    • 10. 发明申请
    • METHODS AND SYSTEMS FOR APPLYING RUN-TO-RUN CONTROL AND VIRTUAL METROLOGY TO REDUCE EQUIPMENT RECOVERY TIME
    • 用于运行运行控制和虚拟计量的方法和系统,以减少设备恢复时间
    • US20160342147A1
    • 2016-11-24
    • US14716838
    • 2015-05-19
    • Applied Materials, Inc.
    • Jimmy IskandarJianping ZouParris C.M. HawkinsJames Moyne
    • G05B19/402G05B19/404
    • G05B23/0294G05B23/024
    • Described herein are methods, apparatuses, and systems for reducing equipment repair time. In one embodiment, a computer implemented method includes collecting, with a system, data including test substrate data or other metrology data and fault detection data for maintenance recovery of at least one manufacturing tool in a manufacturing facility and determining, with the system, a relationship between tool parameter settings for the at least one manufacturing tool and at least some collected data including the test substrate data. The method further includes utilizing zero or more virtual metrology predictive algorithms and at least some collected data to obtain a metrology prediction and applying multivariate run-to-run (R2R) control modeling to obtain a state estimation including a current operating region of the at least one manufacturing tool based on the test substrate data and obtain at least one tool parameter adjustment for at least one target parameter for the at least one manufacturing tool. Applying multivariate run-to-run (R2R) control modeling to obtain tool parameter adjustments for at least one manufacturing tool occurs after maintenance to reduce maintenance recovery time and to reduce requalification time.
    • 这里描述了用于减少设备维修时间的方法,装置和系统。 在一个实施例中,计算机实现的方法包括与系统一起收集包括测试基板数据或其他测量数据和故障检测数据的数据,用于在制造设备中维护至少一个制造工具的恢复,并且与系统确定关系 在至少一个制造工具的工具参数设置和包括测试衬底数据的至少一些收集的数据之间。 该方法还包括利用零个或多个虚拟测量预测算法和至少一些收集的数据来获得度量预测和应用多变量运行(R2R)控制建模,以获得包括至少至少的当前操作区域的状态估计 一个基于测试基板数据的制造工具,并为至少一个制造工具的至少一个目标参数获得至少一个刀具参数调整。 应用多变量运行(R2R)控制建模以获得至少一个制造工具的工具参数调整,在维护后发生,以减少维护恢复时间并减少重新定标时间。