会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Termite prevention structure and termite prevention method
    • 预防结构和预防措施
    • JP2012255336A
    • 2012-12-27
    • JP2012191308
    • 2012-08-31
    • Japan Enviro Chemicals Ltd日本エンバイロケミカルズ株式会社
    • YOSHIDA SHINJIYAMATO SABURO
    • E04B1/72
    • PROBLEM TO BE SOLVED: To provide a termite prevention structure and termite prevention method in which medicines can be scattered easily and surely in the case of re-construction while improving persistence and durability for a long time.SOLUTION: In installation concrete 32 of which the cross section is rectangular, extending in a horizontal direction and a fabric foundation 33 of which the cross section is rectangular, disposed to extend upward, in the beginning of construction, solid preparation 5 is constructed to form a passageway 7 and thereafter, a first heat insulation material 10 and a second heat insulation material 35 are disposed. The first heat insulation material 10 is arranged along with an inner side surface of the fabric foundation 33 while being spaced apart from an upper surface of the installation concrete 32 through a spot where the solid preparation is constructed. The second heat insulation material 35 is arranged along with the upper surface of the installation concrete 32 while being spaced apart from the inner side surface of the fabric foundation 33 through the spot where the solid preparation is constructed. The passageway 7 is formed from a lower surface of the first insulation material 10, a side surface of the second insulation material 35 opposed to the fabric foundation 33 and an upper surface of the solid preparation and medicines are supplied to the passageway 7 after the lapse of a predetermined period therefrom, thereby scattering the medicines over the solid preparation 5.
    • 要解决的问题:为了提供白蚁防止结构和白蚁防止方法,其中在重新构建的情况下药物可以容易且可靠地分散,同时改善长时间的持久性和耐久性。 解决方案:在结构开始时,在横截面为矩形的水平方向的安装混凝土32和横截面为矩形的织物基底33设置成向上延伸,固体制剂5为 构造成形成通路7,之后设置第一绝热材料10和第二隔热材料35。 第一绝热材料10与织物基座33的内侧表面一起布置,同时与安装混凝土32的上表面间隔开固定制剂构建的位置。 第二绝热材料35与安装混凝土32的上表面一起布置,同时与织物基底33的内侧表面间隔开固体制剂构造的位置。 通道7由第一绝缘材料10的下表面,与织物基底33相对的第二绝缘材料35的侧表面和固体制剂的上表面以及药物在经过后供给到通道7中 从而将药物散布在固体制剂5上。版权所有:(C)2013,JPO&INPIT
    • 2. 发明专利
    • Coating material composition for preventing and exterminating termite
    • 涂层材料组合物,用于防止和外露TERMITE
    • JP2007146159A
    • 2007-06-14
    • JP2006299389
    • 2006-11-02
    • Japan Enviro Chemicals Ltd日本エンバイロケミカルズ株式会社
    • YOSHIDA SHINJIOSHIMA JUNJIYAMATO SABURO
    • C09D201/00A01N25/04A01N25/28A01N47/02A01N47/22A01N51/00A01P7/04C09D5/02C09D5/14C09D7/12C09D133/00C09D183/07C09D183/10
    • PROBLEM TO BE SOLVED: To provide a coating material composition for preventing and exterminating termites to form a coated film efficiently expressing effects on termite prevention and extermination for a long period of time.
      SOLUTION: The coating material composition for preventing and exterminating termites is prepared by blending a resin emulsion (e.g., an acryl modified silicone resin emulsion, an acrylic resin emulsion, a mixture of those or the like) with an inorganic filler (e.g., fine particles of calcium carbonate, titanium oxide or the like) and a termite preventing and exterminating component (e.g., chlothianidine or the like) having -6 Pa saturated vapor pressure at 25°C or ≥55% residual rate after open air preservation for 6 months at 40°C. The component for termite prevention and extermination is, if needed, brought to be a microencapsulated, powdery or granular formulation.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种用于防止和消除白蚁以形成涂层膜的涂料组合物,其有效地表现出长时间对防止白蚁的杀灭作用。 解决方案:通过将树脂乳液(例如丙烯酸改性的有机硅树脂乳液,丙烯酸树脂乳液,它们的混合物等)与无机填料(例如,丙烯酸改性硅树脂乳液,丙烯酸树脂乳液,其混合物等)共混来制备用于防止和消除白蚁的涂料组合物。 ,碳酸钙,二氧化钛等的细颗粒)和在25℃下具有<1.0×10 -6 -6 Pa饱和蒸汽压的白蚁防止和灭火组分(例如氯洛西丁等)或 40℃后露天保存6个月后残留率≥55%。 如果需要,防白蚁防治成分是微胶囊化,粉状或颗粒状制剂。 版权所有(C)2007,JPO&INPIT
    • 3. 发明专利
    • Termite proof structure and termite proof method
    • TERMITE PROOF结构和TERMITE证明方法
    • JP2009155949A
    • 2009-07-16
    • JP2007336701
    • 2007-12-27
    • Japan Enviro Chemicals Ltd日本エンバイロケミカルズ株式会社
    • YOSHIDA SHINJIYAMATO SABURO
    • E04B1/72E02D27/01E04B1/80
    • PROBLEM TO BE SOLVED: To provide a termite proof structure and a termite proof method capable of forming a passage for applying a chemical by a simple method and of easily and surely spraying the chemical after a thermal insulator is installed.
