会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Earthquake strengthening structure of existing building
    • 地震强化现有建筑结构
    • JP2013023837A
    • 2013-02-04
    • JP2011157110
    • 2011-07-15
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YAMANE KAZUMISERIZAWA YOSHINORIKATAYAMA TAKESHISHIMANO YUKIHIRONISHIO KAZUYAMATSUBARA YOSHINORI
    • E04G23/02
    • PROBLEM TO BE SOLVED: To provide an earthquake strengthening structure of an existing building for improving an aseismatic performance of the existing building by resisting relatively light horizontal force by proof strength of the existing building itself and burdening the earthquake strengthening structure constructed with a fixed gap on the outer periphery of the existing building with large horizontal force exceeding the proof strength, when the horizontal force by an earthquake or the like acts on the existing building.SOLUTION: A reinforcing outer shell frame 3 configured by combining a horizontal member 4 and a column member 5 is arranged along two outer peripheral surfaces in parallel in one direction of the outer periphery of an existing building 1, and is constructed with a fixed gap from the existing building 1. The reinforcing outer shell frames 3, 3 are arranged along the other two outer peripheral surfaces in parallel of the existing building 1 and connected by horizontal members 6, 6 installed with a fixed gap from the existing building 1.
    • 要解决的问题:提供现有建筑物的抗震结构,通过抵抗现有建筑物本身的抗震强度抵抗现有建筑物的抗震性能,并加强由 当现有建筑物的水平力受地震等作用于现有建筑物的外围时,具有大的水平力超过验证强度的固定间隙。 解决方案:通过组合水平构件4和柱构件5构成的加强外壳框架3沿着沿现有建筑物1的外周的一个方向平行的两个外周面布置,并且构造为 与现有建筑物1的固定间隙1.加固外壳框架3沿着与现有建筑物1平行的另外两个外周表面布置,并与从现有建筑物1安装有固定间隙的水平构件6,6连接 。版权所有(C)2013,JPO&INPIT
    • 3. 发明专利
    • Bearing ground improvement method
    • 轴承改进方法
    • JP2009102952A
    • 2009-05-14
    • JP2007278002
    • 2007-10-25
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • SAKURAGAWA NORIOKONO TAKASHIYAMANE KAZUMIKUWABARA MARIKOOKUNO YUICHIRO
    • E02D3/12
    • PROBLEM TO BE SOLVED: To reduce a construction period by reducing construction time and labor and to carry out ground improvement work in a small construction space.
      SOLUTION: This bearing ground improvement method for improving the ground by putting an improving material 7 in the soft ground G0 located directly under a building with a foundation part constituted directly of a foundation, comprises carrying out agitation and mixing while excavating the soft ground G0 by a digger 5 from the ground part to a predetermined depth over the whole building range area of the building, and discharging the slurry improving material 7 into the ground when excavating the ground, to integrate the slurry improving material 7 with soil 8 in the soft ground G0 to form an improved bearing ground layer G.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:通过减少施工时间和人力,在小型施工空间进行地面改造工程,缩短施工期限。 解决方案:通过将直接由基础构成的基础部件直接放置在建筑物的正下方的软土地面G0内,将改善材料7进行改善的地面改进方法,包括在挖掘软化物的同时进行搅拌和混合 将地面G0由挖掘机5从建筑物的整个建筑物区域的地面部分延伸至预定深度,并且当挖掘地面时将浆料改进材料7排放到地面中,以将浆料改进材料7与土壤8一体化 软地G0形成改进的承载地层G.版权所有(C)2009,JPO&INPIT
    • 5. 发明专利
    • Construction noise masking facility and construction noise masking method
    • 施工噪声掩蔽设施和施工噪声掩蔽方法
    • JP2012247698A
    • 2012-12-13
    • JP2011120741
    • 2011-05-30
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • MATSUBARA YOSHINORINISHIO KAZUYASERIZAWA YOSHINORIYAMANE KAZUMIIWAMOTO TAKUMAARAKI KUNIHIKONAGANO TAKESHI
    • G10K11/178
    • PROBLEM TO BE SOLVED: To provide construction noise masking facilities which are adapted to masking of building construction noise and easily follow up movement of a construction area.SOLUTION: There are provided the construction noise masking facilities which reproduce a masking sound for masking building construction noise in a room R so as to reduce building construction noise that a person in the room R feels in an object building B including a construction area K where the building construction noise is generated and a plurality of rooms R nearby the construction area K. The construction noise masking facilities are equipped with a plurality of reproduction devices 1 which can be installed in the plurality of rooms R respectively and removed, and a transmission device 3 which transmits signal data 2 to the reproduction devices 1 so as to generate masking sounds corresponding to building construction noise in the rooms R.
    • 要解决的问题:提供适于掩蔽建筑物噪声并容易跟随建筑区域的运动的施工噪声掩蔽设施。 解决方案:提供了建筑噪声掩蔽设施,其再现用于掩蔽房间R中的建筑施工噪声的掩蔽声音,以便减少房屋R中的人在建筑物B中感觉到的建筑噪声,包括建筑物 产生建筑施工噪声的区域K和施工区域K附近的多个房间R.施工噪声掩蔽设施配备有可以分别安装在多个房间R中并被去除的多个再现设备1,以及 发送装置3,其将信号数据2发送到再现装置1,以便产生对应于房间R中的建筑物噪声的屏蔽声音。(C)2013,JPO&INPIT
    • 6. 发明专利
    • Method of constructing outer peripheral column by inverted construction method
    • 通过反向构造方法构造外部外柱的方法
    • JP2007308951A
    • 2007-11-29
    • JP2006138522
    • 2006-05-18
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YAMAMOTO SHUNJIYAMANE KAZUMI
    • E02D29/045E02D5/20E21D13/00
    • PROBLEM TO BE SOLVED: To improve construction efficiency by eliminating the steps of lifting steel frames for outer peripheral columns and welding operations at site where the steel frames are joined to the steel frames for cores in a method of constructing the outer peripheral columns by an inverted construction method in which the outer peripheral columns of the building are formed integrally with an earth retaining wall capable of supporting the axial force and the axial force is transmitted to the earth retaining wall.
      SOLUTION: When a soil pile column-row earth retaining wall A is constructed, a soil pipe column row 2 for constructing outer peripheral columns projecting inward from the soil pile column row 1 is constructed at the position where the outer peripheral columns are to be constructed. Before a soil cement is not yet solidified, steel frame units U formed by integrating the steel frame 3 for core with the steel frame 4 for outer peripheral column through a steel frame 5 for connection are so inserted into both soil soil pile column rows 1, 2 that the steel frames for cores can be buried in the soil pile column row 1 and the steel frames for outer peripheral columns can be buried in the soil pile column row 2. After the soil cement is solidified, the ground is excavated to expose the steel frames for outer peripheral columns, and the outer peripheral columns under the ground are constructed while transmitting the axial force acting on the outer peripheral columns to the earth retaining wall.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了提高施工效率,通过在构造外周柱的方法中消除了将外框的钢框架和钢框架接合到钢框架的位置处的焊接操作的步骤 通过一种反向构造方法,其中建筑物的外周列与能够支撑轴向力的地挡土墙一体地形成,并且轴向力被传递到挡土墙。

