会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Constructive working device
    • 建筑工作装置
    • JPS59177426A
    • 1984-10-08
    • JP5147283
    • 1983-03-29
    • Shimizu Constr Co LtdTaisei CorpTobishima Kensetsu KkTokyo Kiyuukou Dentetsu KkTokyu Constr Co Ltd
    • ARAGAKI TATSUOSAKURAI HIRONOBUNAITOU TAKESHITANAKA YASUOTAKEMATA RIYOUZOU
    • E02D7/16
    • PURPOSE: To safely and quickly move a truck by a method in which an inside guide rail and an outside guide rail capable of turning and moving the truck are provided on a working stand, and an attachment leader is connected to a leader in a separable manner.
      CONSTITUTION: A portal working stand 1 runs on rails 3 laid on both sides of a line 2. An inside guide rail 4 and an outside guide rail 5 are laid concentrically on the central part of the stand 1, and a truck 6 is placed on the rails 4 and 5 and moved rotationally. A pile-driving tower consisting of a stay 7 and a leader 8 is provided to the truck 6, and an attachment leader 9 is connected to the lower part of the leader 8 in a separable manner at a connecting portion 10. The pile-driving tower is moved along the rails 4 and 5, the truck 6 is moved, the leader 8 is positioned right above the attachment leader 9 and connected at the connecting portion 10, and the driving work of pile is made.
      COPYRIGHT: (C)1984,JPO&Japio
    • 目的:通过在工作台上提供能够转动和移动卡车的内侧导轨和外部导轨的方法来安全快速地移动卡车,并且附件头部以可分离的方式连接到前导头 。 构成:入口工作台1在放置在管线2的两侧的轨道3上运行。内部导轨4和外部导轨5同心地放置在支架1的中心部分上,并且将卡车6放置在 轨道4和5并且旋转地移动。 由卡车6提供由起落架7和前导件8组成的打桩塔,并且连接头部9在连接部分10处以可分离的方式连接到引导件8的下部。打桩机 塔架沿着轨道4和5移动,卡车6移动,引导件8位于附接引导件9的正上方,并在连接部分10处连接,并且进行打桩作业。
    • 5. 发明专利
    • Stringing temporary suspension device
    • 暂停暂停装置
    • JPS59149831A
    • 1984-08-27
    • JP2344583
    • 1983-02-15
    • Tokyu Constr Co Ltd
    • MIYAZAKI MANABUSAKURAI HIRONOBU
    • B60M1/20B60M1/28B61D15/00
    • B60M1/28
    • PURPOSE:To make a lifting beam travelable freely under the existing stringing suspension beam as well as to make engineering work performable safely and efficiently, by installing the lifting beam free of movement for an up-and-down motion, in the top of travelable symmetrical stanchions erected at both sides of a track. CONSTITUTION:Rotation in a motor 10 is transmitted to an intermediate shaft 6 via a reduction gear and further transmitted to a work shaft 13 via a chain 12. When the worm shaft 13 rotates, a worm wheel is driven into rotation as well, forcing out a screw shaft 16 downward. When he shaft 16 is pushed out downward, the side of a jack 14 is pushed upward as receiving reaction force out of a horizontal frame 18 where by a lifting beam 9 goes up. When the beam 9 is lifted up to a virtual line position, the motor 10 comes to a stop, while a solenoid 22 is also disconnected, causing a stopper 20 to be pushed downward by dint of a spring 21, and again the lower part engages with an engaging groove of a stopper wheel 19, locking the jack 14. Like this, not only stringing can be suspensibly installed at an optional position but also operations can be achieved in an effective manner.
    • 目的:使提升梁在现有的垂直悬挂梁下自由移动,并使工程工作安全有效地进行安装,通过安装提升梁无动作上下运动,在行驶对称的顶部 支柱竖立在轨道的两边。 构成:马达10中的旋转经由减速齿轮传递到中间轴6,并经由链条12传递到工作轴13.当蜗杆13旋转时,蜗轮也被驱动旋转,迫使 螺杆轴16向下。 当轴16被向下推出时,插座14的侧面被接收反作用力从水平框架18向上推动,其中提升梁9升高。 当梁9被提升到虚拟线位置时,电动机10停止,而螺线管22也断开,使得止动件20被弹簧21向下推动,并且下部接合 具有止动轮19的接合槽,锁定千斤顶14.类似地,不仅可以将挂绳悬挂地安装在可选位置,而且可以以有效的方式实现操作。