会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • 캔틸레버형 지지거더를 이용한 철골조 역타설 시스템 및방법
    • 使用CANTILEVER型钢框架的地下下部结构的系统和方法
    • KR100856723B1
    • 2008-09-04
    • KR1020070030189
    • 2007-03-28
    • 박무용황기수최창식
    • 박무용황기수최창식정영기이병희
    • E02D29/045E04B1/19E04G11/50
    • E02D29/045E04B1/1903E04G11/50
    • A top down system and a top down method of a steel frame using a cantilever type steel frame are provided to reduce the usage and loss quantity of steel frames, to have a simple joining structure of members, to reduce the required materials, to simplify the work, and to improve constructability and economical efficiency. A top down system of a steel frame using a cantilever type steel frame, which is a form for constructing a slab of each basement and a structure for supporting a form and becomes a permanent structure after construction, comprises cantilever type support girders(121a) installed horizontally toward the direction of the short side of each H-shaped steel column(110), continuous steel beams(131a,131b) joined and supported to the end of the cantilever type support girder, and installed vertically toward the direction of the long side on the end of each cantilever type support girder, and a deck plate installed to be supported on the support girder and the steel beam and placed with slab concrete. A method of a steel frame using a cantilever type steel frame comprises the steps of: constructing an earth retaining wall along a boundary line of a building to be constructed, and installing a column for a frame on the location of each column of a building; constructing a floor slab for a first floor above the ground by installing support girders in four directions according to the height of a floor slab of the first floor above the ground, and a steel beam between a support girder and a support girder horizontally on the upper part of the column for each frame exposed after pit excavation; installing cantilever type support girders horizontally on right and left sides of a column at the height of a first floor under the ground of the column for each frame exposed after additional excavation; joining a steel beam to the end of each cantilever type support girder to be continued in the horizontal direction of the cantilever type support girder; constructing a floor slab for a first floor under the ground by installing a deck plate on the support girder and the steel beam and placing slab concrete; and constructing a slab for the whole floors under the ground by installing the cantilever type support girder, the steel beam and the deck plate, and placing slab concrete repeatedly after additional excavation.
    • 提供了一种使用悬臂式钢框架的钢框架的自顶向下系统和自顶向下的方法,以减少钢框架的使用和损耗量,具有简单的构件接合结构,以减少所需材料,从而简化 工作,提高建设性和经济效益。 使用悬臂式钢框架的钢框架的自顶向下系统,其是用于构造每个基底的板坯的形式和用于支撑结构并在构造之后成为永久结构的结构,包括悬臂式支撑梁(121a)安装 水平地朝向每个H形钢柱(110)的短边方向,连接并支撑在悬臂式支撑梁的端部的连续钢梁(131a,131b),并且垂直于长边方向安装 在每个悬臂式支撑梁的末端,以及安装在支撑梁和钢梁上的甲板板,并放置在板坯混凝土上。 一种使用悬臂式钢框架的钢框架的方法包括以下步骤:沿着建筑物的边界线建造一个挡土墙,并将一个框架柱安装在建筑物每一列的位置; 通过根据地面上第一层楼板的高度在四个方向上安装支撑梁,在地面上建造一层地板,水平地在上面的支撑梁和支撑梁之间的钢梁 挖坑后暴露的每个框架的一部分柱; 在附近开挖后暴露的每个框架的立柱底部一楼的高度处,在垂直柱的左侧和左侧水平安装悬臂式支撑梁; 将钢梁连接到悬臂式支撑梁的水平方向上延伸到每个悬臂式支撑梁的端部; 通过在支撑梁和钢梁上安装甲板板并安装板坯混凝土,在地面下建一层地板; 通过安装悬臂式支撑梁,钢梁和甲板板,并在额外开挖后重复放置板式混凝土,在地下整个地板上建造板坯。
    • 3. 发明公开
    • 마이크로파일 보강구조체와 이를 이용한 기초콘크리트 보강공법
    • 使用它的橄榄石混凝土的微结构加固结构和增强方法
    • KR1020160015099A
    • 2016-02-12
    • KR1020140097602
    • 2014-07-30
    • 황판용이병희황기수
    • 황판용이병희황기수김진원
    • E02D5/80E02D5/28E02D27/28
    • E02D5/80
    • 본발명은기초콘크리트침하시 기초콘크리트와마이크로파일이일체로작용하여기초콘크리트에작용하는하중을지지하며, 마이크로파일에의한펀칭전단을방지하고, 마이크로파일의지지력을증대할수 있는마이크로파일보강구조체와이를이용한기초콘크리트보강공법을제공하는것을목적으로한다. 상기와같은목적을달성하기위해본 발명은기초콘크리트에침하등이발생하는경우기초콘크리트의지지력을증대하기위하여기초콘크리트의침하부분상면에코아홀을형성하여지반까지천공하고기초콘크리트저면에서케이싱상면까지상기코아홀보다그 폭이확대된확장코아홀을형성하여마이크로파일보강구조체를설치하여구성되는것을기술적특징으로한다.
