    • 2. 发明专利
    • Power plant constructing method
    • 发电厂建设方法
    • JP2003013621A
    • 2003-01-15
    • JP2001200141
    • 2001-06-29
    • Shimizu CorpToshiba CorpToshiba Eng Co LtdToshiba Plant Kensetsu Co Ltd東芝エンジニアリング株式会社東芝プラント建設株式会社株式会社東芝清水建設株式会社
    • WATANABE KOICHIMURAKAMI MASATAKASORI SHINJIYUHARA KOZONIINA TAKAYUKIATSUJI TAKEHIROMURAKAMI HIROSHIMIURA NOBUAKIMITSUI SHIGEYAINOUE SATOSHISUZUKI YUICHIROMAKISHI YASUTOMOTAKEDA SHINICHI
    • E04B1/16E04B1/35E04G21/14E04H5/02G21C13/00
    • Y02E30/40
    • PROBLEM TO BE SOLVED: To provide a power plant constructing method which improves the strength of a module structure, easily copes with weight increase in module when the plant is upsized or a lot of equipment is united to the plant, allows construction of the plant in various modes corresponding to various types of building structure such as a building with/without walls, can modularize various types of equipment arranged above or below the plant in a large amount, drastically improves the workability of incorporation of the equipment into the building, concrete placement, etc., and enhances the reliability of the strength of the constructed building.
      SOLUTION: The power plant building method is available for constructing the power plant of a steel concrete structure formed of steel columns 12, steel beams 13, and deck plates 16, at least as part of the building of the power plant. The plant has the steel columns 12, the steel beams 13, deck bearing beams 14 for bearing the deck plates 16, intra-building equipment 24 set inside the building, and bearing members 17, 18, 19, 20, 21, 22 which bear the intra- building equipment 24. According to the method, the module structure 11 is mounted on a foundation or a lower-story floor of the building, and thereafter concrete 27 is poured around the steel columns 12 of the module structure 11.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了提供一种提高模块结构强度的发电厂施工方法,当工厂大型化时容易应对模块的重量增加或者将大量设备结合到工厂,允许将工厂建造 与各种类型的建筑结构相对应的各种模式,例如具有/不具有墙壁的建筑物,可以大量地模块化设置在工厂上方或下方的各种类型的设备,从而大大提高了将设备结合到建筑物中的可操作性, 等等,并提高了建筑物强度的可靠性。 解决方案:电厂建设方法可用于构建至少作为发电厂建筑物的一部分的由钢柱12,钢梁13和甲板板16形成的钢混凝土结构的发电厂。 该设备具有钢柱12,钢梁13,用于承载甲板板16的甲板承载梁14,设置在建筑物内部的建筑物内设备24以及承载构件17,18,19,20,21,22,承载构件17,18,19,20,21,22 建筑内设备24.根据该方法,模块结构11安装在建筑物的基础或下层楼层上,然后将混凝土27倾倒在模块结构11的钢柱12周围。