会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • 콘크리트파일 머리부와 콘크리트 바닥슬래브의보강결합구조 및 그 보강결합방법
    • 结构和方法,通过连接混凝土桩头和混凝土地板坯料和耐火材料,增加抗地震抗力和承受强度的外力
    • KR1020040095391A
    • 2004-11-15
    • KR1020030026671
    • 2003-04-28
    • (주)피에스테크이정재
    • 황문삼김동준박종진장현정신희건김성진서상건양승홍이정재김복희
    • E02D5/60
    • PURPOSE: A reinforcing-coupling structure of a concrete pile head and a concrete floor slab is provided to heighten the binding strength between a pile and a foundation using a reinforcing bar and a fastener, to prevent the shear transformation of a pile using a fixing bar and a coupler, to have stable bearing strength against external force using many reinforcing bars, fastener and filled concrete, to shorten a period of construction by forming filled concrete in the appointed depth using an isolation plate without filling up a pile with soils, and to extend the life of a structure by retarding the corrosion of various reinforcing bars by intercepting the underground water completely using an isolation plate. CONSTITUTION: The reinforcing-coupling structure of a concrete pile head and a concrete floor slab comprises the steps of welding studs(3,3') to each steel wire(2,2') exposed to a cutting plane of a concrete pile(1), then screwing couplers(4,4'), coupling reinforcing bars(5,5') to the couplers(4,4'), inserting a fastener(10) composed of many connecting bars(12,12') which are erected vertically on an isolation plate(11) by a fixing coil to the upper inside of the concrete pile(1), placing fixing bars(13,13') crossing a fixing coil of the fastener(10) on the upper side of the concrete pile(1), fixing the fastener(10) on the front of the concrete pile(1) and placing a concrete floor slab.
    • 目的:提供混凝土桩头和混凝土楼板的加强联结结构,以提高使用钢筋和紧固件的桩和基础之间的捆绑强度,以防止使用固定杆的桩的剪切变形 和耦合器,使用许多钢筋,紧固件和填充的混凝土,具有抵抗外力的稳定的轴承强度,通过使用隔离板在填充的混凝土中填充混凝土来缩短施工期,而不用土壤填充桩,并且 通过使用隔离板完全拦截地下水来延缓各种钢筋的腐蚀来延长结构的使用寿命。 构成:混凝土桩头和混凝土楼板的加强结合结构包括:将暴露于混凝土桩切割平面的每个钢丝(2,2')的螺柱(3,3')焊接在一起(1) ),然后旋转耦合器(4,4'),将耦合器(5,5')耦合到耦合器(4,4'),插入由许多连接杆(12,12')组成的紧固件(10) 在隔离板(11)上通过固定线圈垂直竖立到混凝土桩(1)的上部内部,将固定杆(13,13')与紧固件(10)的固定线圈交叉在上侧 混凝土桩(1),将紧固件(10)固定在混凝土桩(1)的前部,并放置一个混凝土楼板。
    • 6. 发明公开
    • 사각강관 버팀보의 단부 고정장치
    • 装置控制
    • KR1020110096107A
    • 2011-08-29
    • KR1020110070477
    • 2011-07-15
    • (주)피에스테크
    • 황문삼최인식
    • E02D17/08E02D17/04E04G25/02E02D5/54
    • E02D17/083E02D5/54E02D17/04E02D2200/165E04G25/02
    • PURPOSE: An apparatus for fixing the end of a steel pipe strut is provided to extend the service life of the apparatus by remarkably improving physical strength. CONSTITUTION: An apparatus(100) for fixing the end of a steel pipe strut comprises a steel pipe insertion unit(110), a coupling plate(130), a reinforcing member(140), and a support plate(120). The end of a steel pipe strut is inserted into one side of the steel pipe insertion unit. The coupling plate is coupled to a walling or a jack support. The reinforcing member is formed between the steel pipe insertion unit and the coupling plate. The support plate is formed in the other side of the steel pipe insertion unit and supports the reinforcing member.