    • 本发明提供一种微桩加固结构,以及使用其的基础混凝土的加固方法。 当基础混凝土沉降时,微桩加固结构支撑施加到基础混凝土上的载荷作为基础混凝土和微桩整体工作。 微桩加固结构防止了微桩的冲剪,改善了微桩的支撑力。 为了达到本发明的目的,微桩加固结构在基础混凝土的下沉部分的上表面上具有一个核心孔,以在基础混凝土消退时改善基础混凝土的支撑力。 所述微桩加固结构将所述核心孔钻到地面并形成扩展的芯孔,其中其宽度比所述基础混凝土的底部到所述壳体的上表面的所述芯孔更宽,使得所述微桩加固结构被安装 。
    • 4. 发明公开
    • 지하 구조물의 시공방법
    • 一种地下结构的滑坡和外墙的构造方法
    • KR1020140126883A
    • 2014-11-03
    • KR1020130045099
    • 2013-04-24
    • 황기수이병희
    • 황기수이병희
    • E02D29/045E02D17/04E02D5/28E02D29/02
    • E02D29/045E02D5/28E02D17/04E02D29/0275E02D2300/002
    • 본 발명은 지하 흙막이 벽체(10)의 토압을 지하 구조물인 층간 슬래브가 직접 지지하며, 상기 층간 슬래브의 외벽에 해당되는 부분에 개구부가 형성되어 외벽용 철근의 배근과 콘크리트 타설이 용이하고, 상기 층간 슬래브를 형성하기 위해 설치되는 평 데크 플레이트는 해체되어 재활용할 수 있는 지하 구조물의 슬래브와 외벽 시공방법을 제공하는 것을 목적으로 한다.
      상기 목적을 달성하기 위해 본 발명의 지하 구조물 슬래브와 외벽 시공방법은 흙막이 벽체(10)에 소정 간격으로 매입된 강합성 파일의 H형강(11) 플랜지에 슬래브 하중을 지지하기 위한 받침 브라켓(20)이 소정 간격으로 용접접합되어 설치되는 단계;
      상기 흙막이 벽체(10) 표면으로부터 소정 거리까지 상기 받침 브라켓(20)의 상면에는 라스(22)가 설치되며, 상기 라스(22)의 일측 단부에는 받침각재(23)가 상기 받침 브라켓(20)의 상면에서 용접접합되고, 상기 흙막이 벽체(10)와 평행한 방향으로 연속되게 설치되는 단계;
      상기 받침각재(23)의 상면에는 평 데크 플레이트(60)가 설치되며, 상기 평 데크 플레이트(60)의 상면에는 소정 간격으로 트러스 철근(50)이 설치되고, 상기 평 데크 플레이트(60)와 트러스 철근(50)은 고정지지수단(70)에 의해 결합되어 설치되는 단계;
      상기 트러스 철근(50) 사이에 스틸 박스형 구조체(31)가 소정 간격으로 설치되며, 상기 스틸 박스형 구조체(31)는 상기 트러스 철근(50)에 용접접합되어 고정되는 단계; 상기 평 데크 플레이트(60)의 상부에 콘크리트가 타설되어 층간 슬래브(S2)가 형성되는 단계;
      상기 평 데크 플레이트(60)와 고정지지수단(70)이 해체된 후, 상기 층간 슬래브(S2)에는 상기 스틸 박스형 구조체(31)에 의해 콘크리트를 타설할 수 있는 개구부(32)가 형성되는 단계;
      상기 층간 슬래브(S2)에 형성된 상기 개구부(32)에는 소정 간격으로 외벽용 철근(41)이 배근되고 콘크리트가 타설되어 지하 구조물의 외벽(80)이 형성되는 단계;를 포함하는 것을 특징으로 한다.
