    • MANUFACTURE OF UNDERGROUND STRUCTURE
    • JPH08158385A
    • 1996-06-18
    • JP30051594
    • 1994-12-05
    • TAKENAKA KOMUTEN CO
    • MITOMA TAKAFUMIHASHIMOTO HIROYUKINAGANO AKIRAOSADA SHOSAKU
    • E02D17/04E02D29/045E21D13/00
    • PURPOSE: To shorten the term of works and reduce the cost by obviating the need for the temporary works for struts for landslide-protection wall timbering, and simplifying the temporary works while conducting the landslide-protection wall timbering required at the time of excavation. CONSTITUTION: Landslide-protection walls 2 and framed studs 4 are prepared in the ground, and a structure A with foundation bodies F and lowermost stage floor bodies FL is prepared onto the ground under the state as struts to the landslide-protection walls. A reverse driving process consisting of excavation work, in which the lower side of the structure A is excavated under the state, in which the structure A is borne to the framed studs 4, lowering work, in which the structure A is lowered and placed to an excavating trace, and a floor-body preparation work, in which floor bodies are prepared under the state, in which the floor bodies are borne to sections upper than the structure A in the framed studs 4, is repeated at specified times. The floor bodies in each stair are prepared in order from the upper floor bodies while the structure A is installed at a specified level.
    • 5. 发明专利
    • CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE
    • JPH08134942A
    • 1996-05-28
    • JP28014294
    • 1994-11-15
    • TAKENAKA KOMUTEN CO
    • MATSUI OSAMUHASHIMOTO HIROYUKIMITOMA TAKAFUMIOSADA SHOSAKU
    • E02D29/045E21D13/00
    • PURPOSE: To shorten a construction term until a final excavation work has been over by constructing earth retaining walls around an existing underground structure, and letting excavation for constructing a new underground structure be then completed before the aforesaid existing underground structure is disassembled and removed. CONSTITUTION: Earth retaining walls 3 and 3 having each depth corresponding to the depth of a new underground structure, which is deeper than that of an existing underground structure, is constructed around the existing underground structure. The uppermost structural section 1B1 of the existing underground structure 1 is then disassembled and removed, and the uppermost floor skeleton F of the new underground structure is then constructed. The remaining section 1A of the existing underground structure 1 is made struts for each earth retaining wall 3, and excavation for the new underground structure is then executed at the under side of the existing underground structure 1. Subsequently, each structure located underneath the existing underground structure 1 out of the floor skeleton F of the new underground structure is constructed one after another from its upper floor by a reverse placing method. The existing underground structure 1 is disassembled and removed in order from its upper section, and the remaining floor skeleton F of the new underground structure is then constructed in order from its upper section by a reverse placing method as the aforesaid operations are carried out.
    • 6. 发明专利
    • MULTIPLE SHAFT SOIL AUGER
    • JPH05106219A
    • 1993-04-27
    • JP27059691
    • 1991-10-18
    • TAKENAKA KOMUTEN CO
    • TANIGUCHI SATORUYAHAGI TAKAOHASHIMOTO HIROYUKIFURUKAWA YUKITAKAMATSUOKA NOBUHIROKITAMURA TOSHINAO
    • E02D5/18E02D17/13E02F5/02
    • PURPOSE:To prevent soil columns from being positionally shifted from a forming estimation face, and improve precision for forming the columns by providing a rotary bearing for connecting a section near the lower end of an auger rod, with stabilizers to be pushed against a hole boring wall with a rotational force. CONSTITUTION:Five auger rods 3 are parallel-connected to each other in a positioned state, and a multiple shaft soil auger machine 2 provided with a driving gear 4 for rotating the auger rods 3, set on the upper sections of the rods 3, is fitted to be moved up and down on a tower 1. Besides, on the rotating directions of the augers 3, both the end augers are rotated in the same direction, and the central three augers are rotated in the same direction, and said two augers are rotated in the counter direction, and on connecting bearings 5 for connecting sections near the lower ends of the group of the auger rods 3, rotational. torsion suppressing stabilizers 6 to be pushed against hole boring walls W with a rotational force due to a rotational reaction force are fitted. Then, soil columns are prevented from being positionally shifted from a forming estimation face, and the soil columns are formed at high precision. Besides, the meters of a load meter, a speed meter, a depth gauge, an inclinometer, and the like are arranged, and hole boring excavation precision can be enhanced.
