    • Constructing method of cable bridge using free cantilever method
    • 使用免费CANTILEVER方法的电缆桥的构造方法
    • KR101184773B1
    • 2012-09-20
    • KR20120047342
    • 2012-05-04
    • FREYSSINET KOREA CO LTDHYUNDAI CONSTRUCTION CO LTD
    • KIM KWANG SOOLEE EUN CHULKIM SEUNG IKKIM JAE SEOK
    • E01D11/04E01D21/00
    • E01D21/00E01D11/04E01D19/16E01D21/10E01D2101/24
    • PURPOSE: A construction method of a cable-stayed bridge for reducing construction time by changing the installation order of a support cable using the temporary connection of segments is provided to reduce time required for constructing an upper structure of a cable-stayed bridge. CONSTITUTION: A construction method of a cable-stayed bridge for reducing construction time by changing the installation order of a support cable using the temporary connection of segments is as follows. A movable form installation device(200) is installed on a first segment(102) and installs a form a second segment(103) is installed on the front of the first segment. The second segment is manufactured by placing concrete in the form. The first and second segments are connected to each other using a temporary connection assembly. The movable form installation device is moved to the second segment before a support cable(300) is connected to the second segment and tensioned. The moved movable form installation device installs a form for a third segment is installed on the front of the second segment. The third segment is manufactured by placing concrete in the form.
    • 目的:提供一种斜拉桥的施工方法,用于通过使用段的临时连接改变支撑电缆的安装顺序来减少施工时间,以减少构建斜拉桥上部结构所需的时间。 构成:通过使用段的临时连接改变支撑电缆的安装顺序来减少施工时间的斜拉桥的施工方法如下。 可动形式安装装置(200)安装在第一部分(102)上并且安装形式,第二部分(103)安装在第一部分的前部。 第二段是通过将混凝土置于形式中制造的。 第一和第二段使用临时连接组件相互连接。 在支撑电缆(300)连接到第二段并被张紧之前,可动形式安装装置移动到第二段。 移动的活动式安装装置安装第三段的形式安装在第二段的前面。 第三段是通过将混凝土置于形式中制造的。