    • 在中间板坯的外壁上形成有构造成直接支撑地下土挡土墙(10)和开口部的土压的地下结构的中间板,有助于将外墙的钢筋放置, 混凝土加固。 安装形成中间板的平板甲板可以拆卸和回收利用。 为了有效地支撑要传递到地下挡土墙的土压力,本发明的地下结构板坯和外壁的施工方法被构造成去除嵌入的板坯,以设置在土壤挡土墙和 中间板,使土壤挡土墙直接支撑。
    • 5. 发明授权
    • 프리캐스트 콘크리트 거더와 강재 빔의 접합부 구조
    • 预制混凝土钢管和钢梁的接头结构
    • KR101426509B1
    • 2014-08-05
    • KR1020130015057
    • 2013-02-12
    • 황기수이병희
    • 황기수이병희
    • E04B1/30E04B1/58
    • The purpose of the present invention is to provide a joint structure between a precast concrete girder and a steel beam, wherein the precast concrete girder has a joint portion of which both sides have gusset plates to connect the steel beam to both sides of the central portion of the precast concrete girder, thereby lightening a building by installing the steel beam between the precast concrete girders. According to the present invention to accomplish the purpose, a joint structure between a precast concrete girder (2) and a steel beam (4) allows the steel beams (4) to be installed on both sides of the central portion of the precast concrete girder (2). Multiple stud bolts (7) are fixed to be embedded in both sides of the precast concrete girder (2). Gusset plates (12) are installed on both of the sides of the precast concrete girder (2) by being joined to be welded on one ends of the stud bolts (7). The webs (18) of the gusset plates (12) installed on both of the sides of the precast concrete girder (2) and the webs of the steel beam (4) are joined to each other by bolts. The lower flanges (13) of the gusset plates (12) and the lower flanges of the steel beam (4) are joined to each other by bolts. Multiple steel rods (15) separated from each other at predetermined distances are joined to be welded on the upper flanges of two of the adjacent steel beams (4). Sleeve joints (16) are coupled between the steel rods (15), so the steel rods are integrally connected.
