    • 3. 发明专利
    • Pile hole wall protection method
    • 双孔保护方法
    • JP2012017581A
    • 2012-01-26
    • JP2010154445
    • 2010-07-07
    • East Japan Railway Co東日本旅客鉄道株式会社
    • ISHIBASHI TADAYOSHITANIGUCHI YOSHINORITAKEYA TSUTOMUIKEMOTO HIROFUMINAKAGAWA YURITAKASAKI HIDEAKIOTSUKA TAKAHITOSUZUKI HIROYUKIHOSHIKAWA TSUTOMU
    • E21D5/10E21D1/08
    • PROBLEM TO BE SOLVED: To provide a method for protecting a hole wall and boring a pile hole for a cast-in-place pile simultaneously in parallel.SOLUTION: An inventive method includes: connecting a plurality of cylindrical pipes (14) together, each of which has a diameter smaller than that of a pile hole and a length equal to or smaller than the depth of a bored part, and dropping them along a hole wall (15) simultaneously in parallel with boring the pile hole for a cast-in-place pile; and filling a back-fill material (16) in a clearance between the hole wall and the cylindrical pipes to bring the pipes into close contact with the wall. On the periphery of the tip of the lowermost cylindrical pipe, a seal material is attached, which is in contact with the hole wall when dropping the pipes and thus prevents the back-fill material from escaping.
    • 要解决的问题:提供一种同时平行地保护孔壁并对现场堆垛打桩的方法。 解决方案:本发明的方法包括:将多个圆柱形管道(14)连接在一起,每个圆柱形管道的直径小于桩孔的直径和等于或小于钻孔部分的深度的长度,以及 将其沿着孔壁(15)同时平放放置在桩上,用于现浇桩; 并在孔壁和圆柱形管之间的间隙中填充填充材料(16)以使管道与壁紧密接触。 在最下面的圆柱形管的尖端的周边上,安装密封材料,当下降管道时,密封材料与孔壁接触,从而防止后填充材料逸出。 版权所有(C)2012,JPO&INPIT
    • 7. 发明专利
    • Pit excavating apparatus and pit excavating construction method
    • 挖坑装置和挖坑施工方法
    • JP2010019046A
    • 2010-01-28
    • JP2008182874
    • 2008-07-14
    • Takemura:Kk有限会社タケムラ
    • TAKEMURA EISAI
    • E21B7/00E21D1/08
    • PROBLEM TO BE SOLVED: To safely and surely excavate a pit while preventing the collapse of natural ground.
      SOLUTION: A pit excavating apparatus includes a screw 5 consisting of multiple upper/lower tiers of joint screws driven with an auger driving unit 4 attached to a base machine 2, a casing 6 consisting of multiple upper/lower tiers of joint casings covering the screw 5 except its lower part, an excavation bucket driving unit 7 fixed to the outer peripheral surface of the lowermost tier of joint casing 6B, and an excavation bucket 8 which is driven with the driving unit 7 and undergoes the insertion of the lower part of the screw 5 and of the casing 6. while receiving a reaction force from the base machine 2, excavation bits 10, ..., and auger bits 11, ..., excavate the ground G, and excavated sand and earth is discharged from the discharge outlet 12 of the casing 6. A guide pipe casing 20 is press fit prior to placement of liner plates 15A, ..., and sand and earth in the guide pipe casing 20 is excavated down to a level almost equivalent to the lower end of the guide pipe casing 20.
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:为了安全可靠地挖坑,同时防止自然地面的崩溃。 解决方案:坑挖掘装置包括螺钉5,螺钉5由连接到基础机器2的螺旋推进器4驱动的多个上/下层的关节螺钉组成,壳体6由多个上/下层的接头壳体 覆盖除了其下部的螺钉5,固定在接头壳体6B的最下层的外周面的挖掘斗驱动单元7和由驱动单元7驱动并经历下部 螺杆5和壳体6的一部分,同时接受来自基础机器2,挖掘钻头10,...和螺旋钻钻头11 ...的反作用力挖掘地面G,挖出的砂土是 从壳体6的排出口12排出。在衬板15A,...的放置之前,将导管壳体20压配合,将引导管壳体20中的砂土挖掘到几乎相当于 导管外壳20的下端。 版权所有(C)2010,JPO&INPIT
    • 10. 发明专利
    • Shaft excavation equipment
    • SHAFT挖掘设备
    • JP2007113340A
    • 2007-05-10
    • JP2005308226
    • 2005-10-24
    • Taguchi Kogyo Kkタグチ工業株式会社
    • TAGUCHI KAZUOSABETSUTO NORITOKI
    • E21D1/08
    • PROBLEM TO BE SOLVED: To provide shaft excavation equipment which enables efficient feeding of concrete and placement of the concrete in a manner eliminating a waiting time.
      SOLUTION: The shaft excavation equipment is provided with a muck bucket for taking out excavation muck to the outside of a shaft, and a concrete bucket 10 for taking in concrete C from the outside of the shaft, so that the buckets are vertically movable in the shaft T. Then each floor of a scaffold 1 has a through hole 1a to allow the muck bucket to vertically pass therethrough, and a concrete hopper 9 detachably attached to the through hole 1a. Thus during excavation, the muck bucket passes through the through hole 1a of the scaffold 1 to take out the excavation muck to the outside of the shaft. On the other hand during concrete placement, the concrete hopper 9 is attached to the through hole 1a of the scaffold 1, and thereafter the concrete C taken into the shaft by the concrete bucket 10 is transported to be placed on a side wall of the shaft T.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供可以有效地供给混凝土和放置混凝土的轴挖掘设备,从而消除等待时间。 解决方案:轴挖掘设备设有用于将挖掘泥屑引入轴外部的垃圾桶和用于从轴外吸入混凝土C的混凝土桶10,使得铲斗垂直 然后在脚手架1中移动。然后,脚手架1的每个楼层都有一个通孔1a,用于允许垃圾桶垂直通过,一个可拆卸地安装在通孔1a上的混凝土料斗9。 因此,在挖掘时,垃圾桶通过支架1的通孔1a,将挖掘泥屑取出到轴的外侧。 另一方面,在混凝土浇筑时,将混凝土料斗9安装在支架1的通孔1a上,之后由混凝土铲斗10将混入的混凝土C输送到轴上,以将其放置在轴的侧壁 (C)2007,JPO&INPIT