会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明授权
    • Two-phase fast reroute with optimized traffic engineering
    • 两相快速重路由优化流量工程
    • US07859993B1
    • 2010-12-28
    • US12214375
    • 2008-06-18
    • Gagan L. ChoudhuryAngela Lan ChiuRobert Duncan DoverspikeGuangzhi Li
    • Gagan L. ChoudhuryAngela Lan ChiuRobert Duncan DoverspikeGuangzhi Li
    • G01R31/08G06F11/00G06F15/177G06F15/173H04J3/14H04J14/00H04L12/26H04L12/28H04L12/56H04B10/00
    • H04L45/125H04L41/0654H04L41/0681H04L41/145H04L45/00H04L45/22H04L45/28H04L47/728
    • Systems and methods are described for restoring IP traffic flows routed in an IP network in less than 100 ms after the IP network sustains a network failure. The systems and methods are a two-phase fast reroute that uses distributed optimized traffic engineering during backup tunnel restoration and end-to-end tunnel restoration that maximizes sharing among all independent failure scenarios and minimizes the total capacity, total cost, or a linear combination of the two. For defined failure condition scenarios, restoration traffic is routed using pre-computed backup tunnels using a constrained shortest path first method where link weights along the path are chosen dynamically and depend on available and total capacity of the link, latency, and other cost measures such as IP port costs. During the capacity allocation phase, the method reuses capacity already allocated for other independent failure scenarios as much as possible but also adds capacity, if necessary. When an actual IP network failure occurs, the backup tunnels are used to immediately restore service to affected IP network traffic flows. In parallel, end-to-end tunnels corresponding to each affected traffic flow are rerouted and once the rerouting process is complete, traffic is switched over from the old end-to-end tunnel routes (using backup tunnels) to new end-to-end tunnel routes without using backup tunnels.
    • 描述了系统和方法,用于在IP网络维持网络故障后在不到100ms内恢复在IP网络中路由的IP业务流。 系统和方法是一种两阶段快速重路由,其在备份隧道恢复和端到端隧道恢复期间使用分布式优化的流量工程,使所有独立故障情形之间的共享最大化,并最大限度地减少总容量,总成本或线性组合 的两个。 对于定义的故障条件情况,使用预先计算的备用隧道,使用受约束的最短路径第一种方法路由恢复流量,其中沿着路径的链路权重被动态地选择,并且取决于链路的可用和总容量,等待时间和其他成本措施, 作为IP端口成本。 在容量分配阶段,该方法尽可能地重用已分配给其他独立故障方案的容量,但如果需要,还会增加容量。 当发生实际的IP网络故障时,备份隧道用于立即将服务恢复到受影响的IP网络流量。 并行地,对应于每个受影响的业务流的端到端隧道被重新路由,一旦路由过程完成,流量将从旧的端到端隧道路由(使用备用隧道)切换到新的端到端隧道, 不使用备份隧道的末端隧道路由。