会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • DRAIN BOARD INSTALLING DEVICE WITHOUT ANCHOR PLATE
    • 排水板安装没有固定板的设备
    • US20090196691A1
    • 2009-08-06
    • US12335455
    • 2008-12-15
    • Gan-Joo KIMGyo-Byum JinJae-Ok LeeDae-Gwang Yoon
    • Gan-Joo KIMGyo-Byum JinJae-Ok LeeDae-Gwang Yoon
    • E02B11/00
    • E02D3/103
    • A drain board installing device without an anchor plate is disclosed. A drain board temporary clamp device 146 comprises a protrusion body 321 provided at the center part of an inner wall of the through hole below the drain casing; a plate shaped arm 333 provided with a slit to allow the arm to ascend and descend at a predetermined length along a longitudinal direction of the drain casing within the through hole of the drain casing under the guide of the protrusion; and a T shaped rod 335 fixed to a lower part of the plate shaped arm, wherein, when the plate shaped arm 333 and the T shaped rod 335 descend toward the lower end of the drain casing within the maximum range by means of their load, a lower end part 333a of the plate shaped arm descends to the part where a lower end part 204a of the drain casing is located, and when the plate shaped arm 333 and the T shaped rod 335 move toward the upper end of the drain casing within the maximum range by means of their load, a T shaped end part 335a of the rod is caught in a slit 154 formed in the lower end part of the drain casing.
    • 公开了一种没有锚板的排水板安装装置。 排水板临时夹紧装置146包括:突出体321,其设置在排水壳体下方的通孔的内壁的中心部; 设置有狭缝的板状臂333,用于允许臂在突出部的引导件的排水壳体的通孔内沿着排水壳体的纵向方向以预定长度上升和下降; 以及固定在板状臂的下部的T字型杆335,其中,当板状臂333和T形杆335借助于其负载在最大范围内朝向排水套筒的下端下降时, 板状臂的下端部333a下降到排水壳体的下端部204a所在的部分,当板状臂333和T形杆335朝向排水壳体的上端移动时, 通过其负载的最大范围,杆的T形端部335a被卡在形成在排水壳体的下端部的狭缝154中。
    • 2. 发明授权
    • Drain board installing device without anchor plate
    • 排水板安装装置无锚板
    • US07614823B2
    • 2009-11-10
    • US12335455
    • 2008-12-15
    • Gan-Joo KimGyo-Byum JinJae-Ok LeeDae-Gwang Yoon
    • Gan-Joo KimGyo-Byum JinJae-Ok LeeDae-Gwang Yoon
    • E02B11/00
    • E02D3/103
    • A drain board installing device without an anchor plate is disclosed. A drain board temporary clamp device 146 comprises a protrusion body 321 provided at the center part of an inner wall of the through hole below the drain casing; a plate shaped arm 333 provided with a slit to allow the arm to ascend and descend at a predetermined length along a longitudinal direction of the drain casing within the through hole of the drain casing under the guide of the protrusion; and a T shaped rod 335 fixed to a lower part of the plate shaped arm, wherein, when the plate shaped arm 333 and the T shaped rod 335 descend toward the lower end of the drain casing within the maximum range by means of their load, a lower end part 333a of the plate shaped arm descends to the part where a lower end part 204a of the drain casing is located, and when the plate shaped arm 333 and the T shaped rod 335 move toward the upper end of the drain casing within the maximum range by means of their load, a T shaped end part 335a of the rod is caught in a slit 154 formed in the lower end part of the drain casing.
    • 公开了一种没有锚板的排水板安装装置。 排水板临时夹紧装置146包括:突出体321,其设置在排水壳体下方的通孔的内壁的中心部; 设置有狭缝的板状臂333,用于允许臂在突出部的引导件的排水壳体的通孔内沿着排水壳体的纵向方向以预定长度上升和下降; 以及固定在板状臂的下部的T字型杆335,其中,当板状臂333和T形杆335借助于其负载在最大范围内朝向排水套筒的下端下降时, 板状臂的下端部333a下降到排水壳体的下端部204a所在的部分,当板状臂333和T形杆335朝向排水壳体的上端移动时, 通过其负载的最大范围,杆的T形端部335a被卡在形成在排水壳体的下端部的狭缝154中。