会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 31. 发明公开
    • 태양전지식 LED 도로 표지병
    • 太阳能电池类型LED路灯
    • KR1020120114828A
    • 2012-10-17
    • KR1020110032612
    • 2011-04-08
    • 주식회사 동성엔지니어링남정호
    • 김원근이학모윤종구남정호손성익
    • E01F9/06F21S9/03
    • Y02B20/72
    • PURPOSE: A solar cell type LED road stud is provided to improve visibility and environmentally-friendly effects by powering two or more LEDs using a solar cell. CONSTITUTION: A solar cell type LED road stud comprises a solar cell(100), a pair of batteries(310,320), first and second detection units(410,420), a charge control unit(200), first and second switches(S1,S2), an electric discharge control unit(500), third and fourth switches(S3,S4), a drive unit(700), and multiple LEDs(31). The solar cell converts sunlight into voltage. The batteries are charged with the voltage. The first and second detection units detect the voltage of the batteries. The charge control unit determines whether the detected voltage of the batteries is less than reference voltage and outputs a first switch signal. The first and second switches maintain the charging state of the batteries. The charge control unit outputs a second switching signal opposite to the first switching signal. The third and fourth switches cuts off or supplies discharge voltage to the batteries. The drive unit generates driving voltage depending on the supplied discharge voltage. The LEDs are powered by the driving voltage. [Reference numerals] (100) Solar cell; (200) Charge control unit; (310) Battery; (320) Battery; (410) First detection unit; (420) Second detection unit; (500) Electric discharge control unit; (600) Day/night recognition unit; (700) Drive unit
    • 目的:提供太阳能电池型LED路灯,以通过使用太阳能电池供电两个或更多个LED来提高可见性和环保效果。 构成:太阳能电池型LED路灯包括太阳能电池(100),一对电池(310,320),第一和第二检测单元(410,420),充电控制单元(200),第一和第二开关(S1,S2) ),放电控制单元(500),第三和第四开关(S3,S4),驱动单元(700)和多个LED(31)。 太阳能电池将阳光转换成电压。 电池充满电压。 第一和第二检测单元检测电池的电压。 充电控制单元确定电池的检测电压是否小于参考电压,并输出第一开关信号。 第一和第二开关保持电池的充电状态。 充电控制单元输出与第一开关信号相反的第二开关信号。 第三和第四开关切断或向电池提供放电电压。 驱动单元根据所提供的放电电压产生驱动电压。 LED由驱动电压供电。 (附图标记)(100)太阳能电池; (200)控制单元; (310)电池; (320)电池; (410)第一检测单元; (420)第二检测单元; (500)放电控制单元; (600)昼/夜识别单位; (700)驱动单元
    • 33. 发明授权
    • 무교대, 무받침 및 무신축이음의 일체식 복합슬래브교량 및이의 시공방법
    • 一体化复合板桥,无变位,无支撑,无伸缩缝和施工方法
    • KR100983861B1
    • 2010-09-28
    • KR1020080015299
    • 2008-02-20
    • 홍석희주식회사 동성엔지니어링
    • 홍석희박석주
    • E01D21/00E01D19/12E01D19/02E01D101/28
    • 본 발명은 무교대, 무받침 및 무신축이음의 일체식 복합슬래브교량에 있어서, 교량의 경간장이 15 ~ 30m의 범위를 가지면서 형고를 최소로 하는 중경간 교량까지 적용하기 위하여 교량 상부구조를 낮은 형고의 압연강재종빔 또는 프리캐스트PSC콘크리트빔을 교량 빔으로 사용함과 동시에 외력의 응력과 변형을 상쇄 및 회복할 수 있는 프리스트레스를 도입하고, 향후 내하력이 저하될 경우 내하력 증가가 가능한 유지관리를 위한 PS강선을 배치하여 긴장 및 정착하고, 상기 압연강재종빔 또는 프리캐스트PSC콘크리트빔 내부에 콘크리트를 타설하여 복합슬래브를 형성한 교량 상부슬래브를 설치하고, 교량시종점부에 현장타설세미리지드파일기초로 설치된 단주파일에 강결된 상부슬래브거더로서 일체화하고, 교각에서도 교각의 구조와 상부슬래브가 강결연결하여 일체화한 무교대, 무받침 및 무신축이음의 일체식 복합슬래브교량을 설치하는 방법에 관한 것이다.
