会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Charge/discharge control device and power generation system
    • 充放电控制装置及发电系统
    • US08527110B2
    • 2013-09-03
    • US13426128
    • 2012-03-21
    • Takeshi NakashimaSouichi SakaiRyuzo Hagihara
    • Takeshi NakashimaSouichi SakaiRyuzo Hagihara
    • H02J7/04
    • H02J3/32H02J7/34Y02E70/30Y02P90/50
    • A charge/discharge control device capable of increasing the lifetime of a storage portion while suppressing effects of fluctuation in power generated by a power generator on a power grid is provided. This charge/discharge control device is so formed as to start charge/discharge control of the storage portion if an amount of change in power detected by a power detection portion detecting power passing through a prescribed portion of a line between the power generator and the power grid is at least a prescribed amount of change when the detected power changes from first power to second power while the detected power does not return to power in the vicinity of the first power from the second power within a first period from a time point when the detected power changes from the first power to the second power.
    • 提供一种能够在抑制发电机对电力网产生的电力波动的影响的同时增加存储部的寿命的充放电控制装置。 如果由功率检测部检测到的功率变化量检测到通过发电机和功率之间的线路的规定部分的功率,则该充放电控制装置形成为开始存储部的充放电控制 当检测到的功率从第一功率变化到第二功率时,网格至少是规定量的变化,同时在从第一功率到第二功率的时间点之后的第一时间段内,从第二功率在第一功率附近,检测到的功率不会恢复到第一功率附近的功率 检测到的功率从第一功率变化到第二功率。
    • 3. 发明申请
    • Charge/Discharge Control Device and Power Generation System
    • 充放电控制装置及发电系统
    • US20120239214A1
    • 2012-09-20
    • US13426128
    • 2012-03-21
    • Takeshi NakashimaSouichi SakaiRyuzo Hagihara
    • Takeshi NakashimaSouichi SakaiRyuzo Hagihara
    • G05F5/00H02P9/00
    • H02J3/32H02J7/34Y02E70/30Y02P90/50
    • A charge/discharge control device capable of increasing the lifetime of a storage portion while suppressing effects of fluctuation in power generated by a power generator on a power grid is provided. This charge/discharge control device is so formed as to start charge/discharge control of the storage portion if an amount of change in power detected by a power detection portion detecting power passing through a prescribed portion of a line between the power generator and the power grid is at least a prescribed amount of change when the detected power changes from first power to second power while the detected power does not return to power in the vicinity of the first power from the second power within a first period from a time point when the detected power changes from the first power to the second power.
    • 提供一种能够在抑制发电机对电力网产生的电力波动的影响的同时增加存储部的寿命的充放电控制装置。 如果由功率检测部检测到的功率变化量检测到通过发电机和功率之间的线路的规定部分的功率,则该充放电控制装置形成为开始存储部的充放电控制 当检测到的功率从第一功率变化到第二功率时,网格至少是规定量的变化,同时在从第一功率到第二功率的时间点之后的第一时间段内,从第二功率在第一功率附近,检测到的功率不会恢复到第一功率附近的功率 检测到的功率从第一功率变化到第二功率。