会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • Ground installed transformer device
    • 地面安装的变压器设备
    • JP2012033532A
    • 2012-02-16
    • JP2010169227
    • 2010-07-28
    • Daihen Corp株式会社ダイヘン
    • MATSUBA KENICHIAKIYAMA TOMOKAZUKURIYAMA TADASHI
    • H01F30/12H01F27/02
    • PROBLEM TO BE SOLVED: To provide a ground installed transformer device which saves the amount of insulating oil of a transformer.SOLUTION: In a ground installed transformer device, a three-phase fuse holder 9u or 9w is inserted through the upper part of a side plate of a transformer case 6 including a three-phase transformer main body 8 and insulating oil 7 into space above the oil level of the insulating oil 7 in the transformer case 6, a switchgear 2, which is positioned below the fuse holder 9u or 9w, is connected to the primary side of the transformer main body 8 through a high-voltage current-limiting fuse 12u or 12w in the fuse holder 9u or 9w and supported by the side plate of the transformer case 6, and the width dimension W1 of a part positioned below a part on which the three-phase fuse holder 9u or 9w of the transformer case 6 is installed is set smaller than the width dimension W2 of a part on which the three-phase fuse holder 9u or 9w is installed in a range so as not to affect securement of insulation distance to ground in the transformer main body 8.
    • 要解决的问题:提供一种可以节省变压器绝缘油量的地面安装的变压器装置。 解决方案:在地面安装的变压器装置中,三相熔断器保持架9u或9w通过包括三相变压器主体8和绝缘油7的变压器壳体6的侧板的上部插入, 位于变压器壳体6内的绝缘油7的油位以上的位置处,位于熔断器保持架9u,9w的下方的开关设备2通过高压电流互感器与变压器主体8的一次侧连接, 在熔断器保持器9u或9w中限制保险丝12u或12w并被变压器壳体6的侧板支撑,并且位于变压器的三相保险丝座9u或9w的部分下方的部分的宽度尺寸W1 安装壳体6的尺寸小于安装有三相熔断器保持器9u或9w的部件的宽度尺寸W2在不影响变压器主体8中的接地绝缘距离的固定的范围内。 P>版权所有(C)2012,JPO&INPIT
    • 5. 发明专利
    • Ground installed transformer device
    • 地面安装的变压器设备
    • JP2011172344A
    • 2011-09-01
    • JP2010032380
    • 2010-02-17
    • Daihen Corp株式会社ダイヘン
    • AKIYAMA TOMOKAZUMATSUBA KENICHIKURIYAMA TADASHI
    • H02B1/56H01F27/02H02B1/14
    • PROBLEM TO BE SOLVED: To prevent foreign matter from being inserted into the outer case through a gap between the louver boards in a ground installed transformer device having the louver in an air vent of the outer case.
      SOLUTION: First and second louver elements 21 and 21' with louver boards protruded downward obliquely from a surface are provided and the louver elements are mated back to back to construct a louver 20. The positions of the respective vent holes 21a and 21a' and louver boards 21b and 21b' of the first and second louver elements are vertically shifted from each other. As a result, the gaps G formed between adjacent louver boards of the first louver element 21 directed outward of the outer case are concealed from an electrical apparatus housed in the outer case by the louver boards of the second louver element 21'.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:为了防止异物通过在外壳的通风口中具有百叶窗的地面安装的变压器装置中的百叶板之间的间隙插入到外壳中。

      解决方案:设置有从表面倾斜向下突出的百叶板的第一和第二百叶窗元件21和21',并且百叶窗元件背靠背配合以构成百叶窗20.各通气孔21a和21a的位置 并且第一和第二百叶窗元件的百叶窗板21b和21b'彼此垂直地移动。 其结果是,通过第二百叶窗元件21'的百叶窗板,从位于外壳的外侧的第一百叶窗元件21的相邻的百叶板之间形成的间隙G被从第二百叶窗元件21'的百叶板所容纳在外壳中的电气设备中隐藏。 版权所有(C)2011,JPO&INPIT

    • 6. 发明专利
    • Switch-contained pole-mounted oil transformer
    • 开关式安装式油压变压器
    • JP2003022915A
    • 2003-01-24
    • JP2001209744
    • 2001-07-10
    • Daihen CorpKansai Electric Power Co Inc:The株式会社ダイヘン関西電力株式会社
    • TAKEUCHI AKIOMATSUBAYASHI TADAKIKURIYAMA TADASHIOISHI MASANORI
    • H01F27/02
    • PROBLEM TO BE SOLVED: To obtain a pole-mounted oil transformer containing a switch, capable of avoiding congestion of apparatus on an electric pole.