      SOLUTION: The thermal insulator 4 is so disposed along a continuous footing 2 extending in the vertical direction and a deposited concrete 3 extending horizontally from the continuous footing 2 that the gap facing the connection portion 8 between the inner side surface of the continuous footing 2 and the upper surface of the deposited concrete 3 is defined as a passage 7 for applying the chemical. The chemical is sprayed over the connection portion 8 by supplying the chemical to the passage 7 immediately and/or after a predetermined period is elapsed. By the termite proof structure 1 and the termite proof method, while easily forming the passage 7 by the thermal insulator 4, the chemical can be easily and surely sprayed after the thermal insulator 4 is disposed.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种能够通过简单的方法形成用于施加化学品的通道的白蚁防护结构和防白蚁方法,并且在安装绝热体之后容易且可靠地喷洒化学品。 解决方案:绝热体4沿着沿垂直方向延伸的连续的基脚2设置,并且从连续的基脚2水平延伸的沉积的混凝土3,使得与连续部分8的内表面之间的间隙面对连续部分8 基底2和沉积混凝土3的上表面被定义为用于施加化学品的通道7。 通过将化学品立即和/或经过预定时间后将化学品供给通道7,喷洒在连接部分8上。 通过白蚁防护结构1和防白蚁方法,在通过绝热体4容易地形成通道7的同时,可以在布置绝热体4之后容易且可靠地喷涂化学品。 版权所有(C)2009,JPO&INPIT
    • 4. 发明专利
    • Termite proof structure and termite proof method
    • TERMITE PROOF结构和TERMITE证明方法
    • JP2008180075A
    • 2008-08-07
    • JP2007336700
    • 2007-12-27
    • Japan Enviro Chemicals Ltd日本エンバイロケミカルズ株式会社
    • YOSHIDA SHINJIYAMATO SABURO
    • E04B1/72
    • PROBLEM TO BE SOLVED: To provide a termite proof structure and a termite proof method which are excellent in endurance and durability, and which make possible easy and secure medications at the time of reconstruction. SOLUTION: In the early stage of construction, a solid tablet 5 is executed so that a passage 7 is formed. Then, after the expiration of a predetermined time interval, the medications are fed to the passage 7, thus the medications are dispersed to the solid tablet 5. According to the termite prevention structure 1 and the termite repelling method, excellent endurance and durability can be realized over an extended period of time, and a termite prevention effect in the early stage of construction can be maintained again by medicating easily and securely at the time of reconstruction. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供耐久性和耐久性优异的白蚁防护结构和防白蚁方法,并且可以在重建时使药物容易且安全。 解决方案:在构造的早期阶段,执行固体片5,从而形成通道7。 然后,在预定时间间隔期满后,将药物送入通道7,由此将药物分散在固体片剂5中。根据白蚁防止结构1和白蚁排斥法,耐久性和耐久性优异 在长时间内实现,在建设初期,通过在重建时容易,安全地进行药物治疗,可以再次保持白蚁防治效果。 版权所有(C)2008,JPO&INPIT
    • 6. 发明专利
    • Termite prevention structure and termite prevention method
    • 预防结构和预防措施
    • JP2012229620A
    • 2012-11-22
    • JP2012191309
    • 2012-08-31
    • Japan Enviro Chemicals Ltd日本エンバイロケミカルズ株式会社
    • YOSHIDA SHINJIYAMATO SABURO
    • E04B1/72
    • PROBLEM TO BE SOLVED: To provide a termite prevention structure in which a medicine can be scattered easily and surely during re-construction while improving persistence and durability for a long time, and a termite prevention method.SOLUTION: While a passage forming member such as a pipe 6 is installed beforehand, in the beginning of construction, a semisolid preparation 5 is constructed to form a passage 7 and after the lapse of a predetermined period of time, a medicine is supplied from the passage forming member to the passage 7, thereby scattering the medicine over the semisolid preparation 5. According to a termite prevention structure 1 and a termite prevention method, in re-construction, the medicine is scattered easily and surely while improving persistence and durability for a long time, thereby maintaining termite prevention effects in the beginning of construction again.
    • 要解决的问题:为了提供在重新施工期间能够容易且可靠地分散药物的白蚁防止结构,同时提高长时间的持久性和耐久性以及防止白蚁的方法。

      解决方案:在预先安装诸如管道6的通道形成构件的同时,在开始构造时,构成半固体制剂5以形成通道7,并且经过预定时间段后,药物 从通道形成构件供给到通道7,从而将药物散布在半固体制剂5上。根据防止白蚁的结构1和防止白蚁的方法,在重新构建中,药物容易且可靠地分散,同时改善持久性, 耐久性好,从而在施工开始时再次保持白蚁防治效果。 版权所有(C)2013,JPO&INPIT