会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Optimizing the speed of an FC-AL switch domain in a data storage network
    • 优化数据存储网络中FC-AL交换机域的速度
    • US07561529B2
    • 2009-07-14
    • US11231402
    • 2005-09-20
    • Gregg S LucasRobert A KuboJohn C Elliott
    • Gregg S LucasRobert A KuboJohn C Elliott
    • H04L12/28
    • H04L41/083H04L12/423H04L41/0806H04L69/24
    • In a fibre channel, arbitrated loop (FC-AL) network environment, an operating speed of devices within a switch domain within the network is optimized. The FC-AL switch domain is isolated from an attached storage controller, and a first signal is transmitted to each of a plurality of storage devices within the domain. The first signal comprises a request that each storage device transmit inquiry data to a control and management node (CMN) within the domain. In response to receipt of the inquiry data from each storage device, the speeds at which each storage device is operable are identified and an operational speed is then established for the domain. The established speed may be the fastest speed at which all devices can operate. Alternatively, one or more slower devices may be bypassed and the established speed may be the fastest speed at which all remaining devices can operate.
    • 在光纤通道中,仲裁环路(FC-AL)网络环境中,优化了网络内交换机域内设备的运行速度。 FC-AL交换机域与附加的存储控制器隔离,并且第一信号被发送到域内的多个存储设备中的每一个。 第一信号包括每个存储设备将询问数据发送到域内的控制和管理节点(CMN)的请求。 响应于从每个存储设备接收到查询数据,识别每个存储设备可操作的速度,然后为域建立操作速度。 所建立的速度可能是所有设备可以运行的最快速度。 或者,可以旁路一个或多个较慢的设备,并且所建立的速度可以是所有剩余设备可以运行的最快速度。
    • 2. 发明授权
    • Cooling system control with clustered management services
    • 具有集群管理服务的冷却系统控制
    • US07287708B2
    • 2007-10-30
    • US10988370
    • 2004-11-12
    • Gregg S LucasRobert A KuboBrian J CagnoMatthew D Bomhoff
    • Gregg S LucasRobert A KuboBrian J CagnoMatthew D Bomhoff
    • F24F7/00F25D23/12H05K7/20
    • H05K7/20209F25B49/005G06F1/206G06F11/20G06F11/2033
    • A data processing unit including a first active cooling device configured to respond to a first control signal and a second active cooling device configured to respond to a second control signal. The control signals may be any type of control signal suitable to control the operation of the first and second active cooling devices. The data processing unit also includes a first control function selectively capable of providing the first control signal and/or the second control signal, and a second control function selectively capable of providing the first control signal and/or the second control signal. Logic associated with the first and second control functions is included to determine which of the control functions will provide which control signal at a specific time. Logic and/or switching or isolation apparatus is also included to prevent both the first and second control functions from attempting to provide one of the control signals simultaneously.
    • 一种数据处理单元,包括被配置为响应于第一控制信号的第一主动冷却装置和被配置为响应于第二控制信号的第二主动冷却装置。 控制信号可以是适于控制第一和第二主动冷却装置的操作的任何类型的控制信号。 数据处理单元还包括选择性地能够提供第一控制信号和/或第二控制信号的第一控制功能,以及选择性地能够提供第一控制信号和/或第二控制信号的第二控制功能。 包括与第一和第二控制功能相关联的逻辑以确定哪个控制功能将在特定时间提供哪个控制信号。 还包括逻辑和/或切换或隔离装置以防止第一和第二控制功能同时尝试提供一个控制信号。