      SOLUTION: A transformer body 7 having transformer coils 7U-7W is housed in the bottom of a transformer case 6, together with an insulation oil 8, and a switch 14 is housed in an upper space 13 of the case 6. A partition wall 15 for partitioning the oil 8 and the switch 14 is provided on the surface 8a of the insulation oil 8 so as to be deformed due to a rapid pressure rise in a short- circuit trouble in the case 6, thereby allowing the pressure to rise toward the switch 14. The upper part of the case 6 is structured to form an opening for discharging out the rising pressure toward the switch 14 against a rapid pressure rise in the short-circuit trouble in the case 6.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了获得一种能够避免电杆装置堵塞的带有开关的极安装油变压器。 解决方案:具有变压器线圈7U-7W的变压器体7与绝缘油8一起容纳在变压器壳体6的底部,并且开关14容纳在壳体6的上部空间13中。分隔壁15 为了分隔油8,开关14设置在绝缘油8的表面8a上,以便由于壳体6中的短路故障中的快速压力上升而变形,从而允许压力朝向 开关14.壳体6的上部构造成形成用于在壳体6的短路故障中抵抗快速升压而向开关14排出上升压力的开口。
    • 7. 发明专利
    • Ground installation type transformer device
    • 地面安装式变压器装置
    • JP2012151201A
    • 2012-08-09
    • JP2011007569
    • 2011-01-18
    • Daihen Corp株式会社ダイヘン
    • AKIYAMA TOMOKAZUMATSUBA KENICHIKURIYAMA TADASHI
    • H01F27/04
    • PROBLEM TO BE SOLVED: To prevent the temperature of a packing provided to a connection part between a transformer tank of a ground installation type transformer device and a primary side switchgear (LBS), from rising to be degraded in an early stage.SOLUTION: A bushing fitting part 201b2 provided to a switch case 201 of the LBS is connected to a side wall 6b1 of a transformer tank 6 with a packing 16 in between. Primary bushing terminals 14u-14w fitted to the bushing fitting part are guided into the transformer tank 6 by way of a bushing guiding-in window part 6h provided to the side wall 6b1. A heat insulating plate 21 that covers the peripheral part of the window part 6h is arranged inside the transformer tank 6, to suppress rising of temperature of the packing 16. A portion of an oil penetration part of the primary bushing terminals 14u-14w which is closer to the LBS is taken as an isolation object part 14B1. A bushing terminal isolation part 25 is provided to isolate the isolation object part from the convection of insulating oil 7 that occurs in the transformer tank. The insulating oil is suppressed from heating the primary bushing terminal, so as to suppress rising of temperature of the packing 16.
    • 要解决的问题:为了防止设置在地面安装型变压器装置的变压器箱和初级侧开关装置(LBS)的连接部分的填料的温度从早期升高到降低。 解决方案:设置在LBS的开关壳体201上的衬套配合部201b2与变压器箱6的侧壁6b1连接,其间具有衬垫16。 通过设置在侧壁6b1上的衬套导入窗口部6h将安装在衬套安装部上的主衬套端子14u-14w引导到变压器箱6中。 覆盖窗部6h的周缘部的绝热板21配置在变压器箱6的内部,以抑制密封件16的温度上升。主衬套端子14u-14w的油贯入部的一部分 更靠近LBS被作为隔离对象部分14B1。 设置衬套端子隔离部分25以将隔离物体部分与变压器箱中发生的绝缘油7的对流隔离。 抑制绝缘油加热初级衬套端子,以抑制密封件16的温度上升。版权所有(C)2012,JPO&INPIT