    • 目的:提供一种用于固定钢管支柱末端的装置,通过显着提高体力来延长装置的使用寿命。 构成:用于固定钢管支柱的端部的装置(100)包括钢管插入单元(110),联接板(130),加强构件(140)和支撑板(120)。 钢管支柱的端部插入钢管插入单元的一侧。 联接板联接到墙壁或千斤顶支架。 加强构件形成在钢管插入单元和联接板之间。 支撑板形成在钢管插入单元的另一侧,并且支撑加强构件。
    • 7. 发明公开
    • 가설 흙막이 토류벽의 시공 방법
    • 用于构造临时保护壁的保持壁的方法,用于通过形成液体吸收树脂的涂层来轻松地从一个孔中分离一层,其被改变为在混凝土固化步骤中吸收水的凝胶
    • KR1020050024637A
    • 2005-03-11
    • KR1020030060701
    • 2003-09-01
    • (주)피에스테크
    • 황문삼
    • E02D5/20
    • PURPOSE: A method for constructing a retaining wall of a temporary protection wall is provided to easily draw out a pile from a bore, to re-use the pile, and to prevent excavation failure in reconstruction by absorbing the water by a coating layer of liquid absorptive resin and changing the coating layer into gel. CONSTITUTION: A method for constructing a retaining wall of a temporary protection wall is composed of steps for boring the ground; forming a coating layer(2) of liquid absorptive resin on the outer surface of a pile(10) by spraying or coating the liquid absorptive resin over the upper side of the pile; inserting the pile into the bore; pouring concrete into the bore; taking out the pile from the bore after constructing a structure and curing the concrete; and pouring and curing cement milk grouting in the bore after drawing out the pile.
    • 目的:提供一种临时保护墙的挡土墙构造方法,可轻易地从孔中抽出桩,重新使用桩,并通过液体涂层吸收水来防止重建中的挖掘失效 吸收树脂,并将涂层改为凝胶。 构成:建筑临时保护墙挡土墙的方法由镗地面的步骤组成; 通过在所述桩的上侧喷涂或涂覆所述液体吸收性树脂,在桩(10)的外表面上形成液体吸收树脂的涂层(2) 将桩插入孔中; 将混凝土浇注入孔中; 在构造结构并固化混凝土后,从孔中取出桩; 在抽出桩后,将水泥浆灌浆和灌浆固化在孔中。
    • 8. 发明公开
    • 프리스트레스를 이용한 가설 흙막이 공법 및 그 파일
    • 临时使用方法和桩
    • KR1020040051182A
    • 2004-06-18
    • KR1020020079059
    • 2002-12-12
    • (주)피에스테크황문삼
    • 황문삼
    • E02D17/04
    • PURPOSE: A temporary sheeting method and a pile using prestress are provided to heighten structural stability and waterproofing effect, to improve constructability and economical efficiency and to reduce a term of works. CONSTITUTION: The H-pile(20) is composed of a flange joint(1) and both flanges(2,2'). Wherein many prestressed generators(10) are installed on both sides of an intersection between the flange joint(1) and one of the flanges(2,2'), and formed by fixing both ends of cables(12,12') to anchor fixing plates(11,11') and coupling angles(15) to the anchor fixing plates(11,11') and the cables(12,12'), and the anchor fixing plates(11,11') and the cables(12,12') are formed by interposing wedge anchors fixed to the cables(12,12') to the anchor fixing plates(11,11') provided with many wedge holes.
    • 目的:提供临时压片方法和使用预应力的桩,以提高结构稳定性和防水效果,提高施工能力和经济效益,缩短工期。 构成:H型桩(20)由法兰接头(1)和两个法兰(2,2')组成。 其中许多预应力发电机(10)安装在法兰接头(1)和凸缘(2,2')中的一个之间的交叉点的两侧,并且通过将电缆(12,12')的两端固定到锚 固定板(11,11')和联接角(15)到锚定固定板(11,11')和电缆(12,12')以及锚定固定板(11,11')和电缆 12,12')通过将固定到电缆(12,12')上的楔形锚固件插入到具有许多楔形孔的锚定固定板(11,11')上而形成。