热词
    • 1. 发明授权
    • Apparatus for compacting foundry mold making materials
    • 压铸铸造模具制造装置
    • US4609033A
    • 1986-09-02
    • US736261
    • 1985-05-21
    • Alfons KobelNorbert DammWerner GeigerGunter Muller
    • Alfons KobelNorbert DammWerner GeigerGunter Muller
    • B22C15/00
    • B22C15/00
    • In a process for compacting foundry mold making material, that is loosely heaped in a closed mold space over a pattern, the surface of the material is acted on by a compressed gas with a pressure of at the most 8 bar. This gas is caused to undergo expansion out of an inlet space through a valve in an opening at a gas flow rate of over 50 kg/sec and with a pressure increase rate of over 300 bar/sec, into the mold space. The maximum pressure in the inlet space or antichamber is 20 bar. An apparatus for use in the method is made up of a pressure vessel, a mold flask placed thereunder having a filling frame and a pattern plate. The opening cross section of the valve is 50 to 150% of the horizontal cross section of the mold flask and is opened in a short time of the order of milliseconds.
    • 在用于压实铸造模具制造材料的方法中,其在模型上的封闭模具空间中松散地堆积,材料的表面被压力为8巴的压缩气体作用。 使得该气体通过开口中的阀从入口空间中以超过50kg / sec的气体流速和超过300巴/秒的压力增加速率进入模具空间。 入口空间或反炉子的最大压力为20巴。 用于该方法的装置由压力容器,放置在其下方的模具烧瓶组成,具有填充框架和图案板。 阀的开口横截面是模具烧瓶的水平横截面的50至150%,并且在几毫秒的数量级的短时间内打开。
    • 2. 发明授权
    • Apparatus for the compaction of foundry mold material
    • 铸造模具材料压实装置
    • US4620585A
    • 1986-11-04
    • US617920
    • 1984-06-06
    • Gunter MullerNorbert DammGunter Kuppinger
    • Gunter MullerNorbert DammGunter Kuppinger
    • B22C5/12B22C15/00B22C15/24
    • B22C15/00
    • An apparatus for the compaction of foundry mold making material using gas under pressure, comprises a pressure vessel for the such gas, a mold flask, a filling frame, a pattern plate and a pattern thereon onto which the material is to be loosely heaped. The flask, frame and plate form a mold chamber under the pressure vessel and between them there a valve is placed, the valve having a movable valve member adapted to open up a flow cross section of the valve predominantly under the effect of gas under pressure in the pressure vessel. The valve member is guided within the pressure vessel, with the valve member being adapted to perform an opening motion, which at least mainly directed into the mold chamber.
    • 用于在压力下使用气体压实铸造模具制造材料的装置包括用于这种气体的压力容器,模具烧瓶,填充框架,图案板和其上要松散堆叠的材料的图案。 烧瓶,框架和板在压力容器下形成模具室,并且在它们之间放置有阀,阀具有可移动的阀构件,该活动阀构件主要在压力下的气体的作用下打开阀的流动横截面 压力容器。 阀构件在压力容器内被引导,阀构件适于执行至少主要导向模具室的开启运动。
    • 3. 发明授权
    • Apparatus for compressing foundry moulding material by pressure gas
    • 压力气体压缩铸造成型材料的装置
    • US4619307A
    • 1986-10-28
    • US767274
    • 1985-08-02
    • Gunter MullerNorbert Damm
    • Gunter MullerNorbert Damm
    • B22C15/23B22C15/00
    • B22C15/00
    • In an apparatus for compressing foundry moulding material by pressure gas comprising a pressure vessel for the pressure gas forming an inlet pressure chamber, a moulding chamber positioned below it formed from moulding boxes with sand frames and a pattern plate with pattern on which the moulding material is loosely heaped up prior to compression and a large-area valve arranged between the pressure vessel and the moulding chamber, its closure member frees the valve opening in a few milliseconds, accompanied by the joint action of the pressure in the pressure vessel and thereby moves into the moulding chamber. The closure member is brought into the closed position by a pressure cylinder, whose piston is connected on the stroke side to a high pressure source and with its opposite side forms the movable termination of a gas-pressurized pressure reservoir, the high pressure side outflow being constructed in such a way that the pressure medium flows out at a speed of more than 10 m/s, accompanied by the simultaneous acceleration of the piston under the pressure in the pressure reservoir and the closure member into the open position.
    • PCT No.PCT / EP84 / 00392 Sec。 371日期1985年8月2日 102(e)日期1985年8月2日PCT提交1984年12月7日PCT公布。 第WO85 / 02568号公报 日期:1985年6月20日。在通过压力气体压缩铸造模制材料的设备中,包括用于形成入口压力室的压力气体的压力容器,位于其下方的模制室由具有砂框架的模制箱和具有 模制材料在压缩之前松散地堆积在其上并且大面积的阀布置在压力容器和模制室之间,其封闭构件在几毫秒内释放阀开口,伴随着压力的联合作用 压力容器,从而移动到模制室中。 关闭构件通过压力缸进入关闭位置,压力缸的活塞在行程侧连接到高压源,并且其相对侧形成气体加压压力储存器的可移动终端,高压侧流出为 以使压力介质以大于10m / s的速度流出的方式构造,伴随着在压力贮存器和关闭构件的压力下活塞同时加速到打开位置。
    • 8. 发明授权
    • Foundry mold forming production method and system
    • 铸造模具成型生产方法和系统
    • US5040587A
    • 1991-08-20
    • US490090
    • 1990-03-07
    • Gunter Muller
    • Gunter Muller
    • B22C11/10B22C11/04B22C15/02
    • B22C11/04B22C15/02
    • To permit greater through-put of a mold box filling and compacting system, mold boxes are moved vertically by a lifting table which passes through the station transport turret (10) to place a pattern or mold carrier plate (11, 12) in the mold box, and, upon continued vertical movement, placing a filling frame (14) about the mold box, and, upon further vertical movement, placing the thus formed subassembly in engagement with a sand filling apparatus (15). Upon subsequent lowering, the subassembly is returned to the turret, the turret rotates and places the subassembly in position for alignment with a compacting station, raises the subassembly to the compacting station for compaction of the sand about the model or pattern. The subassembly is then lowered; after lowering for a short distance, the fill pattern transport, for example another turret or pivotable arm system, is placed in interfering position with the filling frame so that it is stripped off the mold box which is then lowered on a removal conveyor, for removal from the compacting station; continued downward movement at the compacting station table then places the now freed pattern or model carrier plate again on the station transport turret for return to the first position. Sand filling and compaction can be carried out simultaneously on sequentially arriving mold boxes under control of a control system (C) which controls appropriate sequencing.
