会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • Method to Cement a Perforated Casing
    • 水泥套管的方法
    • US20090014177A1
    • 2009-01-15
    • US11776800
    • 2007-07-12
    • Nathan HillearyRobert BucherMike Martin
    • Nathan HillearyRobert BucherMike Martin
    • E21B33/13
    • E21B33/14
    • The invention discloses a method of treating a zone of a well comprising a wellbore, a tube which is permeable to settable material, said tube forming an annulus with the wellbore; and wherein said zone is located in the annulus, the method comprises the steps of: (i) placing inside said tube a first plug; (ii) creating on said tube a first opening and a second opening, so that: the zone be located between said first and second openings and the first opening be located between said zone and said first plug; (iii) placing inside said tube a second plug, so that said second plug is located between said second opening and said zone; (iv) injecting a settable material inside said tube between said second and first plugs, so that settable material fills the annulus and the zone by passing through the first opening; and (v) eliminating said second plug.
    • 本发明公开了一种处理井的区域的方法,所述井的井包括井筒,对可固化材料是可渗透的管,所述管与井眼形成环形区; 并且其中所述区域位于所述环形空间中,所述方法包括以下步骤:(i)在所述管内放置第一塞子; (ii)在所述管上形成第一开口和第二开口,使得所述区域位于所述第一和第二开口之间,并且所述第一开口位于所述区域和所述第一插塞之间; (iii)在所述管内放置第二塞子,使得所述第二塞子位于所述第二开口和所述区域之间; (iv)在所述管内在所述第二和第一塞之间注入可固化材料,使得可固化材料通过所述第一开口填充所述环带和所述区域; 和(v)消除所述第二塞子。
    • 3. 发明授权
    • Method to cement a perforated casing
    • 水泥穿孔套管的方法
    • US07640983B2
    • 2010-01-05
    • US11776800
    • 2007-07-12
    • Nathan HillearyRobert BucherMike Martin
    • Nathan HillearyRobert BucherMike Martin
    • E21B33/14E21B33/161
    • E21B33/14
    • The invention discloses a method of treating a zone of a well comprising a wellbore, a tube which is permeable to settable material, said tube forming an annulus with the wellbore; and wherein said zone is located in the annulus, the method comprises the steps of: (i) placing inside said tube a first plug; (ii) creating on said tube a first opening and a second opening, so that: the zone be located between said first and second openings and the first opening be located between said zone and said first plug; (iii) placing inside said tube a second plug, so that said second plug is located between said second opening and said zone; (iv) injecting a settable material inside said tube between said second and first plugs, so that settable material fills the annulus and the zone by passing through the first opening; and (v) eliminating said second plug.
    • 本发明公开了一种处理井的区域的方法,所述井的井包括井筒,对可固化材料是可渗透的管,所述管与井眼形成环形区; 并且其中所述区域位于所述环形空间中,所述方法包括以下步骤:(i)在所述管内放置第一塞子; (ii)在所述管上形成第一开口和第二开口,使得所述区域位于所述第一和第二开口之间,并且所述第一开口位于所述区域和所述第一插塞之间; (iii)在所述管内放置第二塞子,使得所述第二塞子位于所述第二开口和所述区域之间; (iv)在所述管内在所述第二和第一塞之间注入可固化材料,使得可固化材料通过所述第一开口填充所述环带和所述区域; 和(v)消除所述第二塞子。