    • Method for installing steel sheet pile
    • 安装钢板桩的方法
    • JP2012207371A
    • 2012-10-25
    • JP2011071428
    • 2011-03-29
    • Penta Ocean Construction Co Ltd五洋建設株式会社
    • MORIMOTO HIROAKI
    • E02D5/04E02D13/02
    • PROBLEM TO BE SOLVED: To provide a method for installing a steel sheet pile which can install a long steel sheet pile at a low cost and accurately without using a modified steel sheet pile and is hardly affected by meteorological and marine conditions.SOLUTION: When a plurality of permanent steel sheet piles 1,1... are driven into a foundation A so that the lengthwise direction is directed in the vertical direction and that the permanent steel sheet piles are arranged adjacent to each other in the width direction, a guiding steel sheet pile 2 shorter than the permanent steel sheet pile 1 is driven into a position in the foundation A into which the permanent steel sheet pile 1 is planned to be driven, directing the lengthwise direction in the vertical direction. Thereby guide holes 6,6... directed in the vertical direction are formed, after which the guiding steel sheet pile 2 is withdrawn, and in place of the withdrawn guiding steel sheet pile 2, the lower end side of the permanent steel sheet pile 1 is inserted in the guide hole 6 and installed, and the permanent steel sheet pile 1 is driven into a prescribed depth of the foundation A.
    • 要解决的问题:提供一种安装钢板桩的方法,该钢板桩可以在不使用改性钢板桩的情况下以低成本且准确地安装长钢板桩,并且几乎不受气象和海洋条件的影响。 解决方案:当多个永久钢板桩1,1 ...被驱动到基础A中,使得纵向方向指向垂直方向,并且永久钢板桩彼此相邻配置时 宽度方向,比永久性钢板桩1短的导向钢板桩2被驱动到永久性钢板桩1被计划驱动的基础A中的垂直方向上的长度方向的位置。 由此形成沿垂直方向的引导孔6,6 ...,之后引导钢板桩2被取出,并且代替退出的导向钢板桩2,永久钢板桩的下端侧 1插入引导孔6并安装,永久性钢板桩1被驱动到基础A的规定深度。版权所有(C)2013,JPO&INPIT