    • 4. 发明专利
    • Underground structure
    • 地下结构
    • JP2012162891A
    • 2012-08-30
    • JP2011022980
    • 2011-02-04
    • Taisei Corp大成建設株式会社
    • NAKAMARU SOICHIROTAGUCHI RYUJIOISHI NORIHIROMURAKAMI TATSUYAHIDAKA NAOTOSHIYAMAMOTO RYOTAOZEKI TAKAHITOFUKUDA TAKAMASA
    • E21D13/00E21D11/04E21D11/10
    • PROBLEM TO BE SOLVED: To provide an underground structure which is constructed with a steel shell skeleton and a reinforced concrete beam combined to achieve a shorter construction period and a lower construction cost.SOLUTION: The underground structure includes the steel shell skeleton B formed by connecting a plurality of steel segments 20 in the longitudinal direction, and the reinforced concrete beam C formed on the inner face of the steel shell skeleton B along the longitudinal direction, the plurality of steel segments 20 being joined together so that their vertical ribs 24 form a continuous structural member in the longitudinal direction, the reinforced concrete beam C having an embedded part C1 inserted into the steel shell skeleton B and a protruded part C2 protruded from the steel shell skeleton B, the reinforced concrete beam C having main reinforcements 61 arranged only on the protruded part C2.
    • 要解决的问题:提供一种由钢壳骨架和钢筋混凝土梁构成的地下结构,结合了较短的施工周期和较低的施工成本。 解决方案:地下结构包括沿着纵向方向连接多个钢段20而形成的钢壳骨架B以及沿着纵向方向形成在钢壳骨架B的内表面上的钢筋混凝土梁C, 多个钢段20连接在一起,使得它们的纵向肋24在纵向方向上形成连续的结构构件,钢筋混凝土梁C具有插入到钢壳骨架B中的嵌入部分C1和从其中突出的突出部分C2 钢壳骨架B,钢筋混凝土梁C,其主要加强件61仅布置在突出部分C2上。 版权所有(C)2012,JPO&INPIT
    • 5. 发明专利
    • Water stop device
    • 防水装置
    • JP2011246969A
    • 2011-12-08
    • JP2010121185
    • 2010-05-27
    • Taisei Corp大成建設株式会社
    • SEKINE KEISUKETAGUCHI RYUJIOISHI NORIHIROHIDAKA NAOTOSHI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a water stop device which allows water cutoff of an arrival pit mouth to be easily performed even if a jacking machine produces a construction error.SOLUTION: A water stop device 1 is formed at an arrival pit mouth 3 of a jacking machine, and comprises a cylindrical body part 11, an annular seal member 12 circumferentially provided on the outer periphery of a pushing tube behind the jacking machine, a support ring 13 for supporting the seal member 12, and a lid member 14 attached to an opening on the natural ground side of the body part 11. The support ring is disposed so as to be vertically and horizontally movable inside the body part 11.
    • 要解决的问题:即使起重机产生结构误差,也可以容易地进行允许到达坑口的水切断的止水装置。 解决方案:在起重机的到达坑口3处形成止水装置1,其包括圆柱形主体部11,周向地设置在顶起机后面的推动管的外周上的环形密封构件12 ,用于支撑密封构件12的支撑环13,以及附接到主体部分11的自然地面上的开口的盖构件14.支撑环设置成在主体部11内垂直和水平移动 (C)2012年,JPO&INPIT
    • 7. 发明专利
    • SHIELD MACHINE AND SHIELD TUNNEL CONSTRUCTING METHOD
    • JP2001107683A
    • 2001-04-17
    • JP29023299
    • 1999-10-12
    • TAISEI CORP
    • KANEKO KENICHIHASHIMOTO ISAOYUGUCHI MASAKITAGUCHI RYUJI
    • E21D9/06
    • PROBLEM TO BE SOLVED: To provide a shield machine which can be recovered from a dead end shield tunnel, and to provide a shield tunnel constructing method which can recover the shield machine from the dead end shield tunnel. SOLUTION: There is provided a shield machine having a rectangular cross section, which is divided by two surfaces in parallel with an advancing direction and with each other, and therefore constituted of four divided bodies each including a corner portion. There is also provided a shield tunnel constructing method by using the shield machine. According to the method, the shield machine with the four divided bodies being assembled, is advanced, and segments are framed in a space bored by the machine, to construct a shield tunnel. Thereafter, the shield machine is frontward extruded from the shield tunnel, and the divided bodies at opposite locations are housed inside the shield machine, whereby the shield machine with a reduced outside shape is constituted of the remaining divided bodies. Then, the reduced shield machine is removed through the interior of the shield tunnel, and a filler is filled in a bottom of a space after the removal of the shield machine, followed by framing the segments to construct the end of the tunnel.
