr,在点X(X轴方向)移动刀架(TBS)时,刀具(TL1,TL2)将不接触工件(WK)的点Pr )与工件的纵向(Z轴方向)成直角,然后将刀架沿着X轴移动到所选刀具的X轴位置与X轴坐标重合的点Pt 由所选择的刀具开始加工的位置的值,然后使用所选择的刀具进行加工。
    • 6. 发明授权
    • Trace control method
    • 跟踪控制方法
    • US4639172A
    • 1987-01-27
    • US700703
    • 1985-01-25
    • Hajimu KishiMitsuo MatsuiHitoshi Matsuura
    • Hajimu KishiMitsuo MatsuiHitoshi Matsuura
    • B23Q35/12B23Q35/123B23Q35/121G05B19/24
    • B23Q35/123Y10T409/300896Y10T409/30196
    • Provided is a tracer control method in a master-slave type tracer system having first and second tracer units in each of which a tracer controller (TCC.sub.1, TCC.sub.2) generates velocity commands (V.sub.x, V.sub.y, V.sub.z) along respective axes by using a detection signal generated by a tracer head (TC.sub.1, TC.sub.2), motors (XM.sub.1, YM.sub.1, ZM.sub.1 ; XM.sub.2, YM.sub.2, ZM.sub.2) provided for respective axes are driven on the basis of the velocity commands and a workpiece (WK.sub.1, WK.sub.2) is subjected to tracer machining conforming to the profile of a model (MDL), tracer machining being performed by tracing a model (MDL.sub.1) with the tracer head (TC.sub.1) on the first tracer unit side and providing the second tracer unit with a move command on the basis of the tracing. In the tracer control method, the first tracer unit (TCC.sub.1, TCM.sub.1) produces the velocity commands (V.sub.x, V.sub.y, V.sub.z) in digital form to drive the motors (XM.sub.1, YM.sub.1, ZM.sub.1 ) for the respective axes, monitors a current position of a movable element, and sends a distance travelled along each axis during a predetermined time interval as a digital move command to the second tracer unit (TCC.sub.2, TCM.sub.2). A pulse distributor (PDC.sub.2) of the second tracer unit performs a pulse distribution calculation on the basis of move command data received as an input from the first tracer unit, thereby to control the motors (XM.sub.2, YM.sub.2, ZM.sub.2) of the respective axes on the side of the second tracer unit.
    • PCT No.PCT / JP84 / 00056 Sec。 371日期1985年1月25日第 102(e)日期1985年1月25日PCT提交1984年2月20日PCT公布。 第WO84 / 04718号公报 日期为1984年12月6日。提供了一种具有第一和第二示踪器单元的主从型示踪器系统中的示踪器控制方法,每个示踪器单元中的示踪器控制器(TCC1,TCC2)沿着生成速度命令(Vx,Vy,Vz) 通过使用由针对各轴设置的示踪头(TC1,TC2),电动机(XM1,YM1,ZM1,XM2,YM2,ZM2)生成的检测信号的各轴通过速度指令和工件(WK1 ,WK2)进行符合模型轮廓(MDL)的示踪加工,通过在第一示踪单元侧跟踪具有示踪头(TC1)的模型(MDL1)来执行示踪加工,并向第二示踪单元提供 基于跟踪的移动命令。 在跟踪器控制方法中,第一跟踪单元(TCC1,TCM1)产生数字形式的速度指令(Vx,Vy,Vz)来驱动各个轴的电机(XM1,YM1,ZM1),监视当前位置 可移动元件,并且在预定时间间隔内将沿着每个轴行进的距离作为数字移动命令发送到第二示踪单元(TCC2,TCM2)。 第二示踪单元的脉冲分配器(PDC2)基于从第一示踪单元作为输入接收的移动指令数据进行脉冲分布计算,从而控制各轴的电动机(XM2,YM2,ZM2) 第二示踪器单元的一侧。
    • 7. 发明授权
    • Machining area specifying method for an automatic programming system
    • 自动编程系统的加工区域指定方法
    • US4635185A
    • 1987-01-06
    • US680252
    • 1984-11-28
    • Hajimu KishiKunio TanakaTakashi Takegahara
    • Hajimu KishiKunio TanakaTakashi Takegahara
    • B23Q15/00G05B19/4093G06F15/46G05B19/18
    • G05B19/40937G05B2219/35431G05B2219/36257G05B2219/36318Y02P90/265
    • A machining area specifying method for an automatic programming system specifies a partial path to be machined, wherein the path is part of a closed path. The machining area specifying method includes the step of displaying a closed path trajectory form by a number of path blocks (b.sub.1, b.sub.2 . . . b.sub.16) on a display screen (105) by using path data prepared beforehand. First and second points (P.sub.5, P.sub.12) on the closed path are entered by designating the points with a cursor (CSR). A point (P.sub.6) on a first path (P.sub.5 .fwdarw.P.sub.6 .fwdarw. . . . P.sub.12) and a point (P.sub.13) on a second path which are connected to the first and second points, are designated by the cursor. An area to be machined is specified by operating a machining area input switch when the first path is being designated by the cursor in a case where the first path is to be machined, while the machining area input switch is operated when the second path is being designated by the cursor in a case where the second path is to be machined.