    • 本发明的目的是提供一种预制混凝土梁与钢梁之间的接合结构,其中预制混凝土梁的接合部分的两侧具有角撑板,以将钢梁连接到中心部分的两侧 的预制混凝土梁,从而通过将钢梁安装在预制混凝土桁架之间来减轻建筑物的损坏。 根据本发明,为了达到这个目的,预制混凝土梁(2)和钢梁(4)之间的接合结构允许钢梁(4)安装在预制混凝土梁的中心部分的两侧 (2)。 多个双头螺栓(7)固定在预制混凝土梁(2)的两侧。 角撑板(12)通过接合在预制混凝土梁(2)的两侧安装在双头螺栓(7)的一端上。 安装在预制混凝土梁(2)的两侧的钢板(12)的腹板(18)和钢梁(4)的腹板通过螺栓彼此接合。 角撑板(12)的下凸缘(13)和钢梁(4)的下凸缘通过螺栓相互连接。 以预定距离彼此分离的多个钢棒(15)被接合以焊接在两个相邻钢梁(4)的上凸缘上。 套管接头(16)联接在钢杆(15)之间,因此钢棒是一体连接的。
    • 6. 发明授权
    • 층고 절감을 위한 강합성 보, 변단면 하이브리드 보 및 변단면 하이브리드 강합성 보
    • 钢复合梁,可变截面混合梁和可变段混合复合梁,用于降低地板高度
    • KR101473216B1
    • 2014-12-16
    • KR1020130057353
    • 2013-05-21
    • 황기수이병희
    • 황기수이병희
    • E04C3/293
    • 본발명은강재보의상,하부판을두 개의웨브판으로결합하여보의중앙부와단부의인장, 압축단면적을증대하며, 보의웨브부분을보강하고, 보의높이를절감하며, 보의단부는강재와콘크리트가결합하여효율적으로지지하는층고절감을위한강합성보, 변단면하이브리드보 및변단면하이브리드강합성보를제공하는것을목적으로한다. 상기와같은목적을달성하기위해제공되는본 발명의강재기둥(100) 사이에강접합되는강합성보(30)는하부판(32)과보의단부부모멘트구간내에원형개구부(36)가형성된상부판(31)이소정간격으로상,하로배치되며, 상기상,하부판(31, 32) 사이에는좌측웨브판(33)과우측웨브판(34)이소정간격으로서로대향되게배치되어상기상,하부판(31, 32)과용접접합됨으로써자형상으로형성되고, 상기상,하부판(31, 32) 사이에는보의단부부모멘트구간내에다이아프램(35)이설치되되, 상기원형개구부(36)로부터보 중앙방향으로소정거리이격되어설치되며, 상기다이아프램(35)은상기상,하부판(31, 32)과용접접합되고, 상기원형개구부(36)로콘크리트(37)가충전되어구성되는것을특징으로한다. 그리고본 발명의강재기둥(100) 사이에강접합되는변단면하이브리드보(40)는상기보의단부부모멘트구간에는상부판(41)과하부판(42)이소정간격으로상,하로배치되며, 상기상,하부판(41, 42) 사이에는좌측웨브판(43)과우측웨브판(44)이소정간격으로서로대향되게배치되어상기상,하부판(41, 42)과용접접합됨으로써자형상으로형성되고, 상기상,하부판과좌,우측웨브판의일측단부에는수직판(45)이용접접합되어이루어지는박스형강재보(47)와, 상기박스형강재보(47) 사이에설치되는 H형강보(46)는상기수직판(45)과용접접합되며, 상기 H형강보(46)의단면은상기박스형강재보(47)의단면보다작게형성되어구성되는것을특징으로한다.
    • 7. 发明公开
    • 조립식 보 거푸집.
    • 组装型梁模具
    • KR1020140090816A
    • 2014-07-18
    • KR1020130002882
    • 2013-01-10
    • 황기수이병희
    • 황기수이병희김진원배병호
    • E04C3/293
    • The present invention relates to a self-assembly beam cast capable of being easily manufactured by being a self-assembly style while having reinforced strength of a side plate to support a side pressure due to the plastering of concrete of a steel composite beam or a reinforced concrete beam. Moreover, the self-assembly beam cast according to the present invention has a horizontal bead of a side plate and a vertical bead of the floor plate which are coupled in a self-assembly style to enhance coupling forces of the floor plate and side plate, and to increasing the strength of joint portions on the floor plate and side plate while enhancing the constructability of the cast manufacturing. Moreover, since the vertical bead of the floor plate of the cast is formed at an interval which enables the sole installation of a steel beam to make the steel beam installed on the top surface of the floor plate, the length of the steel composite beam can be reduced while enabling the installation of a deck plate on an upper side plate of the cast. Thereby, through the upper side plate of the cast, the selfsame weight of a slab can be evenly delivered to the beam.
