会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明专利
    • Anti-termite structure
    • JP5289853B2
    • 2013-09-11
    • JP2008201903
    • 2008-08-05
    • 日本エンバイロケミカルズ株式会社
    • 慎治 ▲吉▼田
    • E04B1/72
    • PROBLEM TO BE SOLVED: To provide a termite prevention structure enabling a chemical to be easily and reliably sprayed in re-construction while having superior sustainability and durability over a long period. SOLUTION: This termite prevention structure 1 includes a foundation concrete 2, a solid preparation 5, and a passage 7 for spraying the chemical over the solid preparation 5. The solid preparation 5 or the passage 7 is disposed on the foundation concrete 2. The solid preparation 5 and the passage 7 are disposed opposite to each other. In the termite prevention structure 1, the solid preparation 5 is constructed. Since a termite prevention effect can be sustainably maintained over a long period from the beginning of the construction, a period up to a re-construction can be secured long. In the re-construction, the chemical is penetrated into the constructed solid preparation 5 by supplying the chemical to the passage 7. Consequently, the termite prevention effect from the beginning of the construction can be re-maintained by easily and reliably spraying the chemical in the re-construction. COPYRIGHT: (C)2010,JPO&INPIT
    • 10. 发明专利
    • Termite prevention structure and termite prevention method
    • 预防结构和预防措施
    • JP2012255336A
    • 2012-12-27
    • JP2012191308
    • 2012-08-31
    • Japan Enviro Chemicals Ltd日本エンバイロケミカルズ株式会社
    • YOSHIDA SHINJIYAMATO SABURO
    • E04B1/72
    • PROBLEM TO BE SOLVED: To provide a termite prevention structure and termite prevention method in which medicines can be scattered easily and surely in the case of re-construction while improving persistence and durability for a long time.SOLUTION: In installation concrete 32 of which the cross section is rectangular, extending in a horizontal direction and a fabric foundation 33 of which the cross section is rectangular, disposed to extend upward, in the beginning of construction, solid preparation 5 is constructed to form a passageway 7 and thereafter, a first heat insulation material 10 and a second heat insulation material 35 are disposed. The first heat insulation material 10 is arranged along with an inner side surface of the fabric foundation 33 while being spaced apart from an upper surface of the installation concrete 32 through a spot where the solid preparation is constructed. The second heat insulation material 35 is arranged along with the upper surface of the installation concrete 32 while being spaced apart from the inner side surface of the fabric foundation 33 through the spot where the solid preparation is constructed. The passageway 7 is formed from a lower surface of the first insulation material 10, a side surface of the second insulation material 35 opposed to the fabric foundation 33 and an upper surface of the solid preparation and medicines are supplied to the passageway 7 after the lapse of a predetermined period therefrom, thereby scattering the medicines over the solid preparation 5.
    • 要解决的问题:为了提供白蚁防止结构和白蚁防止方法,其中在重新构建的情况下药物可以容易且可靠地分散,同时改善长时间的持久性和耐久性。 解决方案:在结构开始时,在横截面为矩形的水平方向的安装混凝土32和横截面为矩形的织物基底33设置成向上延伸,固体制剂5为 构造成形成通路7,之后设置第一绝热材料10和第二隔热材料35。 第一绝热材料10与织物基座33的内侧表面一起布置,同时与安装混凝土32的上表面间隔开固定制剂构建的位置。 第二绝热材料35与安装混凝土32的上表面一起布置,同时与织物基底33的内侧表面间隔开固体制剂构造的位置。 通道7由第一绝缘材料10的下表面,与织物基底33相对的第二绝缘材料35的侧表面和固体制剂的上表面以及药物在经过后供给到通道7中 从而将药物散布在固体制剂5上。版权所有:(C)2013,JPO&INPIT