    • 9. 发明专利
    • Construction method for underground structure, and pile head structure of temporary intermediate pile
    • 地下结构的施工方法和临时中间桩的桩头结构
    • JP2012211439A
    • 2012-11-01
    • JP2011076718
    • 2011-03-30
    • Taisei Corp大成建設株式会社
    • NAKAMARU SOICHIROTAGUCHI RYUJIOISHI NORIHIROMURAKAMI TATSUYAHIDAKA NAOTOSHIYAMAMOTO RYOTAOZEKI TAKAHITO
    • E02D29/045E21D13/00
    • PROBLEM TO BE SOLVED: To provide a construction method for an underground structure, which can shorten a construction period when the underground structure is constructed by an inverted lining method, and a pile head structure of a temporary intermediate pile.SOLUTION: A construction method for an underground structure comprises: a pile arrangement step of arranging a temporary intermediate pile M in the ground; a first skeleton construction step of forming a first skeleton A above the temporary intermediate pile M; an excavation step of digging down the ground on the downside of the first skeleton A; a second skeleton construction step of forming a second skeleton B on the downside of the first skeleton A; and a third skeleton construction step of forming an intermediate wall C between the first and second skeletons A and B. In the third skeleton construction step, the intermediate wall C is formed in the state of winding in the temporary intermediate pile M.
    • 要解决的问题:提供一种地下结构的施工方法,其可以缩短地下结构通过倒置法施工的施工期,以及临时中间桩的桩头结构。 解决方案:一种用于地下结构的施工方法,包括:将临时中间桩M布置在地面中的桩布置步骤; 形成临时中间桩M上方的第一骨架A的第一骨架构造工序; 挖掘第一骨架A的下方的地面的挖掘步骤; 在第一骨架A的下侧形成第二骨架B的第二骨架构造工序; 以及在第一和第二骨架A和B之间形成中间壁C的第三骨架构造步骤。在第三骨架构造工序中,中间壁C形成为在临时中间桩M中卷绕的状态。 版权所有(C)2013,JPO&INPIT
    • 10. 发明专利
    • Underground structure and construction method of underground structure
    • 地下结构的地下结构与施工方法
    • JP2012172483A
    • 2012-09-10
    • JP2011038336
    • 2011-02-24
    • Taisei Corp大成建設株式会社
    • NAKAMARU SOICHIROTAGUCHI RYUJIOISHI NORIHIROMURAKAMI TATSUYAHIDAKA NAOTOSHIOKAJIMA KAZUYOSHIOKUDA YUTAKAFUKUDA TAKAMASA
    • E21D13/02E21D11/10E21D11/14
    • PROBLEM TO BE SOLVED: To provide an underground structure and a construction method of the underground structure, in which a steel shell skeleton and a concrete skeleton can be easily joined to each other.SOLUTION: An underground structure 1 comprises: steel shell skeletons 10 each formed by connecting a plurality of segment pieces 11, 11, ... with each other; concrete skeletons 20 each formed on an outer side of the steel shell skeleton 10; and joint pieces 30 each joined to a joint 40 provided in the steel shell skeleton 10. The joint 40 is provided with a through-hole formed in the segment piece 11 and connection ribs arranged upright on both sides of the through-hole and sandwiching it, and the joint piece 30 includes an embedment beam penetrating through the through-hole and embedded in the concrete skeleton 20 and a base end plate having an outer shape larger than that of the through-hole and fixed to the connection rib.
    • 要解决的问题:提供一种地下结构的地下结构和施工方法,其中钢壳骨架和混凝土骨架可以彼此容易地接合。 解决方案:地下结构1包括:钢壳骨架10,每个钢壳骨架10通过将多个段片11,11彼此连接而形成; 每个形成在钢壳骨架10的外侧上的混凝土骨架20; 以及接合件30,其各自与设置在钢壳骨架10中的接头40接合。接头40设置有形成在分段件11中的通孔和在通孔的两侧竖立设置的连接肋并将其夹在中间 接头片30包括穿透通孔嵌入混凝土框架20的嵌入梁和具有比通孔大的外形的基端板,并固定在连接肋上。 版权所有(C)2012,JPO&INPIT