    • 8. 发明专利
    • Construction of basement
    • 地基建设
    • JPS61109827A
    • 1986-05-28
    • JP22999984
    • 1984-10-31
    • Takenaka Komuten Co Ltd
    • MATSUDA MUNEOOKADA MASANORIHASHIMOTO HIROYUKITANIGUCHI SATOSHI
    • E02D29/045E21D13/00E02D29/04
    • E02D29/045
    • PURPOSE:To shorten the period of construction as well as reduce the cost of construction for basement by a method in which underground columns are constructed, a formwork is hung down and fixed through a hanging mechanism, concrete is placed, the ground below the formwork is excavated, and the hanging mechanism is extended to the next underground stage. CONSTITUTION:Plural underground columns 4 are constructed, and a formwork 10 for the first floor under the ground is hung down and fixed through a hang ing mechanism H from the columns 4. Concrete is placed into the formwork 10, and the ground below the formwork 10 is excavated. The mechanism H is then extended to the next underground floor, the formwork 10 for the floor is hung down and fixed, and concrete is placed into the formwork 10. These processes are repeated to construct plural underground floors in order from above to below. The period of construction can thus be greatly shortened, and assembling and disassembling operations for formworks and timbering work in places where working conditions are bad can be lessened.
    • 目的:通过建造地下柱的方法缩短施工期,降低地下室施工成本,通过悬挂机构将模板悬挂固定,混凝土放置,模板下方的地面为 挖掘,悬挂机构延伸到下一个地下阶段。 构成:多层地下柱4被构造,地面下一层的模板10被悬挂下来并通过悬挂机构H从柱4固定。混凝土被放置在模板10中,模板下面的地面 10挖掘。 然后将机构H延伸到下一个地下楼层,地板的模板10被挂起并固定,混凝土被放置在模板10中。重复这些过程以从上到下构造多个地下楼层。 因此可以大大缩短施工期间,可以减少在工作条件恶劣的地方进行装配和木材加工的组装和拆卸作业。
    • 10. 发明专利
    • REBUILDING METHOD FOR BUILDING
    • JPH11148235A
    • 1999-06-02
    • JP31366697
    • 1997-11-14
    • TAKENAKA KOMUTEN CO
    • OSADA SHOSAKUHASHIMOTO HIROYUKIMATSUOKA SHINJIKURITA YOSHIHIKOOKUMOTO HIDEFUMIAOKI KAZUO
    • E04G23/06
    • PROBLEM TO BE SOLVED: To efficiently rebuild an undeground structural part by integratedly installing steel column through a floor structural part of the underground structural part, functioning the floor structural part as a shore strut, and successively achieving the rebuilding from the prescribed underground floor. SOLUTION: A steel column 4 is installed through a floor structural part 7 of an underground structural part A1, the steel column 4 is integrated with the floor structural part 7, and the rebuilding is successively achieved from the prescribed underground floor part in a condition where the floor structural part functions as a shore strut H. A part of a waste concrete 11 generated in demolishing an existing building A is filled in a pit part 9, and the concrete K is filled in cavities for integration. Reinforcements are installed on an upper part, the concrete K is placed thereon to form a new foundation structural part 3c integrated with the existing foundation structural part 3. In a stand pipe 12, only a pipe body 13 located on a lower end part is embedded, and a plurality of rest of pipe bodies 13 are erected through a connection part 14 after the embedded pipe body 13 is stably supported.