会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Roof remodeling method
    • 房屋重建方法
    • JP2007255123A
    • 2007-10-04
    • JP2006082928
    • 2006-03-24
    • Yodogawa Steel Works Ltd株式会社淀川製鋼所
    • YANAI TAKASHIINOUE YASUHIROSHIMIZU MASASHIHANIYU AKINORI
    • E04D3/00E04B7/00E04G23/02
    • PROBLEM TO BE SOLVED: To eliminate the backing for an existing ceiling comprising ceiling joist and its fixing beads, to omit drilling work for machine screw holes which causes the scattering of cutting dust and other dust when concealing the bottom surface of an existing roof by using a new ceiling and also to permit to build the new ceiling easily within a short period of time.
      SOLUTION: When concealing a bottom surface of an existing asbestos slate roof A by using a new ceiling C, which was previously built by fixing the asbestos slate roofing members erected to steel purlins 1 by hook bolts 3 with their bottom portions connected to the purlins, both metal hangers 13 each formed with suspending ties 11 for securing to the purlins 1 and with grooves 12 for holding a ceiling member opened in a longitudinal direction of the purlins as well as ceiling members 15 formed with male and female fitting portions 14a and 14b mutually fitted together and arranged side by side adjacently along the side edge in a longitudinal direction of the purlins are utilized. Metal hangers are supported by suspending them from the purlins; and side edges of the ceiling members are inserted to the grooves of the metal hangers thereby installing a sloped ceiling below and along the asbestos slate ceiling.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了消除包括天花板托梁及其固定珠的现有天花板的背衬,省略机器螺丝孔的钻孔工作,当隐藏现有的底部表面时,会导致切割灰尘和其他灰尘的散射 屋顶采用新的天花板,并允许在短时间内轻松建造新天花板。 解决方案:通过使用新的天花板C来隐藏现有的石棉板岩屋顶A的底面,该天花板C是先前通过将其底部连接到钢丝pur条1固定在钢pur条1上的石棉板岩屋顶构件 pur条,两个金属吊架13均形成有用于固定在pur条1上的悬挂带11和用于保持在pur条的纵向方向上开口的天花板构件的槽12以及形成有阴和阴配合部分14a的天花板构件15 并且使用相互嵌合在一起并且沿着pur条的纵向方向沿着侧边相邻并排布置。 将金属衣架从pur条悬挂下来支持; 并且天花板构件的侧边缘被插入到金属吊架的槽中,从而在石棉板岩天花板的下方和下方安装倾斜的天花板。 版权所有(C)2008,JPO&INPIT
    • 2. 发明专利
    • Mounting structure for folded-plate roof material
    • 折叠屋顶材料的安装结构
    • JP2006046005A
    • 2006-02-16
    • JP2004231513
    • 2004-08-06
    • Yodogawa Steel Works Ltd株式会社淀川製鋼所
    • SHIMIZU MASASHIOSUMI YASUNARIYANAI TAKASHIINOUE YASUHIRO
    • E04D3/362E04D3/36
    • PROBLEM TO BE SOLVED: To provide a mounting structure for a fitting-type folded-plate roof material, which is excellent in constructibility, which enables the proper fitting of a tight frame and the folded-plate roof material, and which can ensure the state of the fitting.
