会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明专利
    • Constructive working device
    • 建筑工作装置
    • JPS59177426A
    • 1984-10-08
    • JP5147283
    • 1983-03-29
    • Shimizu Constr Co LtdTaisei CorpTobishima Kensetsu KkTokyo Kiyuukou Dentetsu KkTokyu Constr Co Ltd
    • ARAGAKI TATSUOSAKURAI HIRONOBUNAITOU TAKESHITANAKA YASUOTAKEMATA RIYOUZOU
    • E02D7/16
    • PURPOSE: To safely and quickly move a truck by a method in which an inside guide rail and an outside guide rail capable of turning and moving the truck are provided on a working stand, and an attachment leader is connected to a leader in a separable manner.
      CONSTITUTION: A portal working stand 1 runs on rails 3 laid on both sides of a line 2. An inside guide rail 4 and an outside guide rail 5 are laid concentrically on the central part of the stand 1, and a truck 6 is placed on the rails 4 and 5 and moved rotationally. A pile-driving tower consisting of a stay 7 and a leader 8 is provided to the truck 6, and an attachment leader 9 is connected to the lower part of the leader 8 in a separable manner at a connecting portion 10. The pile-driving tower is moved along the rails 4 and 5, the truck 6 is moved, the leader 8 is positioned right above the attachment leader 9 and connected at the connecting portion 10, and the driving work of pile is made.
      COPYRIGHT: (C)1984,JPO&Japio
    • 目的:通过在工作台上提供能够转动和移动卡车的内侧导轨和外部导轨的方法来安全快速地移动卡车,并且附件头部以可分离的方式连接到前导头 。 构成:入口工作台1在放置在管线2的两侧的轨道3上运行。内部导轨4和外部导轨5同心地放置在支架1的中心部分上,并且将卡车6放置在 轨道4和5并且旋转地移动。 由卡车6提供由起落架7和前导件8组成的打桩塔,并且连接头部9在连接部分10处以可分离的方式连接到引导件8的下部。打桩机 塔架沿着轨道4和5移动,卡车6移动,引导件8位于附接引导件9的正上方,并在连接部分10处连接,并且进行打桩作业。