会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Vehicle-mounted electrical junction box
    • 车载电接线盒
    • US07733632B2
    • 2010-06-08
    • US12010158
    • 2008-01-22
    • Katsuya Ito
    • Katsuya Ito
    • H02B1/26H05K1/00
    • H05K7/026H01H50/021H01H50/12H01H85/205H01H2050/049H01H2085/208H05K1/0263H05K2201/10053H05K2201/10181H05K2201/10272H05K2201/10446
    • A casing includes a first casing member and a second casing member. The first casing member is provided on a side with a fuse module mounting section having a side opening. The second casing member is provided on the same side as the first casing member with a relay module mounting section having a side opening and extending downward. An ECU mounting frame extends from a bottom wall of the second casing member. An ECU is disposed on a second side of a bottom wall of the second casing member and in parallel with the relay module mounting section. A fuse module is attached to the fuse module mounting section to receive fuses. A relay module is attached to the relay module mounting section to receive relays. The fuse module and relay module that generate heat are disposed on a side of the casing in a vertical direction.
    • 壳体包括第一壳体构件和第二壳体构件。 第一壳体构件设置在具有侧开口的熔断器模块安装部分的一侧上。 第二壳体构件设置在与第一壳体构件相同的侧上,具有侧开口并向下延伸的中继模块安装部。 ECU安装框架从第二壳体构件的底壁延伸。 ECU设置在第二壳体构件的底壁的第二侧并与继电器模块安装部并联。 保险丝模块连接到保险丝模块安装部分以接收保险丝。 继电器模块连接到继电器模块安装部分以接收继电器。 产生热量的保险丝模块和继电器模块沿垂直方向设置在壳体的一侧。
    • 4. 发明申请
    • Vehicle-mounted electrical junction box
    • 车载电接线盒
    • US20080247133A1
    • 2008-10-09
    • US12010158
    • 2008-01-22
    • Katsuya ITO
    • Katsuya ITO
    • H05K7/10
    • H05K7/026H01H50/021H01H50/12H01H85/205H01H2050/049H01H2085/208H05K1/0263H05K2201/10053H05K2201/10181H05K2201/10272H05K2201/10446
    • A casing includes a first casing member and a second casing member. The first casing member is provided on a side with a fuse module mounting section having a side opening. The second casing member is provided on the same side as the first casing member with a relay module mounting section having a side opening and extending downward. An ECU mounting frame extends from a bottom wall of the second casing member. An ECU is disposed on a second side of a bottom wall of the second casing member and in parallel with the relay module mounting section. A fuse module is attached to the fuse module mounting section to receive fuses. A relay module is attached to the relay module mounting section to receive relays. The fuse module and relay module that generate heat are disposed on a side of the casing in a vertical direction.
    • 壳体包括第一壳体构件和第二壳体构件。 第一壳体构件设置在具有侧开口的熔断器模块安装部分的一侧上。 第二壳体构件设置在与第一壳体构件相同的侧上,具有侧开口并向下延伸的中继模块安装部。 ECU安装框架从第二壳体构件的底壁延伸。 ECU设置在第二壳体构件的底壁的第二侧并与继电器模块安装部并联。 保险丝模块连接到保险丝模块安装部分以接收保险丝。 继电器模块连接到继电器模块安装部分以接收继电器。 产生热量的保险丝模块和继电器模块沿垂直方向设置在壳体的一侧。
    • 5. 发明申请
    • Integrated coal gasification combined cycle plant
    • 综合煤气化联合循环厂
    • US20070137169A1
    • 2007-06-21
    • US11705445
    • 2007-02-13
    • Shigeyasu IshigamiYuichiro KitagawaKatsuya Ito
    • Shigeyasu IshigamiYuichiro KitagawaKatsuya Ito
    • F02C3/28
    • F02C3/28F01K23/067Y02E20/16Y02E20/18
    • A highly efficient integrated coal gasification combined cycle plant is provided having a dust removing system which can reliably exhibit a desired dust removing performance and which can maintain high operational reliability such that the occurrence of dust leaks is prevented. The integrated coal gasification combined cycle plant has a coal gasification furnace configured to yield a coal gas by gasification of coal, a gas turbine generator driven with a gas turbine which is operated using the coal gas as fuel and which discharges a high-temperature combustion exhaust gas, an exhaust heat recovery boiler configured to recover heat from the high-temperature combustion exhaust gas and to produce steam, and a steam turbine generator driven with a steam turbine operated using the steam produced by the exhaust heat recovery boiler. In the above plant, a flue gas desulfurization device configured to desulfurize the coal gas is provided downstream of the gas turbine and the exhaust heat recovery boiler, and the dust removing system which is configured to recover char and to remove dust from the coal gas has at least one line containing a cyclone, a front-stage filter, and a rear-stage filter.
    • 提供了一种高效率的一体式煤气化联合循环装置,其具有可以可靠地呈现期望的除尘性能并且可以保持高操作可靠性的除尘系统,从而防止了灰尘泄漏的发生。 综合煤气化联合循环装置具有煤气化炉,其通过煤气化产生煤气,由燃气轮机驱动的燃气轮机,其使用煤气作为燃料运转,并且排出高温燃烧排气 气体,被配置为从高温燃烧废气中回收热量并产生蒸汽的废热回收锅炉,以及由使用由废热回收锅炉产生的蒸汽操作的蒸汽轮机驱动的蒸汽轮机发电机。 在上述工厂中,在燃气轮机和废热回收锅炉的下游设置有用于对煤气进行脱硫的烟道气脱硫装置,并且构成为回收炭并除去煤气的粉尘的除尘系统具有 包含旋风分离器,前级过滤器和后级过滤器的至少一行。