会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 27. 发明授权
    • Paving machine
    • 铺路机
    • US09435084B2
    • 2016-09-06
    • US14301903
    • 2014-06-11
    • Northeast Asphalt, Inc.
    • John C. Bartoszek
    • E01C19/48E01C7/18E01C11/02E01C19/08E01C19/17
    • E01C19/174E01C7/185E01C11/02E01C19/002E01C19/004E01C19/08E01C19/17E01C19/176E01C19/178E01C19/48E01C2301/20Y02A30/333
    • A method of paving a roadway that includes a first lane and a second lane adjacent the first lane includes applying, a first asphalt layer over the first lane of the roadway. The first asphalt layer includes a first side edge defining a portion of a joint between the first asphalt layer and a second asphalt layer. The method also includes smoothing the first asphalt layer on the first lane of the roadway, applying an additive on the first side edge to soften the first side edge, and applying the second asphalt layer over the second lane of the roadway. The second asphalt layer includes a second side edge abutting the first side edge such that the second side edge mixes with the first side edge. The first side edge and the second side edge form the joint between the first asphalt layer and the second asphalt layer.
    • 包括与第一车道相邻的第一车道和第二车道的道路铺路方法包括在道路的第一车道上施加第一沥青层。 第一沥青层包括限定第一沥青层和第二沥青层之间的接合部分的第一侧边缘。 所述方法还包括平滑道路第一通道上的第一沥青层,在第一侧边缘上施加添加剂以软化第一侧边缘,以及将第二沥青层施加在道路的第二车道上。 第二沥青层包括邻接第一侧边缘的第二侧边缘,使得第二侧边缘与第一侧边缘混合。 第一侧边缘和第二侧边缘形成第一沥青层和第二沥青层之间的接合部。
    • 30. 发明授权
    • Method for bonding prepared substrates for roadways using a low-tracking asphalt emulsion coating
    • 使用低跟踪沥青乳液涂层粘结准备的道路基材的方法
    • US07918624B2
    • 2011-04-05
    • US12403181
    • 2009-03-12
    • Roy B. Blacklidge
    • Roy B. Blacklidge
    • E01C7/24
    • E01C7/185C08L95/005Y10T428/31815C08L2666/74
    • A method for bonding together an existing substrate layer and a pavement layer, such that a strong adhesive bond is formed by using a tack coat, provided by an asphalt emulsion, in between the layers as the bond coat. The tack coat layer is a low-tracking coating which cures quickly such that the pavement layer may be applied to the substrate, hours to days after the emulsion is applied to the substrate. The asphalt emulsion comprises at least a first phase of from about 30% to about 70% of an asphalt composition, about 30% to about 70% water, and about 0.1% to about 3.0% emulsifying agent, stabilizer and/or additives, or 0.1% to about 30% if polymeric or other additives are also included.
    • 一种用于将现有基底层和路面层结合在一起的方法,使得通过使用由沥青乳液提供的粘性涂层在作为粘合涂层的层之间形成强粘结剂。 粘着涂层是一种低跟踪涂层,其快速固化,使得路线层可以施加到基材上,在将乳液施加到基材上几小时至数天之后。 沥青乳液至少包含约30%至约70%的沥青组合物,约30%至约70%的水和约0.1%至约3.0%的乳化剂,稳定剂和/或添加剂的第一相,或 如果还包括聚合物或其他添加剂,则为0.1%至约30%。