    • Method and system for estimating order scheduling rate and fill rate for configured-to-order business
    • 用于估计订单业务的订单调度率和填充率的方法和系统
    • US20070010904A1
    • 2007-01-11
    • US11176311
    • 2005-07-08
    • Feng ChengThomas ErvolinaSoumyadip GhoshBarun GuptaYoung Lee
    • Feng ChengThomas ErvolinaSoumyadip GhoshBarun GuptaYoung Lee
    • G06F19/00
    • G06Q10/06
    • A system and method estimates performance of a supply chain's available-to-promise (ATP) and scheduling functions under various environmental and process assumptions. The supply chain's transformation alternatives are identified using a plurality of modules constituting a supply chain model and including a demand planning module, a configuration planning module, an order scheduling module and a supply planning module, each of said modules being reconfigurable using various policies, which policies, taken together, specify a particular supply chain design that is to be analyzed. A supply chain data base is accessed by the supply chain model to retrieve data elements that dictate appropriate policies within said plurality of modules. The supply chain performance is simulated based on settings of the modules and other environmental factors including demand uncertainty, order configuration uncertainty, supplier flexibility, supply capacity, and demand skew. Based on the simulation, scheduling and fill rate of new business settings are evaluated to determine if improvements to the supply chain are satisfactory.
    • 一种系统和方法估计在各种环境和过程假设下,供应链的可承诺(ATP)和调度功能的性能。 使用构成供应链模型的多个模块来识别供应链的变换替代方案,包括需求计划模块,配置规划模块,订单调度模块和供应计划模块,每个所述模块可使用各种策略进行重新配置, 合并的政策规定了要分析的特定供应链设计。 供应链数据库由供应链模型访问以检索指示所述多个模块内的适当策略的数据元素。 供应链绩效根据模块设置和其他环境因素进行模拟,包括需求不确定性,订单配置不确定性,供应商灵活性,供应能力和需求偏差。 基于模拟,评估新业务设置的调度和填充率,以确定对供应链的改进是否令人满意。
    • 3. 发明授权
    • Integration of job shop scheduling with discreet event simulation for manufacturing facilities
    • 将工作车间调度与制造设施的谨慎事件模拟相结合
    • US07702411B2
    • 2010-04-20
    • US11756356
    • 2007-05-31
    • Sugato BagchiSoumyadip GhoshJayant R. Kalagnanam
    • Sugato BagchiSoumyadip GhoshJayant R. Kalagnanam
    • G06F19/00
    • G05B19/41865G05B19/41885G05B2219/32252G05B2219/32301G06Q10/06G06Q10/06312
    • A method and system for integrating job shop scheduling with discrete event simulation for manufacturing facilities are provided. In one aspect a simulator simulates discrete events of a facility using a job schedule generated by a scheduler. The simulator simulates the facility based on one or more local rules, one or more resources, and one or more parameters associated with said locals rules and said resources. The simulator further models said one or more parameters as random variables and using said random variables in its simulation of the facility. The scheduler receives feedback based on output from the simulating step. The feedback includes at least an instruction to the scheduler to include at least one of said one or more resource and to change said one or more parameters based on said modeling of said one or more parameters as random variables. The scheduler uses the feedback for generating an updated schedule.
    • 提供了一种将作业车间调度与制造设施的离散事件仿真相结合的方法和系统。 在一个方面,模拟器使用由调度器生成的作业调度来模拟设施的离散事件。 模拟器基于一个或多个本地规则,一个或多个资源以及与所述本地规则和所述资源相关联的一个或多个参数来模拟设备。 模拟器进一步将一个或多个参数模拟为随机变量,并在其设备的仿真中使用所述随机变量。 调度器基于模拟步骤的输出接收反馈。 所述反馈至少包括指令,所述调度器至少包括所述一个或多个资源中的至少一个,并且基于所述一个或多个参数的所述建模来将所述一个或多个参数改变为随机变量。 调度器使用反馈来生成更新的时间表。
    • 5. 发明申请
    • ASSESSMENT AND RATIONALIZATION OF RESILIENCY OF DATA CENTER STRATEGIES
    • 数据中心战略的评估和评估
    • US20130211871A1
    • 2013-08-15
    • US13369918
    • 2012-02-09
    • Soumyadip GhoshMarek PetrikStacey Ramos
    • Soumyadip GhoshMarek PetrikStacey Ramos
    • G06Q10/06
    • G06Q10/06
    • Assessing resiliency of facility configuration strategies, in one aspect, may employ a mathematical model representation of facility configuration. Organization environment factors and one or more desired performance metrics associated with the organization may be determined. A technical model specification that defines the configuration of facilities of the organization may be received, and a mathematical model representation of the configuration may be created. The mathematical model representation is solved for steady-state characteristics, and one or more values may be estimated respectively of the desired performance metrics based on the steady-state characteristics. The resiliency may be measured based on the estimated one or more values.
    • 在一个方面,评估设备配置策略的弹性可以采用设备配置的数学模型表示。 可以确定组织环境因素和与组织相关联的一个或多个期望的性能度量。 可以接收定义组织设施的配置的技术模型规范,并且可以创建配置的数学模型表示。 针对稳态特性求解了数学模型表示,并且可以基于稳态特性分别估计所需性能度量的一个或多个值。 弹性可以基于估计的一个或多个值来测量。