会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Stress test fixture and stress test method
    • 应力测试和应力测试方法
    • JP2008241530A
    • 2008-10-09
    • JP2007083984
    • 2007-03-28
    • Sumitomo Metal Ind Ltd住友金属工業株式会社
    • HIGUCHI KEIJISHIMOMOTO TOSHIKI
    • G01N3/08G01N3/32
    • G01N3/08G01N3/32G01N2203/0017G01N2203/0019
    • PROBLEM TO BE SOLVED: To provide a stress test fixture for preventing a test piece from being buckled in a tensile and compression stress test, and a tensile and compression stress test method using it.
      SOLUTION: In the stress test fixture provided with two flanges having respective recesses for holding an end of the test piece, the test piece is loaded with a compression stress or a tensile stress by applying the compression stress or the tensile stress to the test piece from one or both of the flanges, and at least two guide materials are installed in the direction parallel to the direction of the stress load applied to the test piece as to always match the direction of the stress load applied to the test piece with the longitudinal direction of the test piece during the stress test. The stress test method implements one or two or more compression tests or tensile tests for applying a distortion of 1.5% or more to the test piece.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种用于防止试件在拉伸和压缩应力试验中被弯曲的应力测试夹具以及使用它的拉伸和压缩应力试验方法。 解决方案:在具有两个具有用于保持试件末端的凹部的凸缘的应力测试夹具中,通过将压缩应力或拉伸应力施加到试验片上来加载压缩应力或拉伸应力 一个或两个凸缘的测试件,并且至少两个引导材料沿着平行于施加到测试件的应力负载的方向的方向安装,以使得总是与施加到测试件上的应力负荷的方向一致, 在应力测试期间试件的纵向方向。 应力测试方法实施一次或两次以上的压缩试验或拉伸试验,以对试样施加1.5%以上的变形。 版权所有(C)2009,JPO&INPIT
    • 2. 发明专利
    • Steel tube for low yield ratio column for building and steel plate used for this, and manufacturing method therefor
    • 用于这种建筑和钢板的低屈服比例的钢管及其制造方法
    • JP2008303465A
    • 2008-12-18
    • JP2008179966
    • 2008-07-10
    • Sumitomo Metal Ind Ltd住友金属工業株式会社
    • HASEGAWA KAZUHIKOHIRANO KOICHISHIMOMOTO TOSHIKI
    • C21D8/02B21C37/08C21D8/10C21D9/08C22C38/00C22C38/58
    • PROBLEM TO BE SOLVED: To obtain a steel tube excellent in economy and shocking characteristics, in the case of making the steel tube for low yield ratio column for building by cold-forming an extremely thick steel plate having ≥40 mm plate thickness.
      SOLUTION: The manufacturing method includes: heating a rolling stock; hot-rolling it; then subjecting the hot-rolled steel plate to any one of heat treatments shown in the followings (1) to (3); manufacturing a steel plate without performing subsequent heat treatment; subsequently cold-forming it into the steel pipe; then holding it at 400 to 650°C which are lower than the Ac
      1 transformation temperature, for at least five minutes; and then cooling it at a cooling rate of 10°C/second or less. The heat treatments includes: (1) after rolling, directly quenching the rolled plate from an Ar
      3 temperature or lower to ≤400°C; (2) after the rolling, directly quenching the rolled plate from a temperature of Ar
      3 +50°C or lower to ≤400°C, further reheating it, and quenching it at a temperature between Ac
      1 to Ac
      3 ; and (3) after the rolling, air-cooling the rolled plate, further reheating it, then quenching it at a temperature of Ar
      3 or higher, further reheating it, and then quenching it at a temperature between Ac
      1 and Ac
      3 .
