会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • 에너지 그리드에서의 열에너지 공급 관리 방법, 서버 및 시스템
    • 用于提供ENGGGID中的加热能量的方法,服务器和系统
    • KR101432203B1
    • 2014-08-27
    • KR1020130068103
    • 2013-06-14
    • 삼성물산 주식회사삼성물산 주식회사주식회사 대경에너텍
    • 현지숙정근수박형우한송수최해문
    • G06Q50/06G06Q50/10
    • G06Q50/06G06Q50/10
    • According to an embodiment of the present invention, a method for managing the supply of thermal energy is disclosed. The method includes receiving a first monitoring data on the amount of steam supplied from each of a plurality of small heat sources from first sensors arranged on a common pipe of an energy grid formed by connecting the small heat sources and a plurality of customers to the common pipe; receiving a second monitoring data on the amount of steam, supplied to each of the customers through the common pipe, from second sensors arranged on the common pipe of the energy grid; analyzing at least one of the first and second monitoring data, and transmitting a message corresponding to the analysis result to at least one among the small heat sources, the customers, and a plurality of control valves arranged on the common pipe.
    • 根据本发明的实施例,公开了一种用于管理热能供应的方法。 该方法包括从第一传感器接收从多个小型热源中的每一个提供的蒸汽量的第一监测数据,所述第一传感器布置在通过将小热源与多个客户连接到共同的共同的能量网的公共管道上 管; 从布置在能量网的公共管道上的第二传感器接收通过公共管道提供给每个客户的蒸汽量的第二监测数据; 分析第一和第二监测数据中的至少一个,并将与分析结果相对应的消息发送到布置在公共管道上的小型热源,客户和多个控制阀中的至少一个。
    • 2. 发明授权
    • 건물의 입주사별 전력 사용량 모니터링 기반의 전력 관리 장치 및 방법
    • 根据建筑公司监督电力使用情况管理电力的偏差和方法
    • KR101386747B1
    • 2014-04-17
    • KR1020130072871
    • 2013-06-25
    • 삼성물산 주식회사
    • 윤연주정근수이승민한송수최해문
    • H02P3/14H02P3/12
    • G01R21/06G01R19/003G01R21/133
    • A power management device based on the monitoring of power usage by a tenant company of a building according to an embodiment of the present invention comprises a detection unit which determines that each transformer installed on a building is overloaded and detects a tenant company connected to a transformer which is determined as being overloaded among tenant companies in the building based on a look up table; a measuring unit which measures the power usage of the detected tenant company and determines the power usage priority based on the measured value of the power usage; and a notification unit which selects high ranked N number of tenant companies (N is a natural number) having highest power usage based on the determined power usage priority and transmits a power saving notification to the selected tenant companies. [Reference numerals] (210) Determine that each transformer installed on a building is overloaded; (220) Detect a tenant compay connected to the transformer which is determined as being overloaded based on a look-up table; (230) Determine power usage priority by measuring power usage of the detected tenant company; (240) Select high ranked N number of tenant companies having highest power usage based on the power usage priority; (250) Transmit power saving notification to the selected tenant companies; (AA) Start; (BB) End
    • 根据本发明的实施例的基于对建筑物的租户公司的用电监控的电力管理装置包括:检测单元,其确定安装在建筑物上的每个变压器过载并且检测连接到变压器的租户公司 在建筑物的租户公司中,根据查找表确定为超载; 测量单元,其测量所检测到的租户公司的电力使用,并且基于所述电力使用的测量值来确定所述电力使用优先级; 以及通知单元,其基于所确定的电力使用优先级来选择具有最高功率使用的高排名的N个租户公司(N是自然数),并向所选择的租户公司发送节电通知。 (附图标记)(210)确定安装在建筑物上的每个变压器过载; (220)根据查找表检测与被确定为过载的变压器连接的承租人费用; (230)通过测量检测到的租户公司的用电量确定用电优先权; (240)根据用电优先级选择具有最高使用功率的租户公司排名第N位; (250)向选定的租户公司发送省电通知; (AA)开始; (BB)结束