      SOLUTION: This mounting structure for the folded-plate roof material is used for mounting the folded-plate roof material 1 on a tight frame 9 which is erected and fixed on a structural material for the roof. In the mounting structure, a locking part 8 is provided near a bottom part 3 of the roof material 1; the tight frame 11 has a mountain-shaped 12 which is equipped with two side wall parts 14 and a top part 15 continuously provided on the upside of the side wall parts 14; a part 18 to be locked, subject to the locking of the locking part 8, is provided in the two side wall parts 14; the bottom part 3 and a fitting part 19, which comprises the part 18 of either of the adjacent tight frames 11 and the part 18 of the other tight frame 11, are fixed in the state of being fitted together; and the part 18 is equipped with a main body 18a of the part to be locked, which is elongated sideward from the side wall part, and stoppers 18b and 18c which are provided on the upside of the main body 18a so as to regulate deformation in the direction of the unlocking of the locking part 8 from the main body 18a.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种配合型折叠板屋顶材料的安装结构,其具有优异的结构性,其能够适当地安装紧凑的框架和折叠的屋顶材料,并且其可以 确保配件的状态。 解决方案:用于折叠板屋顶材料的该安装结构用于将折叠板屋顶材料1安装在竖立并固定在屋顶的结构材料上的紧密框架9上。 在安装结构中,在屋顶材料1的底部3附近设置有锁定部8; 紧固框架11具有山形12,其配备有两个侧壁部分14和连续设置在侧壁部分14的上侧上的顶部15; 在两个侧壁部分14中设置有被锁定的锁定部分8的被锁定的部分18; 底部3和装配部分19,其包括相邻的紧固框架11中的任一个的部分18和另一个紧固框架11的部分18被固定在装配在一起的状态; 并且部件18配备有从侧壁部向侧面延伸的待锁定部分的主体18a以及设置在主体18a的上侧上的止动件18b和18c,以便调节变形 锁定部分8从主体18a解锁的方向。 版权所有(C)2006,JPO&NCIPI
    • 3. 发明专利
    • Attachment structure of ceiling board
    • 天花板连接结构
    • JP2007239360A
    • 2007-09-20
    • JP2006065087
    • 2006-03-10
    • Yodogawa Steel Works Ltd株式会社淀川製鋼所
    • OMAE TADAHIKOYANAI TAKASHIINOUE YASUHIROSHIMIZU MASASHIHANIYU AKINORI
    • E04B9/26
    • PROBLEM TO BE SOLVED: To provide an attachment structure of a ceiling board by which the ceiling board can be attached to a roof substrate easily and quickly without using fixing screws, holding implements or the like. SOLUTION: The roof substrate 1 is formed of a lipped channel steel. A male-side engaging piece 13 having an L-shape to be hooked to a lower lip 6 of the substrate 1 is continuously provided at a side edge of the ceiling board 10, and a female-side engaging piece 12 formed to be a hook-like shape engageable with the upper side of the male-side engaging piece 13 in a manner of overlapping is continuously provided at the other side edge of the ceiling board 10. The male-side engaging piece 13 of one of the two ceiling boards 10, 10 adjacent to each other is hooked to the lower lip 6 of the substrate 1, and the female-side engaging piece 12 of the other ceiling board 10 is hooked so that it may overlap the upper side of the male-side engaging piece 13. The ceiling boards 10 are attached in sequence in this manner. COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了提供一种天花板的安装结构,通过该天花板,天花板可以容易且快速地安装到屋顶基板上,而不使用固定螺钉,保持工具等。 解决方案:屋顶基板1由唇形通道钢形成。 在天花板10的侧边缘处连续地设置具有钩接到基板1的下唇部6的L形的阳侧接合片13,并且形成为钩状的阴侧接合片12 在天花板10的另一侧边缘处连续地设置以重叠的方式与阳侧接合片13的上侧接合的类似形状。两个顶板10中的一个的阳侧接合片13 彼此相邻的10被钩接到基板1的下唇部6,并且另一个顶板10的阴侧接合片12被钩挂,使得其可以与阳侧接合片13的上侧重叠 以这种方式依次安装天花板板10。 版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Mounting structure for folded-plate roof material
    • 折叠屋顶材料的安装结构
    • JP2006046004A
    • 2006-02-16
    • JP2004231506
    • 2004-08-06
    • Yodogawa Steel Works Ltd株式会社淀川製鋼所
    • SHIMIZU MASASHIOSUMI YASUNARIYANAI TAKASHIINOUE YASUHIRO
    • E04D3/362E04D3/36
    • PROBLEM TO BE SOLVED: To provide a mounting structure for a fitting-type folded-plate roof material, which ensures sufficient strength and watertight performance, which is excellent in constructibility, and which facilitates the scoop-cover fitting of the folded-plate roof materials even in an intermediate section between beams.