    • 本发明涉及一种具有未拉伸,未反转和未拉伸的接头的复合材料复合板桥,其中桥跨范围为15至30m, 通过使用轧钢jongbim或hyeonggo横梁预应力预制PSC混凝土梁,以抵消应力和外力和恢复的应变,并且,PS为维护尽可能引入承载能力增加,如果下一个负荷承载能力降低 放置导线在张力和固定,并且其中,基于所述桥通过安装混凝土的复合板桥上部板形成的轧钢jongbim或预制PSC混凝土梁存根放置内部并设置有铸造到位的半刚性文件时jongjeombu在 其结果是,桥墩和上部楼板的结构坚固。 它涉及到安装没有移位,没有背衬和没有伸缩接头,其一体地连接的一个整体复合板桥的方法。
    • 36. 发明公开
    • 빔 거치용 안전 지지대 장치
    • 光束安全支持装置
    • KR1020070064252A
    • 2007-06-20
    • KR1020060120385
    • 2006-12-01
    • 주식회사 동성엔지니어링
    • 윤종화김승규장기영
    • E01D19/00E01D19/10
    • E01D19/00E01D19/10
    • A safety support device for a beam is provided to prevent the overturn and position change of beams by supporting beams placed over a pier or an abutment simply, quickly and effectively and to have excellent field adaptability by handling easily. The invention relates to a safety support device(10) for supporting many beams(1) placed on the upper part of an abutment or a pier(2) between an abutment and a pier or a pier and a pier, thereby preventing the overturn or movement of the beams, which includes a safety support(20) fixed on the upper part of the beams across the upper part of two or more beams and composed of a ÝÀ-shaped section steel provided with the bottom and two side walls extended vertically from two ends of the bottom, and two or more pairs of fitting members(30) installed on the lower part of the safety support correspondingly to the distance between the beams.
    • 提供了一种用于梁的安全支撑装置,用于通过支撑放置在码头或基台上的梁简单,快速有效地防止梁的翻转和位置变化,并且通过容易地处理具有优异的场适应性。 本发明涉及一种用于支撑多个梁(1)的安全支撑装置(10),所述梁(1)放置在基台或墩台(墩)的上部之间,墩或码头与码头之间,从而防止翻倒或 梁的运动,其包括固定在梁的上部上的安全支撑件(20)穿过两个或更多个梁的上部并且由设置有底部的Ý形截面钢和从垂直方向延伸的两个侧壁组成 两个或更多对安装构件(30)对应于梁之间的距离安装在安全支架的下部上。
    • 37. 发明授权
    • 원터치식 철근이음장치
    • 원터치식철근이음장치
    • KR100439305B1
    • 2004-07-07
    • KR1020020018179
    • 2002-04-03
    • 주식회사 동성엔지니어링
    • 김세열
    • E04C5/16
    • PURPOSE: A one-touch type bar coupler is provided to shorten a period of work by reducing the number of processes for coupling bars and to couple reinforcing bars stably by removing the cause of lowering of the tensile strength on a joint. CONSTITUTION: The one-touch type bar coupler contains a hollow inner coupler(60) whose both sides are opened to interpose a reinforcing bar(50), outer couplers(70,80) coupled on both outer sides of the inner coupler(60) to be slide, many balls(91) reciprocating between the inner coupler(60) and the outer couplers(70,80) to limit the movement of the reinforcing bar(50), and an elastic spring(93) installed between the inner coupler(60) and the outer couplers(70,80) to generate elastic force.
    • 目的:提供一触式棒形连接器​​,通过减少连接棒的工艺数量并通过消除连接处拉伸强度降低的原因来稳定连接钢筋,从而缩短工作周期。 组成:单触式棒形连接器​​包括一个中空的内部连接件(60),其两侧敞开以插入钢筋(50),外部连接件(70,80)连接在内部连接件(60)的两个外侧上, (60)和外连接件(70,80)之间往复运动以限制钢筋(50)运动的许多滚珠(91),以及安装在内连接件 (60)和外部联接器(70,80)以产生弹性力。
    • 38. 实用新型
    • 공기튜브형틀을 이용한 콘크리트 거푸집
    • 使用空气管模板的混凝土模板
    • KR200349441Y1
    • 2004-05-10
    • KR2020040002177
    • 2004-01-30
    • 주식회사 동성엔지니어링윤종화
    • 윤종화
    • E02B13/00
    • E04G11/34E01F5/005
    • 소형 콘크리트 수로나 암거 등을 형성하는데 있어, 공기튜브형틀을 이용한 콘크리트 거푸집에 관한 기술이 개시된다.
      본 고안은 연속적인 내부공간을 갖는 소형 콘크리트 수로나 암거 등의 시공 시, 소형 수로나 암거 등의 내부형상에 대응하는 외형을 가진 공기튜브형틀 및 상기 공기튜브형틀에 장착되어 콘크리트 타설 시 측압으로부터 공기튜브형틀을 보호하고, 공기튜브형틀의 길이방향 연속이음을 가능하게 하는 형상유지수단을 이용하여 소형 수로나 암거 등을 형성함으로써 거푸집의 설치 및 해체가 더욱 용이하여 시공성이 높고, 거푸집 길이에 따른 구조물의 시공 길이 제한없이 장경간의 콘크리트 구조물에도 시공가능한 공기튜브형틀을 이용한 콘크리트 거푸집을 제공하는 것을 목적으로 하는 고안으로서, 이를 위하여 본 고안은 바닥콘크리트 상에 형성되는 소형 콘크리트 수로나 암거 등의 성형거푸집에서, 소형 콘크리트 수로나 암거의 내부형상에 대응하 는 외형을 갖고, 공기의 주입 및 배출이 가능한 공기튜브형틀; 및 상기 공기튜브형틀의 형상이 유지되도록 공기튜브형틀의 측면에 위치되는 형상유지수단;을 특징적인 구성으로 하는 공기튜브형틀을 이용한 콘크리트 거푸집을 제공한다.
