会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Polarization multiplexing with different DPSK modulation schemes and system incorporating the same
    • 具有不同DPSK调制方案的极化复用和包含其的系统
    • US08270847B2
    • 2012-09-18
    • US12364171
    • 2009-02-02
    • Hongbin ZhangJin-Xing Cai
    • Hongbin ZhangJin-Xing Cai
    • H04B10/04
    • H04B10/5053H04B10/50577H04B10/5561H04B10/677H04J14/06
    • Polarization multiplexing with different differential phase shift keying (DPSK) schemes generally uses DPSK modulated signals modulated using different DPSK modulation schemes and combined with orthogonal polarizations relative to each other. The different DPSK modulation schemes may use different DPSK phase shifts to represent data, such as a regular DPSK modulation scheme and a π/2 DPSK modulation scheme. By using different DPSK modulation schemes to represent data on the orthogonally polarized signals, the DPSK demodulators may effectively separate the orthogonally polarized signals using the property of the DPSK receivers. To optimize performance, the DPSK modulated signals may also be bit-interleaved when combined with orthogonal polarization.
    • 使用不同差分相移键控(DPSK)方案的偏振复用通常使用使用不同DPSK调制方案调制的DPSK调制信号并相对于彼此结合正交偏振。 不同的DPSK调制方案可以使用不同的DPSK相移来表示诸如常规DPSK调制方案和& R / DPSK调制方案的数据。 通过使用不同的DPSK调制方案来表示正交极化信号上的数据,DPSK解调器可以使用DPSK接收机的性质来有效地分离正交偏振信号。 为了优化性能,当与正交极化组合时,DPSK调制信号也可以被比特交织。
    • 9. 发明申请
    • REAL-TIME RISK DRIVEN PRODUCT DEVELOPMENT MANAGEMENT (RDPDM) AND ITS PROJECT DELIVERABLE MAP
    • 实时风险驱动产品开发管理(RDPDM)及其项目可交付地图
    • US20170011315A1
    • 2017-01-12
    • US14797147
    • 2015-07-12
    • JIN XING XIAO
    • JIN XING XIAO
    • G06Q10/06
    • G06Q10/0635
    • In 2013, Jin Xing Xiao created a patent “RISK DRIVEN PRODUCT DEVELOPMENT SYSTEM” (publication #US-2015-0134398-A1) which provides a generally structured product development process driven by risk management. This new patent plans to extend the above studies and researches in the following areas:Developing a wide range of FMEA tools. A new set of FMEA tools includes the Market FMEA, Service FMEA, System FMEA, Application FMEA, Design FMEA, Software FMEA, Clinical FMEA, Compliance FMEA, Package FMEA, Process FMEA, and Supplier FMEA (collectively called as xFMEA).Driving a product development system by real-time risk management. In any development phases/sub-phases, risk management is implemented on each project deliverable to ensure its potential risks are reduced as far as possible. When the product development flows from one phase/sub-phase to the next one, the overall residual risks are verified that the benefits outweigh risks.Generating an intuitively customized project deliverable map. Based on a particular customer product, a customized project deliverable map is created systematically. Each deliverable requirement is assigned to a specific development group (Market, Technical Service, R&D, Medical Science, Regulatory Affairs, Supplier Quality, Quality, Operations, Risk Management, and Project) and scheduled to a specific product development sub-phase and phase. Furthermore, any deliverable requirements are allowed to be reassigned to another group and development phase as needed. An example map with 166 project deliverable requirements are provided.
    • 生成直观定制的项目交付地图。 基于特定的客户产品,系统地创建了定制的项目可交付地图。 每个可交付的要求分配给具体的开发团队(市场,技术服务,研发,医学,法规事务,供应商质量,质量,运营,风险管理和项目),并计划在特定的产品开发阶段和阶段。 此外,任何可交付的要求都可以根据需要重新分配到另一个组和开发阶段。 提供了166个项目交付要求的示例图。
    • 10. 发明申请
    • RISK DRIVEN PRODUCT DEVELOPMENT PROCESS SYSTEM
    • 风险驱动产品开发流程系统
    • US20150134398A1
    • 2015-05-14
    • US14075947
    • 2013-11-08
    • Jin Xing Xiao
    • Jin Xing Xiao
    • G06Q10/06
    • G06Q10/0635Y02P90/86
    • New product developments are getting more and more risks due to the following uncertainties. The technology uncertainties are caused by the immaturity of components or system integration. The company-internal uncertainties are resulted from an inefficiency and unqualified Product Development Process (PDP). The customer requirement uncertainties are induced by levels of understanding of customer requirements or customer requirement changes. The market uncertainties are due to the actions of competitors or environmental influence.In order to comfortably deal with above uncertainties, a new Risk driven Product Development Process (RPDP) is invented to facilitate new product developments. This method has phases of Product Plan, Product Design, Process Development, and Product Service which are communicated by FMEA tools. Within each phase, specific FMEA tools are dominated to manage potential risks and initiate mitigated actions if their risk levels are unacceptable. Particularly, a new FMEA Frisbee uses to determine the optimal mitigated actions. Once all potential risks are controlled under the acceptance levels, the process is flowed to the next phase.The other new tools in this invention include Interaction Matrix, Integration Matrix, Spreadsheet of Market Requirement Analysis, and FMEAs Templates.
    • 由于以下不确定因素,新产品开发面临越来越多的风险。 技术的不确定性是由组件的不成熟或系统集成引起的。 公司内部的不确定性是由于低效率和不合格的产品开发流程(PDP)。 客户需求的不确定性是由对客户要求或客户需求变化的了解程度引起的。 市场不确定性是由于竞争对手的行为或环境影响。 为了舒适地应对上述不确定性,发明了一个新的风险驱动型产品开发流程(RPDP),以促进新产品开发。 该方法具有由FMEA工具传达的产品计划,产品设计,过程开发和产品服务的阶段。 在每个阶段中,特定的FMEA工具主要用于管理潜在风险,并且如果风险水平不能接受,则启动缓解措施。 特别地,新的FMEA飞盘用于确定最佳缓解措施。 一旦所有潜在风险都受到接受程度的控制,该流程将进入下一阶段。 本发明中的其他新工具包括交互矩阵,集成矩阵,市场需求分析电子表格和FMEA模板。