会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明公开
    • 강관 파일 머리부와 콘크리트 바닥슬래브의 보강결합구조
    • 钢管桩头和混凝土地板的加固结合结构可以通过紧固件增加桩和基础之间的结合强度,并具有抗外力等作为弯曲力和剪切强度的稳定的承载强度。 使用紧固件和填充混凝土
    • KR1020040095392A
    • 2004-11-15
    • KR1020030026672
    • 2003-04-28
    • (주)피에스테크
    • 황문삼김동준박종진장현정신희건김성진서상건양승홍김복희
    • E02D5/28
    • PURPOSE: A reinforcing-coupling structure of a steel pipe pile head and a concrete floor slab is provided to improve the binding strength of a pile and a foundation by a fastener having a connecting bar, to prevent the slide of a pile by a fixing bar and to have the stable bearing strength against external force by a fastener and the filled concrete. CONSTITUTION: The reinforcing-coupling structure of a steel pipe pile head and a concrete floor slab comprises the steps of coupling a fastener(10) having many connecting bars(14,14') on the upper end of a steel pipe pile(1) and coupling a steel pipe pile(1) and a concrete floor slab. The steel pipe pile(1) is provided with many fitting holes(2,2'), and the fastener(10) comprises the steps of erecting many vertical fixing bars(12,12') on the upper side of an isolation plate(11), erecting many connecting bars(14,14') to the inside of a fixing coil(13) radially, coupling the end of the vertical fixing bars(12,12') and the fixing coil(13), and inserting additional fixing bars(3,3') into the fitting holes(2,2') of the steel pipe pile(1), then placing the fixing coil(13) of the fastener(10) inserted into the front of the steel pipe pile(1) to couple the concrete floor slab, the steel pipe pile(1) and the fastener(10) firmly.
    • 目的:提供钢管桩头和混凝土楼板的加强结合结构,通过具有连接杆的紧固件来提高桩和地基的结合强度,以防止桩的固定杆滑动 并且通过紧固件和填充的混凝土具有抵抗外力的稳定的轴承强度。 构成:钢管桩头和混凝土楼板的加强结合结构包括以下步骤:在钢管桩(1)的上端连接具有许多连接杆(14,14')的紧固件(10) 并连接钢管桩(1)和混凝土楼板。 钢管桩(1)设有许多装配孔(2,2'),紧固件(10)包括在隔离板的上侧竖立许多垂直固定杆(12,12')的步骤 将许多连接杆(14,14')径向地竖立到固定线圈(13)的内部,将垂直固定杆(12,12')的端部和固定线圈(13)联接在一起,并插入附加 将固定杆(3,3')插入钢管桩(1)的装配孔(2,2')中,然后将紧固件(10)的固定线圈(13)放入钢管桩的前部 (1)牢固地连接混凝土楼板,钢管桩(1)和紧固件(10)。
    • 8. 发明公开
    • 콘크리트파일 머리부와 콘크리트 바닥슬래브의보강결합구조 및 그 보강결합방법
    • 结构和方法,通过连接混凝土桩头和混凝土地板坯料和耐火材料,增加抗地震抗力和承受强度的外力
    • KR1020040095391A
    • 2004-11-15
    • KR1020030026671
    • 2003-04-28
    • (주)피에스테크이정재
    • 황문삼김동준박종진장현정신희건김성진서상건양승홍이정재김복희
    • E02D5/60
    • PURPOSE: A reinforcing-coupling structure of a concrete pile head and a concrete floor slab is provided to heighten the binding strength between a pile and a foundation using a reinforcing bar and a fastener, to prevent the shear transformation of a pile using a fixing bar and a coupler, to have stable bearing strength against external force using many reinforcing bars, fastener and filled concrete, to shorten a period of construction by forming filled concrete in the appointed depth using an isolation plate without filling up a pile with soils, and to extend the life of a structure by retarding the corrosion of various reinforcing bars by intercepting the underground water completely using an isolation plate. CONSTITUTION: The reinforcing-coupling structure of a concrete pile head and a concrete floor slab comprises the steps of welding studs(3,3') to each steel wire(2,2') exposed to a cutting plane of a concrete pile(1), then screwing couplers(4,4'), coupling reinforcing bars(5,5') to the couplers(4,4'), inserting a fastener(10) composed of many connecting bars(12,12') which are erected vertically on an isolation plate(11) by a fixing coil to the upper inside of the concrete pile(1), placing fixing bars(13,13') crossing a fixing coil of the fastener(10) on the upper side of the concrete pile(1), fixing the fastener(10) on the front of the concrete pile(1) and placing a concrete floor slab.
    • 目的:提供混凝土桩头和混凝土楼板的加强联结结构,以提高使用钢筋和紧固件的桩和基础之间的捆绑强度,以防止使用固定杆的桩的剪切变形 和耦合器,使用许多钢筋,紧固件和填充的混凝土,具有抵抗外力的稳定的轴承强度,通过使用隔离板在填充的混凝土中填充混凝土来缩短施工期,而不用土壤填充桩,并且 通过使用隔离板完全拦截地下水来延缓各种钢筋的腐蚀来延长结构的使用寿命。 构成:混凝土桩头和混凝土楼板的加强结合结构包括:将暴露于混凝土桩切割平面的每个钢丝(2,2')的螺柱(3,3')焊接在一起(1) ),然后旋转耦合器(4,4'),将耦合器(5,5')耦合到耦合器(4,4'),插入由许多连接杆(12,12')组成的紧固件(10) 在隔离板(11)上通过固定线圈垂直竖立到混凝土桩(1)的上部内部,将固定杆(13,13')与紧固件(10)的固定线圈交叉在上侧 混凝土桩(1),将紧固件(10)固定在混凝土桩(1)的前部,并放置一个混凝土楼板。
    • 9. 实用新型
    • 토류벽 공법에 적용되는 에이치파일의 연속 결합구조
    • H文件连续接合结构应用于土墙法
    • KR200356918Y1
    • 2004-07-21
    • KR2020040009342
    • 2004-04-06
    • (주)피에스테크
    • 황문삼서상건
    • E02D5/08
    • E02D17/04E02D5/08E02D17/08E02D2600/20
    • 본 고안은 각종 토목 구조물을 시공하기 위한 지하 굴착시 형성되는 가설 또는 영구 토류벽 시공법에 있어서, 각각의 토류벽공법에 사용되는 H-Pile을 별도의 연결판에 의해 연속적으로 연결 시공할 수 있게 하되, 상기한 연결판은 측단을 슬라이딩 결합이 가능한 후크 형상으로 제작하여 각각의 H-Pile이 수직방향으로 삽입 또는 분리될 수 있게 함으로서, 각각의 H-Pile 연결이 매우 용이하면서도 토류벽의 양생 후 그 H-Pile을 용이하게 인출하여 재사용할 수도 있으므로,
      강성이 증대된 토류벽에 의해 별도의 보조차수공법이 필요치 않으면서도 차수 효과가 매우 뛰어난 것이며, 지반의 형질 및 굴착심도에 구애받지 않고 모든 조건을 만족시킬 수 있으며, 시공되는 벽체의 두께를 보다 얇게 형성할 수 있어 공간활용성이 뛰어나면서도 시공과정을 통해 가설벽이나 영구벽으로 설정 시공할 수도 있는 것이며, 장비조합이 간단하고 공사기간의 단축효과를 기대할 수 있어 경제성 및 안정성이 매우 뛰어난 토류벽 공법에 적용되는 H-Pile의 연속 결합구조이다.