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题为了获得经济性和冲击特性优异的钢管,在制造具有≥40mm板厚的极厚钢板的制造用于建筑物的低屈服比率钢管的情况下 。 解决方案:制造方法包括:加热车辆; 热轧 然后对热轧钢板进行如下(1)〜(3)所示的任一种热处理。 制造钢板,不进行后续热处理; 随后将其冷成型为钢管; 然后将其保持在低于Ac 1 转变温度的400至650℃下至少5分钟; 然后以10℃/秒以下的冷却速度进行冷却。 热处理包括:(1)轧制后,将轧制板从Ar 3 温度直接淬火至≤400℃; (2)轧制后,从Ar 3℃+ 50℃以上至≤400℃的温度直接淬火,进一步再加热,并在Ac < SB> 1 至Ac 3 ; 和(3)轧制后,对轧制板进行空气冷却,进一步再加热,然后在Ar 3 或更高的温度下淬火,进一步再加热,然后在 Ac 1 和Ac 3 。 版权所有(C)2009,JPO&INPIT
    • 3. 发明专利
    • Punch device for u press used in uoe steel pipe production process
    • U型钢管生产过程中使用的U型冲压装置
    • JP2005305501A
    • 2005-11-04
    • JP2004125470
    • 2004-04-21
    • Sumitomo Metal Ind Ltd住友金属工業株式会社
    • SHIMOMOTO TOSHIKI
    • B21C37/08B21D5/01
    • B21D5/01B21C37/0815
    • PROBLEM TO BE SOLVED: To provide a punch device for a U press used in a UOE steel pipe production process which copes with a variety of sizes of pipes to be manufactured and reduces a width of U-shaped pipe after U pressing more than a conventional punch device for a U press.
      SOLUTION: The punch device 100 for the U press is used in the UOE steel pipe production process. The punch device 100 for the U press has a first punch part 10 provided with semicylindrical press surfaces 11, 11 on both side surfaces thereof; a second punch part 20 arranged to contact with a lower part of the first punch part 10 and having semicylindrical press surfaces 21, 21 which are the same as the press surface 11 or different therefrom on both sides; and a third punch part 30 arranged to contact with a lower part of the second punch part 20 and provided with a downwardly directed semicylindrical press surface 31.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种用于UOE钢管生产过程中的U型冲压机的冲头装置,其应用要制造的各种尺寸的管道,并且在U压更多之后减小U形管的宽度 比用于U印刷机的常规冲压装置。 解决方案:在UOE钢管生产过程中使用U型冲床的冲头装置100。 U型冲压机的冲头装置100具有在其两个侧面上设置有半圆柱形压制表面11,11的第一冲压部件10; 第二冲头部件20,被布置成与第一冲头部件10的下部接触并且具有与压制表面11相同或不同于其两侧的半圆柱形挤压表面21,21; 以及第三冲头部件30,其布置成与第二冲头部件20的下部接触并设置有向下指向的半圆柱形挤压表面31.版权所有:(C)2006,JPO&NCIPI
    • 4. 发明专利
    • Steel pipe for structural column with low yield ratio, steel plate used therefor and manufacturing method therefor
    • 用于低屈服比的结构柱钢管,其使用的钢板及其制造方法
    • JP2005163159A
    • 2005-06-23
    • JP2003407646
    • 2003-12-05
    • Sumitomo Metal Ind Ltd住友金属工業株式会社
    • HASEGAWA KAZUHIKOHIRANO KOICHISHIMOMOTO TOSHIKI
    • C21D8/02C21D9/08C22C38/00C22C38/58
    • PROBLEM TO BE SOLVED: To provide an inexpensive steel pipe superior in impact properties, which is a structural column with a low yield ratio made by cold-forming an extra thick steel plate having a thickness of 40 mm or more.
      SOLUTION: The manufacturing method comprises: heating a rolling stock; hot-rolling it; then subjecting the hot-rolled steel plate to any one of heat treatments shown in the following (1) to (3); (1) directly quenching the rolled plate from an Ar
      3 temperature or lower to 400°C or lower; (2) directly quenching the rolled plate from a temperature of Ar
      3 +50°C or lower to 400°C or lower, further reheating it, and quenching it at a temperature between Ac
      1 and Ac
      3 ; and (3) air-cooling the rolled plate, further reheating it, then quenching it at a temperature of Ar
      3 or higher, further reheating it, and then quenching it at a temperature between Ac
      1 and Ac
      3 ; manufacturing a steel plate without performing subsequent heat treatment; subsequently cold-forming it into the steel pipe; then holding it at 400 to 650°C which are lower than the Ac
      1 transformation temperature, for at least five minutes; and then cooling it at a cooling rate of 10°C/second or less.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种冲击性能优异的便宜的钢管,其是通过冷成型厚度为40mm以上的超厚钢板制成的具有低屈服比的结构柱。 解决方案:制造方法包括:加热车辆; 热轧 然后对热轧钢板进行如下(1)〜(3)所示的任一种热处理。 (1)从Ar 3 温度或低于400℃直接淬火该轧制板; (2)从Ar 3℃+ 50℃或更低至400℃或更低的温度直接淬火该轧制板,进一步再加热,并在Ac 1 和Ac 3 ; (3)对轧制板进行空气冷却,进一步再加热,然后在Ar 3℃以上的温度下淬火,进一步再加热,然后在Ac 1 和Ac 3 ; 制造钢板,不进行后续热处理; 随后将其冷成型为钢管; 然后将其保持在低于Ac 1 转变温度的400至650℃下至少5分钟; 然后以10℃/秒以下的冷却速度进行冷却。 版权所有(C)2005,JPO&NCIPI
    • 5. 发明专利
    • Method and device for expanding uoe steel tube
    • 用于扩展UOE钢管的方法和装置
    • JP2006289439A
    • 2006-10-26
    • JP2005113702
    • 2005-04-11
    • Sumitomo Metal Ind Ltd住友金属工業株式会社
    • SHIMOMOTO TOSHIKI
    • B21D39/20B21C37/30
    • PROBLEM TO BE SOLVED: To provide a method for expanding a tube upon production of a UOE steel tube and a device for practicing the tube expanding method where the uniformization of the wear amount of dies and the improvement in the roundness of the steel tube are attained.