    • PCT No.PCT / JP84 / 00136 Sec。 371日期1984年11月28日 102(e)日期1984年11月28日PCT提交1984年3月27日PCT公布。 公开号WO84 / 03958 日期:1984年10月11日。自动编程系统的加工区域指定方法指定要加工的部分路径,其中路径是封闭路径的一部分。 加工区域指定方法包括通过使用预先准备的路径数据在显示屏幕(105)上通过多个路径块(b1,b2 ... b16)显示闭路径轨迹形式的步骤。 通过用光标(CSR)指定点来输入封闭路径上的第一和第二点(P5,P12)。 通过光标指定第一路径上的点(P6)和连接到第一和第二点的第二路径上的点(P13)和点(P13)。 当在第一路径被加工的情况下,当加工区域输入开关被操作时,在第一路径被光标指定的第一路径被操作时,通过操作加工区域输入开关来指定要加工的区域 在要加工第二路径的情况下由光标指定。
    • 10. 发明授权
    • Area cutting method
    • 区域切割方法
    • US4739489A
    • 1988-04-19
    • US767797
    • 1985-08-13
    • Hajimu KishiMasaki SekiTakashi Takegahara
    • Hajimu KishiMasaki SekiTakashi Takegahara
    • B23Q15/00G05B19/41G06F15/46G05B19/18
    • G05B19/41G05B2219/49381G05B2219/49392
    • The present invention provides an area cutting method for machining an area (AR) bounded by the curve (OLC) of a predetermined external shape previously using a unidirectional cutting motion. The invention has a step of performing cutting along an i-th cutting path (PT.sub.i), a step, executed after completion of cutting along the cutting path (PT.sub.i), of moving a tool (TL) in a cutting-feed mode along the curve (OLC) of the external shape from a machining end point (Q.sub.i) on the cutting path to a machining end point (Q.sub.i-1) on an (i-1)th cutting path (PT.sub.i-1) previously cut, a step of positioning the tool (TL) from the point (Q.sub.i-1) to a machining starting point (P.sub.i) on the cutting path (PT.sub.i), a step of moving the tool in the cutting-feed mode along the curve of the external shape from the machining starting point (P.sub.i) on the cutting path (PT.sub.i) to a machining starting point (P.sub.i+1) on the next cutting path (PT.sub.i+1), a step of moving the tool in the cutting-feed mode along the cutting path (PT.sub.i+1) to execute cutting along the cutting path (PT.sub.i+1), and a step of repeating these steps to perform area machining.
    • PCT No.PCT / JP84 / 00591 Sec。 371日期1985年8月13日 102(e)日期1985年8月13日PCT提交1984年12月14日PCT公布。 第WO85 / 02571号公报 日期:1985年6月20日。本发明提供一种区域切割方法,用于加工由先前使用单向切割运动的预定外部形状的由曲线(OLC)限定的区域(AR)。 本发明具有沿着第i条切割路径(PTi)执行切割的步骤,在沿着切割路径(PTi)完成切割之后执行的沿切割进给模式沿着切割进给模式移动工具(TL)的步骤 从切削路径上的加工终点(Qi)到先前切断的第(i-1)切削路径(PTi-1)上的加工终点(Qi-1)的外部形状的曲线(OLC) 将所述工具(TL)从所述切割路径(Pi)上的点(Qi-1)定位到加工起点(Pi)的步骤,沿着所述外部形状的曲线沿所述切削进给模式移动所述工具的步骤 从切割路径(PTi)上的加工起点(Pi)到下一切割路径(PTi + 1)的加工起点(Pi + 1),沿着切割进给模式沿着 切割路径(PTi + 1)沿着切割路径(PTi + 1)进行切割,以及重复这些步骤进行区域加工的步骤。