    • 1. 发明公开
    • 발전 설비
    • 发电设备
    • KR1020100007770A
    • 2010-01-22
    • KR1020090062777
    • 2009-07-10
    • 가부시키가이샤 고베 세이코쇼
    • 마쯔이다까요시마쯔꾸마마사끼나까니시가이
    • F01K23/08F01K25/08F01D17/10H02P9/04
    • PURPOSE: Power generation equipment is provided to prevent the waste about the power generation by preferentially making the redundancy steam vapor flowed in a generator side before a pressure control valve. CONSTITUTION: Power generation equipment comprises a steam process line(4), a redundant steam line(5), a pressure control valve(6), a generator(9), a pressure sensor(7), and a controller(10). The steam process line supplies the steam generated in the steam source for the steam use process. The redundant steam line is branched from the steam process line. The redundant steam line releases the redundant steam to the atmosphere and supplies the redundant steam to a steam condenser. The pressure control valve is installed in the redundant steam line. The generator is installed in the redundant steam line to be parallel to the pressure control valve. The pressure sensor is installed in the first side of the pressure control valve. The controller controls the opening degree of the pressure control valve so that the sensed pressure is more than the preset pressure.
    • 目的:提供发电设备,通过优先使冗余蒸气蒸汽在压力控制阀之前在发电机侧流动,以防止发电浪费。 构成:发电设备包括蒸汽生产线(4),冗余蒸汽管线(5),压力控制阀(6),发电机(9),压力传感器(7)和控制器(10)。 蒸汽生产线为蒸汽使用过程中产生的蒸汽提供蒸汽。 冗余蒸汽管线从蒸汽生产线分支。 冗余蒸汽管线将冗余蒸汽排放到大气中,并将冗余蒸汽提供给蒸汽冷凝器。 压力控制阀安装在冗余蒸汽管路中。 发电机安装在冗余蒸汽管路中以平行于压力控制阀。 压力传感器安装在压力控制阀的第一侧。 控制器控制压力控制阀的开度,使得感测到的压力大于预设压力。
    • 4. 发明授权
    • 발전 설비
    • 发电设备
    • KR101095101B1
    • 2011-12-16
    • KR1020090062777
    • 2009-07-10
    • 가부시키가이샤 고베 세이코쇼
    • 마쯔이다까요시마쯔꾸마마사끼나까니시가이
    • F01K23/08F01K25/08F01D17/10H02P9/04
    • 보일러 등에서 발생한 증기를 소정의 프로세스를 위해 공급하는 증기 프로세스 라인과, 증기 프로세스 라인에 공급되지 않은 잉여 증기를 송기하는 잉여 증기 라인을 갖고, 잉여 증기 라인에 발전 장치가 개재 설치된 프로세스 증기 이용 설비에 있어서, 증기 프로세스 라인에 공급되는 증기량에 의해 변화하는 잉여 증기의 양에 따른 발전을 할 수 있는 발전 설비를 제공한다. 이 발전 설비는, 폐열 보일러 등의 증기 공급원에서 발생하는 증기를 소정의 프로세스를 위해 공급하는 증기 프로세스 라인과, 증기 프로세스 라인으로부터 분기되고, 잉여 증기를 대기 방출 또는 복수기에 공급하는 잉여 증기 라인과, 잉여 증기 라인에 병렬로 개재 설치된 압력 조정 밸브(6)와 발전 장치와, 압력 조정 밸브의 1차측에 설치된 압력 검출기와, 압력 검출기가 검출한 압력이 설정 압력값이 되도록 압력 조정 밸브의 개방도를 제어하는 제어 수단을 구비한다.
      발전 설비, 압력 조정 밸브, 압력 검출기, 제어 장치, 발전 장치
    • 5. 发明公开
    • 발전 장치
    • 发电机
    • KR1020120004362A
    • 2012-01-12
    • KR1020110124825
    • 2011-11-28
    • 가부시키가이샤 고베 세이코쇼
    • 마쯔꾸마마사끼마쯔이다까요시우에하라가쯔히로와끼따다까유끼
    • F02C9/28F02C6/00H02P9/00
    • PURPOSE: A power generator is provided to facilitate maintenance by preventing excessive increase of driving torque. CONSTITUTION: A power generator(20) comprises first and second pressure sensors(52,56), a flow regulating valve(44), and a controller(28). The flow regulating valve controls pressure supplied to a steam turbine(22). Detection value of a steam supply pressure by the first pressure sensor and steam exhaust pressure by the second pressure sensor are inputted to the controller. The controller calculates driving torque of the steam turbine based on detected values and a pre-set specification value of the steam turbine. The controller controls the flow regulating valve in order that the driving torque doesn't exceed pre-set maximum load torque.
    • 目的:提供发电机,以便通过防止驱动转矩的过度增加来方便维护。 构成:发电机(20)包括第一和第二压力传感器(52,56),流量调节阀(44)和控制器(28)。 流量调节阀控制提供给蒸汽轮机(22)的压力。 通过第一压力传感器的蒸汽供给压力的检测值和第二压力传感器的蒸汽排出压力被输入到控制器。 控制器基于检测值和蒸汽轮机的预设规格值来计算蒸汽涡轮机的驱动转矩。 控制器控制流量调节阀,以便驱动转矩不超过预设的最大负载转矩。
    • 6. 发明公开
    • 증기 원동기
    • 汽轮机
    • KR1020110124148A
    • 2011-11-16
    • KR1020110043266
    • 2011-05-09
    • 가부시키가이샤 고베 세이코쇼
    • 구와바라히데아끼마쯔이다까요시마쯔꾸마마사끼
    • F01D21/00F01D17/20F01D17/24F01D15/10
    • F01D21/00F01D15/10F01D17/08F01K13/02F05D2220/31
    • PURPOSE: A steam turbine is provided to prevent over-speed rotation of a turbine by returning steam from an exhaust side to an intake side when the pressure of the intake side is lowered due to the operation of an emergency shutoff valve. CONSTITUTION: A steam turbine comprises a positive displacement turbine(2) which is rotated by steam, an intake duct(10) which is connected to the positive displacement turbine, an exhaust duct(11) which is connected to the positive displacement turbine, an emergency shutoff valve(4) which is installed in the intake duct, an exhaust gas return duct(12) which is branched from the intake pipe between the emergency shutoff valve and the positive displacement turbine, and an auto valve(5) which is installed in the exhaust gas return duct and opened to return steam into the intake duct when the pressure of the intake side is lowered due to the operation of the emergency shutoff valve.
    • 目的:提供一种汽轮机,用于当进气侧的压力由于紧急切断阀的操作而降低时,通过将蒸气从排气侧返回到进气侧来防止涡轮机的超速旋转。 构成:蒸汽轮机包括通过蒸汽旋转的正排量涡轮机(2),连接到正排量涡轮机的进气管道(10),连接到正排量涡轮机的排气管道(11), 安装在进气管道中的紧急截止阀(4),从紧急切断阀和正排量涡轮机之间的进气管分支的废气返回管道(12)和安装在紧急切断阀 在排气返回管道中,当进气侧的压力由于紧急截止阀的操作而降低时,打开以将蒸汽返回到进气管道中。