    • 为了允许模具盒填充和压实系统的更大的通过,模具箱通过提升台垂直移动,该提升台通过站运输转台(10),以将图案或模具托板(11,12)放置在模具 并且在连续的垂直移动时,将填充框架(14)放置在模具箱周围,并且在进一步的垂直运动时,将如此形成的子组件放置成与填砂装置(15)接合。 在随后的下降之后,子组件返回到转台,转台旋转并将子组件放置在与压实工位对准的位置,将组件升高到压实工位,以压实围绕模型或模式的沙子。 然后将组件降低; 在下降很短距离之后,填充图案传送,例如另一个转塔或可枢转臂系统被放置在与填充框架的干涉位置,使其从模具盒剥离,然后将其下降到移除输送机上,以便移除 从压实站; 在压实站台继续向下运动,然后将现在释放的模式或模型载板再次放置在站运输转塔上以返回到第一位置。 在控制适当测序的控制系统(C)的控制下,可以在顺序到达的模具箱上同时进行填沙和压实。
    • 9. 发明授权
    • Circuit arrangement for non-blocking switching of PCM channels in the
space and time domain
    • 用于在空间和时域中PCM通道的非阻塞切换的电路布置
    • US4823340A
    • 1989-04-18
    • US129959
    • 1987-12-04
    • Wolfgang GrassmanWalter BernerGunter Muller
    • Wolfgang GrassmanWalter BernerGunter Muller
    • H04Q11/08H04Q11/04
    • H04Q11/08
    • A circuit arrangement for switching PCM channels conducting baseband data signals, with serial data to be switched arriving at n input ports and being converted in blocks to parallel form, intermediately stored in a memory and converted to serial form again after read-out to be fed to n output ports each assigned to one or a plurality of destination addresses. The parallel data blocks are intermediately stored the first time in n input registers assigned to the n input ports. Thereafter, a second intermediate storage takes place in a RAM memory in such a manner that the data blocks are written in successively according to the sequence in which they arrived at a memory address which is counted up sequentially, or the data are subsequently intermediately stored in a RAM memory at a memory address which corresponds to the respective destination address. The data blocks are read out according to the number of the output port contained in the destination address or assigned to the destination address or according to their time position and are again intermediately stored in n output registers which are assigned to the respective n output ports.
    • 一种用于切换传输基带数据信号的PCM通道的电路装置,其中串行数据要切换到n个输入端口并被转换成并行形式的块,中间存储在存储器中,并且在读出之后再次被转换为串行形式以被馈送 到每个分配给一个或多个目的地地址的n个输出端口。 并行数据块首次存储在分配给n个输入端口的n个输入寄存器中。 此后,第二中间存储器以这样的方式发生在RAM存储器中,使得数据块根据它们到达的顺序被依次写入存储器地址,或者数据随后被中间存储在 在存储器地址处的RAM存储器对应于相应的目的地地址。 数据块根据目的地地址中包含的或分配给目的地地址的输出端口号或根据其时间位置读出,并再次中断存储在分配给各个n个输出端口的n个输出寄存器中。
    • 10. 发明授权
    • Foundry molding machine for box molds
    • 铸造模具成型机
    • US4126176A
    • 1978-11-21
    • US762519
    • 1977-01-26
    • Gunter MullerGerhard Blankenhorn
    • Gunter MullerGerhard Blankenhorn
    • B22C15/28B22C11/00B22C15/22
    • B22C15/28
    • The molding machine has injection apparatus which operates with compressed air for filling a molding box with molding sand and pre-compacting the sand. Vents for escape of spent air from the molding box are provided in a filling frame, which rests on the molding box during filling and compaction, and may also be provided on the surface of a pattern plate carrier and in a pressure plate against which the sand is finally consolidated by pressure exerted through said carrier. Exhaust means for the spent air comprise an annular passage on the outside of the filling frame. The pressure plate is formed to define nozzles through which the sand is injected into the molding box. Means are described for supplying sand and compressed air, for conveying a succession of molding boxes and for mounting, lifting and lowering the pattern plate carrier and withdrawing the latter for replacement of the pattern.
    • 成型机具有注射装置,其用压缩空气操作,用于填充具有型砂的模制箱并预先压实砂。 用于从成型箱排出废气的排气口设置在填充框架中,该填充框架在填充和压实期间搁置在成型箱上,并且还可以设置在图案板载体的表面上和砂浆 通过所述载体施加的压力最终被固化。 废空气的排气装置包括在填充框架的外部的环形通道。 压板形成为限定喷嘴,砂通过喷嘴注入模制箱中。 描述了用于供应砂和压缩空气的装置,用于输送一系列成型箱,以及用于安装,提升和降低图案板载体并取出图案板载体以更换图案。