热词
    • 21. 发明申请
    • INSULATED FLYING TABLE CONCRETE FORM, ELECTRICALLY HEATED FLYING TABLE CONCRETE FORM AND METHOD OF ACCELERATING CONCRETE CURING USING SAME
    • 绝缘飞行台混凝土结构,电热式飞行台混凝土结构及加速混凝土固化方法
    • US20150069664A1
    • 2015-03-12
    • US14480967
    • 2014-09-09
    • Romeo Ilarian Ciuperca
    • Romeo Ilarian Ciuperca
    • B28B7/34B28B1/14B28B5/00
    • B28B7/0032B28B11/245B28B17/0081C04B40/04
    • The invention comprises a flying table concrete form. The flying table concrete form comprises a concrete forming deck comprising a first concrete forming panel having a first primary surface adapted for forming and contacting plastic concrete and a second primary surface opposite the first primary surface, a layer of insulating material contacting and substantially covering the second primary surface of the first concrete forming panel, and a second panel contacting and substantially covering the layer of insulating material. The flying table concrete form also comprises a plurality of deck support members extending transversely with respect to the second panel, wherein the first concrete forming panel defines a plane and wherein no portion of the deck support members are in the plane defined by the first concrete forming panel. A method of using the flying table concrete form is also disclosed.
    • 本发明包括飞表混凝土形式。 飞表混凝土形式包括混凝土成形板,该混凝土成形板包括具有适于形成和接触塑料混凝土的第一主表面和与第一主表面相对的第二主表面的第一混凝土形成板,与绝缘材料接触并基本覆盖第二主表面的第二层 第一混凝土成形板的主表面,以及接触并基本上覆盖绝缘材料层的第二板。 飞表混凝土形式还包括相对于第二面板横向延伸的多个甲板支撑构件,其中第一混凝土形成板限定一平面,并且其中甲板支撑构件的任何部分不在由第一混凝土成形 面板。 还公开了使用飞表混凝土形式的方法。
    • 23. 发明申请
    • MANUFACTURING CONCRETE
    • 制造混凝土
    • US20140183776A1
    • 2014-07-03
    • US14235175
    • 2012-07-24
    • Mark Jardine
    • Mark Jardine
    • B29D99/00
    • B29D99/001B28B1/0935B28B7/0032B28B7/186B28B7/28B28B7/285B28B23/0006B28B23/06
    • A method for manufacturing hollow-core concrete slabs, the method comprising: preparing a mould by suspending in the mould between first and second end-pieces a plurality of substantially parallel elongate void formers; filling the mould with a wet concrete mix up to the crown of the void formers; laying an inert pliable filamentary sheet on the surface of the concrete with filaments of the sheet extending transverse to the long axes of the elongate void formers, the filamentary sheet being restrained so as to resist movement of the concrete mix when the void formers are withdrawn from the mix; further filling the mould with the wet concrete mix over the filamentary sheet; and, subsequently forming hollow channels in the wet concrete mix by withdrawing the plurality of void formers from the concrete mix through the second end-piece.
    • 一种制造中空混凝土板的方法,该方法包括:通过在第一和第二端部之间的模具中悬挂多个基本上平行的长孔形成器来制备模具; 用湿混凝土混合物填充模具直到孔形成器的顶部; 在混凝土的表面上铺设惰性柔韧的丝状片材,其中片材的长丝横向于细长的空心形成器的长轴线延伸,丝状片材受到限制,以便当空心成形器从 混合 进一步用纤维片上的湿混凝土混合物填充模具; 随后通过第二端件从混凝土混合物中抽出多个空心成形器,从而在湿混凝土混合物中形成中空通道。
    • 25. 发明授权
    • Road transportable segmental concrete railroad tie long-line production
system
    • 道路运输段混凝土铁路线长线生产系统
    • US6059199A
    • 2000-05-09
    • US16830
    • 1998-01-30
    • Anders L. U. ErikssonDerek FirthRick W. PetersenJohn G. White
    • Anders L. U. ErikssonDerek FirthRick W. PetersenJohn G. White
    • B28B7/00B28B23/04B28B23/06E01B3/00E01B9/14E01B21/04E01B31/20
    • B28B7/0032B28B23/043B28B23/06
    • A road transportable concrete railroad long-line tie molding system is described in which a rigid horizontal metal stressing frame is assembled from transportable sub-frame segments. The sub-frame segments are releasably connected in axially aligned end-to-end relation, and include parallel longitudinal reaction members. In a preferred form, the sub-frame segments are convertible from inoperative transport conditions to extended operative conditions. Footings are provided along the stressing frame length to engage the sub-frame segments to releasably mount the sub-frame segments in axial alignment and stabilize the reaction members against lateral deflection during compressive loading. A plurality of conventional gang tie molds having upwardly open elongated mold cavities are releasably received in end-to-end alignment along the framework. A reinforcing wire anchor is provided on the sub-frame at the dead end of the framework and a tensioner is located at the live end of the framework. The tensioner and anchors are adapted to receive and position an array of longitudinal reinforcing wires within the mold cavities. The wires are placed in tension against the reaction members, which react in compression. Both tension and compression forces are isolated from the tie molds. The tensioning forces applied between the tensioner and anchors are distributed about a centroid. The reaction members are positioned in concentricity with the centroid to avoid eccentric loading of the reaction members.
