    • 6. 发明专利
    • WATERPROOF CONSTRUCTION METHOD
    • JPH02132299A
    • 1990-05-21
    • JP28839488
    • 1988-11-14
    • TOKAI RUBBER IND LTDNISSO SHOJI KK
    • UDA SHINYAKATOU YOSHIKI
    • E21D11/38
    • PURPOSE:To contrive the reduction of cost facilitating execution while preventing the leakage of water by providing an elastic plateshaped unit to be arranged in a concrete internal wall surface further a securing tool to be driven closely adhering. CONSTITUTION:A waterproof layer 10 of deterioration part of a conduit is removed from inside a stratum 8, and a concrete layer 9 is exposed. Next matching with a circumferential length of the internal peripheral surface of the concrete layer 9, a polyvinyl chloride-made elastic plate 10a is cut, rounded, curved so as to be along the internal peripheral surface and internally fitted into the concrete layer 9. And next utilizing repulsive elasticity of the plate 10a, it is closely attached to the internal peripheral surface of the concrete layer 9. A nail 14 is driven by a pneumatic nailing gun to one end part side in the upper end of the elastic plate 10a through a rubber packing 12 and a retaining washer 13, and the plate 10a is fixed to an upper end of the concrete layer 9 while thermally fused by a hot metal system adhesive agent.
    • 7. 发明专利
    • WATER-PROOF TREATMENT OF TUNNEL
    • JPH02153199A
    • 1990-06-12
    • JP30847288
    • 1988-12-06
    • NISSO SHOJI KK
    • KATOU YOSHIKI
    • E02D31/02E21D11/10E21D11/38
    • PURPOSE:To make a tunnel waterproof by forming a water-proofing layer of a synthetic resin board, synthetic rubber board, metal board and others all having impact resiliency on the surface of an excavated rock, and infiltrating a hardening filler between a bedrock and the water-proofing layer to carry out back-filling. CONSTITUTION:A board with impact resiliency or a synthetic resin board, synthetic rubber board, fiber reinforcing resin board, metal board and others are stuck on the wall of a bedrock of a drift constructed by excavating the ground in a state of watertightness by using a machine and the pressure of a jig. Thus, water-proofing boards 3 are subsequently stuck lengthwise of a tunnel up to an appropriate length in the shape of an arch for placing one time of lining concrete. Concrete, gravel, crushed stone or muck are filled the space between the bedrock 1 and water-proofing boards 3, and cement milk, epoxy resin, urethane resin and the like as an bonding agent is infiltrated later on to carry out back-filling.