    • 39. 发明公开
    • 원터치식 철근이음장치
    • 单触式加固耦合器
    • KR1020040037652A
    • 2004-05-07
    • KR1020020066226
    • 2002-10-29
    • 주식회사 동성엔지니어링
    • 한승룡
    • E04C5/16
    • PURPOSE: A one-touch type reinforcement coupler is provided to reduce working hours and to improve the constructability. CONSTITUTION: The one-touch type reinforcement coupler contains: two pairs of inner couplers(60) housing two deformed reinforcing bars(55) and moving to the semi-diameter direction at the appointed interval; a pair of intermediate couplers(70) coupled to the outside of two inner couplers(60) to limit the movement of the inner coupler(60); two outer couplers(80) overlapped to the outside of the intermediate couplers(70) to be slidable to move the inner coupler(60) to the inner or outer semi-diameter direction; and a spring(91) interposed between the outer couplers(80) to slide the outer coupler(80) outward automatically. If the outer coupler(80) is sliding to face each other against the elastic force by the spring(91), the inner coupler(60) moves to the outer semi-diameter direction to make the deformed reinforcing bar(55) house in the inner coupler(60), and if the outer coupler(80) slides to be more distant by the elastic force by the spring(91), the inner coupler(60) moves to the inner semi-diameter direction to be engaged with the deformed reinforcing bar(55) firmly.
    • 目的:提供一键式加强耦合器,以减少工作时间并提高构造性。 构成:单触式加强连接器包括:两对内部耦合器(60),其容纳两个变形的钢筋(55)并以指定的间隔移动到半径方向; 一对中间耦合器(70),耦合到两个内部耦合器(60)的外部,以限制内部耦合器(60)的运动; 两个外联接器(80)与中间联接器(70)的外侧重叠以可滑动以将内联接器(60)移动到内半径或外半径方向; 以及插入在外部联接器(80)之间以自动向外滑动外部联接器(80)的弹簧(91)。 如果外联接器80通过弹簧91抵抗弹力而相对滑动,则内联接器60移动到外半径方向,以使变形的钢筋(55)容纳在 内联合器(60),并且如果外联接器(80)通过弹簧(91)的弹力而滑动更远,则内联接器(60)向内半径方向移动以与变形 钢筋(55)牢固。
    • 40. 发明授权
    • 강관말뚝의 수평지지력 보강 공법
    • 강관말뚝의수평지지력보강공법
    • KR100429453B1
    • 2004-05-03
    • KR1020010007651
    • 2001-02-16
    • 주식회사 동성엔지니어링
    • 이강운
    • E02D5/28
    • PURPOSE: Provided is a horizontal bearing capacity reinforcement of steel pipe pile to reinforce steel pipe pile area on which a maximum bending moment is acted and improve horizontal bearing capacity of steel pipe pile by controlling cast contents of reinforcement concrete according to pitch between bedplate and sole plate. CONSTITUTION: The horizontal bearing capacity reinforcement of steel pipe pile(110) comprises the following steps as: supplying arrangement of bars connected with many movable vertical reinforcing bars(140) between sole plate(120) fixed to the upper part of the steel pipe pile(110) and bedplate(130) installed inside the steel pipe pile; controlling distance between the sole plate(120) and the bedplate(130) of the bar arrangements; inserting the bars into the upper part of the steel pipe pile(110) and fixing the sole plate(120) of the bar arrangements to the steel pipe pile(110); and casting reinforcing concrete on the bedplate of the bar arrangements installed inside the steel pipe pile(110) to certain height and curing.
    • 用途:提供一种钢管桩的水平承载力加固,以加固最大弯矩作用的钢管桩面积,并通过控制钢筋混凝土的浇筑量,根据底板和底板之间的间距控制钢管桩的水平承载力 盘子。 本发明公开了一种钢管桩110的水平承载力加固方法,包括以下步骤:在固定在钢管桩上部的底板120之间供给与多根活动垂直钢筋140连接的钢筋布置; (110)和底板(130)安装在钢管桩内; 控制所述杆装置的所述底板(120)与所述底板(130)之间的距离; 将钢筋插入钢管桩(110)的上部并将钢筋装置的底板(120)固定到钢管桩(110)上; 在钢管桩(110)内部安装的钢筋排列的台板上浇注钢筋混凝土至一定高度并固化。