会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明申请
    • OVERVOLTAGE CLIPPING DEVICE FOR A WIND TURBINE AND METHOD
    • 用于风力涡轮机的过压切割装置和方法
    • US20130234434A1
    • 2013-09-12
    • US13412662
    • 2012-03-06
    • Andre Langel
    • Andre Langel
    • H02P9/00H02H3/20
    • H02H3/003H02H3/20H02P9/007H02P2101/15
    • An overvoltage clipping device for clipping an overvoltage occurring at a main transformer of a wind turbine is provided. The overvoltage clipping device includes a detection unit for detecting an actual voltage level at the main transformer. The determination unit which is operatively connected to the detection unit determines whether the actual voltage level is above a predetermined reference voltage level. At least one switching unit is provided which is operatively connected to the determination unit for electrically coupling at least two transformer terminals of the main transformer. The control unit drives the switching unit if the detected actual voltage level is above the predetermined reference voltage level such that the at least two transformer terminals are electrically coupled to each other by the switching unit.
    • 提供一种用于限制在风力涡轮机的主变压器处发生的过电压的过电压限幅装置。 过电压限幅装置包括用于检测主变压器的实际电压电平的检测单元。 可操作地连接到检测单元的确定单元确定实际电压电平是否高于预定参考电压电平。 提供至少一个开关单元,其可操作地连接到确定单元,用于电耦合主变压器的至少两个变压器端子。 如果检测到的实际电压电平高于预定参考电压电平,则控制单元驱动开关单元,使得至少两个变压器端子通过开关单元彼此电耦合。
    • 7. 发明申请
    • TRANSFORMER ARRANGEMENT FOR WIND TURBINE AND METHOD FOR CONTROLLING VOLTAGE
    • 用于风力发电机的变压器装置和用于控制电压的方法
    • US20130301167A1
    • 2013-11-14
    • US13466193
    • 2012-05-08
    • Andre Langel
    • Andre Langel
    • H02H7/06
    • H02H7/06
    • A transformer arrangement for a wind energy system is described. The transformer arrangement includes a transformer core; a primary winding wound around the transformer core and adapted for being connected to an electrical load; a first secondary winding wound around the transformer core and adapted for being connected to a power source; and a control system for controlling the first transformer. Further, the transformer arrangement includes a part of a second secondary winding adapted for being connected to a power source and adapted for reducing at least one of for the voltage of the first secondary winding and the voltage applied to the electrical components of the wind turbine in the case of an overvoltage event.
    • 描述了用于风能系统的变压器装置。 变压器布置包括变压器铁心; 缠绕在变压器铁芯上并适于连接到电负载的初级绕组; 缠绕在变压器芯上并适于连接到电源的第一次级绕组; 以及用于控制第一变压器的控制系统。 此外,变压器布置包括适于连接到电源的第二次级绕组的一部分,并且适于减小第一次级绕组的电压和施加到风力涡轮机的电气部件的电压中的至少一个 过电压事件的情况。
    • 10. 发明授权
    • Overvoltage clipping device for a wind turbine and method
    • 风力发电机用过电压限幅装置及方法
    • US09088150B2
    • 2015-07-21
    • US13412662
    • 2012-03-06
    • Andre Langel
    • Andre Langel
    • H02P9/00H02H3/20H02H3/00H02P101/15
    • H02H3/003H02H3/20H02P9/007H02P2101/15
    • An overvoltage clipping device for clipping an overvoltage occurring at a main transformer of a wind turbine is provided. The overvoltage clipping device includes a detection unit for detecting an actual voltage level at the main transformer. The determination unit which is operatively connected to the detection unit determines whether the actual voltage level is above a predetermined reference voltage level. At least one switching unit is provided which is operatively connected to the determination unit for electrically coupling at least two transformer terminals of the main transformer. The control unit drives the switching unit if the detected actual voltage level is above the predetermined reference voltage level such that the at least two transformer terminals are electrically coupled to each other by the switching unit.
    • 提供一种用于限制在风力涡轮机的主变压器处发生的过电压的过电压限幅装置。 过电压限幅装置包括用于检测主变压器的实际电压电平的检测单元。 可操作地连接到检测单元的确定单元确定实际电压电平是否高于预定参考电压电平。 提供至少一个开关单元,其可操作地连接到确定单元,用于电耦合主变压器的至少两个变压器端子。 如果检测到的实际电压电平高于预定参考电压电平,则控制单元驱动开关单元,使得至少两个变压器端子通过开关单元彼此电耦合。