    • 描述了一种可运输的混凝土轨道长线连接成型系统,其中刚性水平金属应力框架由可运输的子框架段组装。 子框架段以轴向对齐的端对端关系可释放地连接,并且包括平行的纵向反作用构件。 在优选形式中,子框架段可从不工作的运输条件转换为延长的操作条件。 沿着应力框架长度设置底脚以接合子框架段以可释放地将子框架段安装在轴向对准中并且在压缩加载期间使反作用构件抵抗横向偏转稳定。 具有向上开口的细长模腔的多个常规组合连接模具沿着框架以端对端对准的方式被可释放地接收。 在框架的死端处的子框架上设置加强丝锚,并且张紧器位于框架的活端。 张紧器和锚固件适于在模具腔内容纳和定位纵向加强线阵列。 电线被放置在与压缩反应的反应构件的张力上。 张力和压缩力均与扎带模具隔离。 施加在张紧器和锚之间的张紧力分布在质心上。 反应构件与质心同心地定位,以避免反应构件的偏心加载。
    • 27. 发明授权
    • Concrete mould and method of moulding concrete panels
    • 混凝土模具和混凝土板成型方法
    • US4378203A
    • 1983-03-29
    • US150041
    • 1980-08-15
    • Kandiah T. Nayagam
    • Kandiah T. Nayagam
    • B28B7/02B28B7/00B28B7/10B28B7/18B28B7/34B28B23/18B28B23/06
    • B28B7/0032B28B23/18B28B7/186B28B7/34Y10S425/044Y10S425/124
    • A concrete mould employs resilient side shuttering, made of rubber for example, which is prevented from deflecting, when concrete is poured, by tensioning wires extending along the length of the shuttering. Pieces of the shuttering, forming the sides of a casting box, extend between fixed end plates having a series of holes to receive the tensioning wires for adjusting the modular width of panels cast in the box. A series of apertures is provided in each piece of side shuttering so that pneumatic core formers can be inserted through aligned apertures so as to extend across the casting box. Different types of joint formers, either fully or partly resilient, can be located about the core formers, each joint former having a series of grooves to receive reinforcement or tensioning wires or rods. When inflated the pneumatic core former locks the joint formers in place. Opening formers can be made from the shuttering and the joint formers. Standard reinforcement cages can be located in the casting box at modular position corresponding with aligned apertures in the side pieces of shuttering. The modular positions are digitally coded to enable the casting process to be automated by a machine travelling on rails along the length of a casting bed which supports the side shuttering and end plates. The machine stops at the modular position to locate the respective formers and/or reinforcement cages and it also carries out automatic functions such as cleaning and oiling, laying, packing, screeding and finishing wet concrete.
    • 混凝土模具采用例如由橡胶制成的弹性侧挡板,当混凝土浇注时,通过张紧沿着挡板的长度延伸的钢丝来防止其偏转。 形成浇铸箱的侧面的挡板在具有一系列孔的固定端板之间延伸,以接收用于调节在箱中铸造的板的模块化宽度的张紧线。 在每个侧挡板中提供一系列孔,使得气动芯形成器可以穿过对准的孔插入,以便延伸穿过铸造箱。 完全或部分弹性的不同类型的接头成形器可以位于芯成形器周围,每个接合部件具有一系列槽以接收加强件或拉紧线或杆。 当充气时,气动芯架将接头成形器锁定就位。 开窗机可以由快门和联合成型机制成。 标准钢筋笼可以位于铸模箱中,模块化位置对应于挡板侧面的对齐孔。 模块化位置进行数字编码,以使铸造过程能够通过沿着支撑侧面挡板和端板的浇铸床的长度在轨道上行进的机器自动化。 机器在模块化位置停止,定位各个成型机和/或加固笼,并且还执行清洁和上油,铺设,包装,熨平和整理湿混凝土等自动功能。
    • 28. 发明授权
    • Table for concrete casting
    • 混凝土浇铸表
    • US3761046A
    • 1973-09-25
    • US3761046D
    • 1971-11-10
    • STELMO LTD
    • JESSOP K
    • B28B7/00B28B7/08E04G11/00
    • B28B7/0032B28B7/082
    • A table for casting concrete comprising two girders held in parallel spaced apart relationship by cross-members extending through apertures in the webs of the girders and attached thereto. Further members extend parallel to the girders and are supported on the cross-members such that the face of the further members remote from the cross-members lies in the same plane as the flanges of the girders. A concrete casting plate lies over and is attached to the flanges of the girders and faces of the further members. Means may be provided for connecting two such tables in an end-to-end manner with the girders aligned and the plates co-planar. Mounting means may be provided on the ends of the cross-members.
    • 一种用于铸造混凝土的工作台,包括两个横梁,平行间隔开的​​关系由横梁延伸穿过梁的腹板中的孔并连接到其上。 另外的构件平行于桁材延伸并且被支撑在横向构件上,使得远离横梁的其它构件的表面位于与桁材的凸缘相同的平面中。 混凝土浇铸板位于大梁的凸缘和其他构件的面上。 可以提供用于以端对端的方式连接两个这样的桌子的装置,其中所述的桁架对齐并且所述板是共面的。 安装装置可以设置在横梁的端部上。