    • 本发明涉及一种自组装梁铸造,其能够通过自组装式容易地制造,同时具有侧板的增强强度,以支撑由于钢复合梁的混凝土的抹灰或增强的钢筋 混凝土梁。 此外,根据本发明的自组装梁具有侧板的水平边缘和底板的垂直边缘,其以自组装的方式联接以增强地板板和侧板的联接力, 并且在提高铸造制造的构造性的同时提高地板板和侧板上的接合部的强度。 此外,由于铸件的地板的垂直胎圈以能够单独安装钢梁以使钢梁安装在地板的顶面上的间隔形成,所以钢组合梁的长度可以 同时可以在铸件的上侧板上安装甲板板。 因此,通过铸件的上侧板,可以将板坯的均匀重量均匀地输送到梁上。
    • 10. 发明公开
    • 마이크로 파일을 이용한 기초 구조물의 보강공법
    • 基础结构的加固方法使用微型桩
    • KR1020140017381A
    • 2014-02-11
    • KR1020120084428
    • 2012-08-01
    • 황판용이병희황기수
    • 황판용이병희황기수
    • E02D27/28E02D27/08E02D5/80
    • E02D27/28E02D5/80E02D27/08E02D2250/003
    • The purpose of the present invention is to provide a method for reinforcing a foundation structure using a micro pile, wherein the method is to simplify the reinforced structure of foundation concrete in order to easily reinforce the foundation structure; to form a drilled hole in order to minimize a cross-sectional loss; to stably support the bottom of the foundation concrete as much as a predetermined width; to prevent the generation of pile punching shear due to the installation of the micro pile; and to allow the foundation concrete to integrally behave with reinforcing concrete when a displacement is generated in the ground. To accomplish the purpose, the method comprises: a step of forming the drilled hole (12b) with a small diameter from the upper surface of the reinforced part of the foundation concrete (10) to the lower surface of the reinforced part of the foundation concrete (10) in order to install the micro pile; a step of forming a drilled hole (12a) with a large diameter and a larger width than the width of the drilled hole (12b) at the lower side of the drilled hole (12b) and in the ground (24) as much as a predetermined depth in order to install a concrete bulb supporting the bottom of the foundation concrete (10) as much as the predetermined width; a step of installing a hollow circular casing (23) at the bottom of the drilled hole (12a) and in the ground as much as a predetermined depth in order to install the micro pile (22); a step of sequentially fastening a lock nut (21), a base plate (20), and a lock nut (21) to the male-threaded outer circumferential surface of the micro pile (22), and installing the micro pile (22) in the casing (23); and a step of filling the reinforcing concrete in the drilled holes.
    • 本发明的目的是提供一种使用微桩加强基础结构的方法,其中该方法是简化基础混凝土的加强结构,以便容易地加强基础结构; 以形成钻孔,以最小化横截面损失; 稳定地支撑基础混凝土的底部尽可能多的预定宽度; 防止由于安装微桩而产生桩冲剪; 并允许地基混凝土在地面产生位移时与加固混凝土一体地表现。 为了实现该目的,该方法包括:从基础混凝土(10)的增强部分的上表面到基础混凝土的加强部分的下表面形成具有小直径的钻孔(12b)的步骤 (10)安装微桩; 在钻孔(12b)的下侧和地面(24)中形成具有比钻孔(12b)的宽度大的直径和宽度大的钻孔(12a)的步骤, 预定深度,以便安装一个支撑基础混凝土(10)底部的混凝土灯泡达预定宽度; 为了安装微型桩(22),在钻孔(12a)的底部和地面上安装中空圆形壳体(23)至多达预定深度的步骤; 将锁紧螺母(21),基板(20)和锁定螺母(21)顺序地紧固到微型桩(22)的外螺纹外周面的步骤,并安装微型桩(22) 在壳体(23)中; 以及将加强混凝土填充在钻孔中的步骤。