会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • METHOD FOR TRANSFERRING ALARM DATA BETWEEN A BROKEN-DOWN RAILWAY VEHICLE AND A CONTROL CENTER AND ASSOCIATED DEVICE
    • 一种断路器与控制中心及相关设备之间传输报警数据的方法
    • US20120242484A1
    • 2012-09-27
    • US13266819
    • 2010-04-30
    • Didier Van Den AbeeleMarion BerbineauMartine Wahl
    • Didier Van Den AbeeleMarion BerbineauMartine Wahl
    • G08B1/08
    • B61L27/0005B61L15/0027B61L27/0094
    • The invention relates to a method for transferring alarm data between a first broken-down train (A) and a control centre (2) comprising: evaluating the state of the first train; and then the state of the first train corresponding to a break down; determining if it is possible to establish a first link between the first train and a ground infrastructure (1) connected to the centre; if not, establishing a backup radio link between first independent communication means (50) of the first train and second independent communication means (50′) of a second train rolling in the vicinity of the first train; transferring the alarm data concerning the first train and storing the same into storage means of the second train; establishing a second link between the second train and the ground infrastructure and transferring the alarm data concerning the first train from the second train to the centre.
    • 本发明涉及一种用于在第一分解列车(A)和控制中心(2)之间传送报警数据的方法,包括:评估第一列车的状态; 然后第一列车的状态对应于分解; 确定是否可能建立第一列车和连接到中心的地面基础设施(1)之间的第一连杆; 如果不是,则在第一列车的第一独立通信装置(50)和在第一列车附近滚动的第二列车的第二独立通信装置(50')之间建立备用无线电链路; 传送关于第一列车的报警数据并将其存储在第二列车的存储装置中; 建立第二列车和地面基础设施之间的第二连杆,并将关于第一列车的报警数据从第二列车传送到中心。
    • 2. 发明授权
    • Method for transferring alarm data between a broken-down railway vehicle and a control center and associated device
    • 在分解铁路车辆与控制中心及相关设备之间传送报警数据的方法
    • US09266544B2
    • 2016-02-23
    • US13266819
    • 2010-04-30
    • Didier Van Den AbeeleMarion BerbineauMartine Wahl
    • Didier Van Den AbeeleMarion BerbineauMartine Wahl
    • G08B1/08B61L27/00B61L15/00
    • B61L27/0005B61L15/0027B61L27/0094
    • The invention relates to a method for transferring alarm data between a first broken-down train (A) and a control center (2) comprising: evaluating the state of the first train; and then the state of the first train corresponding to a break down; determining if it is possible to establish a first link between the first train and a ground infrastructure (1) connected to the center; if not, establishing a backup radio link between first independent communication means (50) of the first train and second independent communication means (50′) of a second train rolling in the vicinity of the first train; transferring the alarm data concerning the first train and storing the same into storage means of the second train; establishing a second link between the second train and the ground infrastructure and transferring the alarm data concerning the first train from the second train to the center.
    • 本发明涉及一种用于在第一分解列车(A)和控制中心(2)之间传送报警数据的方法,包括:评估第一列车的状态; 然后第一列车的状态对应于分解; 确定是否可能建立第一列车和连接到中心的地面基础设施(1)之间的第一连杆; 如果不是,则在第一列车的第一独立通信装置(50)和在第一列车附近滚动的第二列车的第二独立通信装置(50')之间建立备用无线电链路; 传送关于第一列车的报警数据并将其存储在第二列车的存储装置中; 建立第二列车和地面基础设施之间的第二连杆,并将关于第一列车的报警数据从第二列车传送到中心。