会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 11. 发明申请
    • Scheduling mobile users based on cell load
    • 基于电池负载调度移动用户
    • US20070155395A1
    • 2007-07-05
    • US11321721
    • 2005-12-29
    • Nandu GopalakrishnanSudhir RamakrishnaAlexandro Salvarani
    • Nandu GopalakrishnanSudhir RamakrishnaAlexandro Salvarani
    • H04Q7/20
    • H04W28/18H04W72/1252
    • A scheduling strategy utilizes a total call load metric in place of a reverse signal strength indicator metric for managing reverse link resources. In a disclosed example, a load control module (40) measures the reverse signal strength indicator (62) and measures an active call load (64) using known techniques. A relationship between the reverse signal strength indicator, the active cell load, an other cell load component and a jammer component provides the ability to determine the other cell load component and the jammer component. Once the other cell load component has been determined, a total call load based upon the active cell load component and the other cell load component provides a useful metric for allocating reverse link resources between existing users and for determining whether to allow a new user, for example. In a disclosed example, the total call load at a time for scheduled transmission is estimated based upon recently measured values. The total call load provides an ability to determine an available reverse link resource, which provides an ability to determine how to schedule users desiring to transmit on the reverse link.
    • 调度策略利用总呼叫负载量度代替用于管理反向链路资源的反向信号强度指标度量。 在公开的示例中,负载控制模块(40)使用已知技术测量反向信号强度指示器(62)并测量活动呼叫负载(64)。 反向信号强度指示符,活动小区负载,其他小区负载组件和干扰组件之间的关系提供了确定其他小区负载分量和干扰组件的能力。 一旦确定了另一小区负载组件,基于活动小区负载组件和另一个小区负载组件的总呼叫负载提供用于在现有用户之间分配反向链路资源并且用于确定是否允许新用户的有用度量 例。 在公开的示例中,基于最近测量的值估计一次调度传输的总呼叫负载。 总呼叫负载提供了确定可用的反向链路资源的能力,其提供了确定如何调度期望在反向链路上发送的用户的能力。
    • 13. 发明授权
    • Fast method for adjusting downlink transmitted power
    • 调整下行传输功率的快速方法
    • US07155250B2
    • 2006-12-26
    • US10385345
    • 2003-03-10
    • Xiaohua ChenWalid E. NabhaneAlexandro Salvarani
    • Xiaohua ChenWalid E. NabhaneAlexandro Salvarani
    • H04Q7/20H04B7/00
    • H04W52/08
    • An algorithm calculates a correction value to be applied to a slot in an adjustment period for power correction. For each slot, the algorithm determines whether adding a correction value in a given slot would bring the actual accumulative adjustment value closer or farther from a total desired power correction value for the adjustment period. In one embodiment, the correction value is added to consecutive slots in the adjustment period to conduct the correction as fast as possible. The algorithm also checks the total amount of adjustment applied to the slots over a sliding adjustment window within the adjustment period to make sure that the total amount of adjustment applied to the slots in the adjustment window do not exceed a predetermined maximum threshold.
    • 一种算法在功率校正的调整周期中计算要应用于时隙的校正值。 对于每个时隙,该算法确定是否在给定时隙中添加校正值将使实际累积调整值更接近或远离调整周期的总期望功率校正值。 在一个实施例中,校正值被添加到调整周期中的连续时隙,以尽可能快地进行校正。 该算法还检查在调整周期内通过滑动调整窗口对插槽施加的总调整量,以确保施加到调整窗口中的插槽的总调整量不超过预定的最大阈值。
    • 15. 发明授权
    • Reverse link load control
    • 反向链路负载控制
    • US08219106B2
    • 2012-07-10
    • US11221329
    • 2005-09-07
    • Martin H. MeyersAlexandro SalvaraniCarl F. Weaver
    • Martin H. MeyersAlexandro SalvaraniCarl F. Weaver
    • H04W72/00H04W4/00H03C1/62
    • H04W72/0486H04W28/02H04W72/082
    • A reverse link load control strategy utilizes a total call load metric in place of a reverse signal strength indicator metric for managing reverse link resources. In a disclosed example, a load control module (40) measures the reverse signal strength indicator (62) and measures an active cell load (64) using known techniques. A relationship between the reverse signal strength indicator, the active cell load, an other cell load component and a jammer component provides the ability to determine the other cell load component and the jammer component. Once the other cell load component has been determined, a total call load based upon the active cell load component and the other cell load component provides a useful metric for allocating reverse link resources between existing users and for determining whether to allow a new user, for example.
    • 反向链路负载控制策略利用总呼叫负载度量来代替用于管理反向链路资源的反向信号强度指标度量。 在公开的示例中,负载控制模块(40)使用已知技术来测量反向信号强度指示器(62)并测量活动小区负载(64)。 反向信号强度指示符,活动小区负载,其他小区负载组件和干扰组件之间的关系提供了确定其他小区负载分量和干扰组件的能力。 一旦确定了另一小区负载组件,基于活动小区负载组件和另一个小区负载组件的总呼叫负载提供用于在现有用户之间分配反向链路资源并且用于确定是否允许新用户的有用度量 例。
    • 17. 发明授权
    • Parallel multiple measurement message handling for soft handoff in CDMA systems
    • CDMA系统中软切换的并行多重测量消息处理
    • US07245919B2
    • 2007-07-17
    • US10465215
    • 2003-06-19
    • Kin Nang LauAli Masoomzadeh-FardMartin H. MeyersAlexandro SalvaraniSusan Wu Sanders
    • Kin Nang LauAli Masoomzadeh-FardMartin H. MeyersAlexandro SalvaraniSusan Wu Sanders
    • H04Q7/20
    • H04W36/30H04W36/18
    • A method of processing, in parallel fashion, messages from a User Equipment (UE) in soft handoff with a plurality of base stations of a wireless communication system. Measurement Messages from the User Equipment are received and stored in a message buffer for a defined period of time. Later arriving messages replace previous messages during the defined period of time. When the defined period of time elapses, the latest stored message is processed in parallel fashion in a processing pipeline with other messages for the UE and other UEs. The latest message is processed by first converting it to soft handoff actions and inserting such actions into a processing pipeline. A conflict table is generated during the parallel processing of the soft handoff actions to avoid the processing of messages that conflict with each other. Conflicting messages are put into a pending state and remain in such state until they are canceled by subsequent messages or the conflict no longer exists.
    • 一种处理与无线通信系统的多个基站进行软切换的来自用户设备(UE)的消息的并行处理方法。 来自用户设备的测量消息被接收并存储在消息缓冲器中定义的时间段。 后来的消息将在定义的时间段内替换以前的消息。 当定义的时间段过去时,最后存储的消息在与用于UE和其他UE的其他消息的处理流水线中并行处理。 首先将最新消息转换为软切换动作,并将这些动作插入到处理流水线中。 在软切换动作的并行处理期间产生冲突表,以避免处理相互冲突的消息。 冲突的消息将处于挂起状态,并保持在这种状态,直到它们被后续消息取消或冲突不再存在。