      解决方案:在构造土桩列排土挡土墙A的过程中,在外围栏位的位置上,构成用于构成从桩桩列1向内突出的外周列的土管柱列2。 待建 在土壤水泥尚未固化之前,将用于芯部的钢框架3与用于连接的钢框架5一体化的钢框架4用于外周柱的钢框架单元U插入两个土壤桩柱列1, 2铁芯钢框架可以埋在土桩柱1中,外围柱钢框架可以埋在土桩柱2中。土壤水泥固化后,挖掘地面露出 在外围柱的钢框架和地面下的外周柱构造,同时将作用在外周柱上的轴向力传递到挡土墙。 版权所有(C)2008,JPO&INPIT

    • 8. 发明专利
    • Column-beam joint method and column-beam joint structure
    • 柱梁接头方法和柱梁接头结构
    • JP2009091844A
    • 2009-04-30
    • JP2007264680
    • 2007-10-10
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • YAMANE KAZUMI
    • E04B1/21E04B1/58E04G23/02
    • PROBLEM TO BE SOLVED: To provide a column-beam joint method wherein the size of a steel reinforced concrete beam constructed as an extension is prevented from being increased more than necessary. SOLUTION: The column-beam joint method is applied for connecting an additional steel reinforced concrete beam 2 to an existing steel reinforced concrete column 1, and comprises the steps of installing a plurality post-construction anchors 3 to the steel reinforced concrete column 1 and integrally connecting main reinforcements 4 and the post-construction anchors 3 with a joining member 5 capable of fixing the post-construction anchors 3 and a plurality of the main reinforcements 4 installed in the steel reinforced concrete beams 2. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种柱梁接头方法,其中防止被构造为延伸部的钢筋混凝土梁的尺寸超过必要的增加。

      解决方案:采用柱梁接头法将钢筋混凝土梁2连接到现有的钢筋混凝土柱1上,包括以下步骤:将多个后施工锚固件3安装到钢筋混凝土柱 1并且通过能够固定后施工锚固件3的接合构件5和安装在钢筋混凝土梁2中的多个主加强件4将主加强件4和后施工锚固件3整体连接。版权所有: (C)2009,JPO&INPIT

    • 10. 发明专利
    • BASE ISOLATION BUILDING
    • JP2001199652A
    • 2001-07-24
    • JP2000010730
    • 2000-01-19
    • TAKENAKA KOMUTEN CO
    • KUSAKABE KAZUICHIYOSHIMURA TAKESHITOYONAGA HIDEOYAMANE KAZUMI
    • E04H9/02B66B7/02
    • PROBLEM TO BE SOLVED: To speedily construct a building with intermediate base isolation where the up-and-down movement of an elevator is hardly affected by the rolling of a building, without spending much time. SOLUTION: In this base isolation building composed of a lower structural part B1 and an upper structural part B2 relatively laterally movable to each other through a base isolation device M, and provided with a hoistway 4 of the elevator 3 continuously formed over the lower structural part B1 and the upper structural part B2, and a supporting frame 8 for supporting an elevator rail 6 at least on a story where the base isolation device M is installed in the hoistway 4, in a state that it is over the lower structural part B1 and the upper structural part B2, connecting parts of upper and lower ends of the supporting frame 8 with the lower structural part B1 and the upper structural part B2 are respectively bendable connecting parts 9 where the supporting frame 8 is rockably mounted to the lower structural part B1 and the upper structural part B2, and the elevator rail 6 is horizontally movably supported to the supporting frame 8.