会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Guide rail and link chain for chain saw
    • 链锯导轨和链条链
    • US4896648A
    • 1990-01-30
    • US257307
    • 1988-08-23
    • Willi Boller
    • Willi Boller
    • B27B17/02B27B17/12B27B33/14B28D1/08B28D1/12
    • B28D1/082B27B17/02B27B17/12B27B33/147B28D1/124
    • On two opposite long narrow sides of a guide rail (1) of a chain saw for stone are arranged slide rails (3) of plastic. The slide rails (3) are located between the side walls (18, 19) of the guide rail. A link chain (2) consists of slide elements (6) and pairs of side guide members (7, 8) which are joined with each other through links (5). The slide elements (6) lie, on one side, on a surface (15) of the slide rail (3) and have, on the opposite side, cutting plates (4). In the slide rail (3) are arranged central coolant channels (13) which are connected with the coolant feed present in the core of the guide rail (1). The side guiding of the chain (2) is assured through the side guide members (7, 8) lying against the side surfaces (11, 12) of the slide rail (3).
    • PCT No.PCT / CH87 / 00144 Sec。 371日期1988年8月23日 102(e)日期1988年8月23日PCT提交1987年10月20日PCT公布。 出版物WO88 / 04602 日期:1988年6月30日。在用于石头的链锯的导轨(1)的两个相对的较长的窄边上设置有塑料的滑轨(3)。 滑轨(3)位于导轨的侧壁(18,19)之间。 链节(2)由滑动元件(6)和通过连杆(5)相互连接的一对侧引导件(7,8)组成。 滑动元件(6)一侧位于滑轨(3)的表面(15)上,并且在相对侧上具有切割板(4)。 在滑轨(3)中布置有中心冷却剂通道(13),其与存在于导轨(1)的芯体中的冷却剂进料连接。 通过位于滑轨(3)的侧面(11,12)上的侧引导构件(7,8)来确保链条(2)的侧向引导。