      SOLUTION: This mounting structure for the folded-plate roof material is used for mounting the folded-plate roof material 1 on a tight frame 9 which is erected and fixed on a structural material for the roof. In the mounting structure, first locking parts 7 are each provided near a top part 4' part of one end of the adjacent roof materials 1 and 1 and near a top part 4 of the other end; a second locking part 8 is formed near a bottom part 3 of the roof material 1; and the tight frame 9 is provided with a first fitting part K1 which is equipped with first parts 11a and 12a to be locked, subject to the locking of the locking parts 7, and a second fitting part K2 which is equipped with a second part 16 to be locked, subject to the locking of the locking part 8, so that the top part 4' and the fitting part K1 can be fixed together in a fitted state, and so that the bottom part 3 and the fitting part K2 can be fixed together in a fitted state.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了提供一种用于装配式折叠板屋顶材料的安装结构,其确保足够的强度和水密性能,其结构性优异,并且有助于折叠式屋顶材料的勺盖安装, 平板屋顶材料即使在梁之间的中间部分。 解决方案:用于折叠板屋顶材料的该安装结构用于将折叠板屋顶材料1安装在竖立并固定在屋顶的结构材料上的紧密框架9上。 在安装结构中,第一锁定部件7分别设置在相邻屋顶材料1和1的一端的顶部4'附近并且靠近另一端的顶部4附近; 在屋顶材料1的底部3附近形成第二锁定部8; 并且紧固框架9设置有第一装配部K1,第一装配部K1配备有锁定的第一部分11a和12a以及锁定部7的锁定,第二装配部K2配备有第二部分16 被锁定,由于锁定部8的锁定,使得顶部4'和配合部K1能够以嵌合状态固定在一起,并且使得底部3和配合部K2能够被固定 一起处于适合状态。 版权所有(C)2006,JPO&NCIPI
    • 6. 发明专利
    • Beam steel frame in ceiling for repairing roof and ceiling member fitting-in structure
    • 用于修复屋顶和天花板配件结构的吊顶中的梁钢框架
    • JP2007303190A
    • 2007-11-22
    • JP2006133549
    • 2006-05-12
    • Yodogawa Steel Works Ltd株式会社淀川製鋼所
    • YANAI TAKASHIINOUE YASUHIROSHIMIZU MASASHIHANIYU AKINORI
    • E04G23/02E04B9/24
    • PROBLEM TO BE SOLVED: To provide a beam steel frame and a ceiling member fitting-in structure capable of preventing occurrence of a clearance between the beam steel frame supporting a purlin and a roof member and achieving satisfactory construction property in a ceiling for repairing roof by hiding a lower face of the existing roof by the ceiling. SOLUTION: In this ceiling C for repairing roof constructed below the existing roof constituted by constructing the roof member on the steel-made purlin 1 in a condition in which it is inclined along the existing roof, ceiling cornices 17A, 17B, 17C, 17D forming fitting parts b in which end parts of ceiling members 16 are inserted so as to slide freely in the in-plane direction are provided among the beam steel frames 10, 11 supporting the purlin 1 and the ceiling member 16 attached to a lower part of the purlin 1 to block a clearance among the beam steel frames 10, 11 and the ceiling member 16 by the ceiling cornices. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种梁钢框架和顶板构件装配结构,其能够防止在支撑pur条的梁钢框架与屋顶构件之间发生间隙,并且在天花板中实现令人满意的施工性能 通过在天花板上隐藏现有屋顶的下面来修复屋顶。

      解决方案:在该天花板C上,修理在现有屋顶下方建造的屋顶,该屋顶由沿着现有屋顶倾斜的状态下在钢制pur条1上构造屋顶构件,天花板檐板17A,17B,17C ,17D形成配合部件b,其中天花板构件16的端部插入以在面内方向上自由滑动,在支撑pur条1的梁钢框架10,11和附接到下部的顶板构件16之间 桁架1的一部分,以通过天花板檐口阻挡梁钢框架10,11和天花板构件16之间的间隙。 版权所有(C)2008,JPO&INPIT