      SOLUTION: All the outer circumferential parts of a plurality of dies 1 fitted to a tube expanding device are each provided with a groove part 1a for avoiding excess metal 2a on the inner circumferential side in the weld zone of each steel tube 2. When a plurality of the steel tubes 2 are successively extended by the tube expanding device, per the steel tube 2 to be extended, each die 1 relatively corresponding to the excess metal 2a in the steel tube 2 is changed by rotating the steel tube 2 to the circumferential direction, so as to perform tube expanding.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种UOE钢管制造时的管膨胀方法和实施模具磨损量均匀化和钢的圆度提高的管扩管法的装置 管。 解决方案:安装在扩管装置上的多个模具1的所有外圆周部分均设置有用于避免在每个钢管2的焊接区域的内周侧上的多余金属2a的槽部1a。 当通过扩管装置连续延伸多个钢管2时,对于要延伸的钢管2,通过使钢管2旋转而使钢管2中的多余的金属2a相当对应的模具1变为 圆周方向,以进行管扩径。 版权所有(C)2007,JPO&INPIT
    • 6. 发明专利
    • Method and apparatus for manufacturing uoe steel pipe
    • 制造UOE钢管的方法和装置
    • JP2005186098A
    • 2005-07-14
    • JP2003429729
    • 2003-12-25
    • Sumitomo Metal Ind Ltd住友金属工業株式会社
    • SHIMOMOTO TOSHIKIFUKUNIWA TETSUYAMATSUMOTO YOSHIMASA
    • B21C37/08B21D5/01
    • B21C37/08B21D5/015G05G1/12
    • PROBLEM TO BE SOLVED: To efficiently manufacture a UOE steel pipe for high strength corresponding to the grade of X80.
      SOLUTION: By a method for manufacturing the UOE steel pipe, after forming a U pipe with a U press, when the opening width of the obtained U pipe is larger than the diameter of the die of an O press in the succeeding stage, the U pipe is conveyed in the inside of the O press while narrowing the opening width of the U pipe than the diameter of the die of the O press from the nose side of the U pipe with a clamping rolls which is provided in preceding stage of the O press or/and at least in the inlet part of the O press and, after completing carrying-in in the inside of the O press, the U pipe is formed into an O pipe with the O press. An apparatus for manufacturing the UOE steel pipe is used for the above method. In this manufacturing apparatus, it is preferable that the clamping rolls are provided in a roll stand and composed of a multistage rolls. Furthermore, it is preferable that the clamping rolls have a preventing apparatus of the lifting of the U pipe when narrowing the opening width of the U pipe and are provided with functions for conveying the U pipe.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了有效地制造对应于X80等级的高强度的UOE钢管。 解决方案:通过用于制造UOE钢管的方法,在用U型压制成型U型管之后,当所获得的U型管的开口宽度大于后续阶段的O型压模的模具的直径 U型管在O型压力机的内侧被输送,同时使U型管的开口宽度比U型管的模具的直径从U型管的前端变窄,并且在前级设置有夹紧辊 的O压机和/或至少在O压机的入口部分,并且在O压机的内部完成搬运之后,U管通过O压机形成为O管。 用于制造UOE钢管的装置用于上述方法。 在该制造装置中,夹紧辊优选设置在辊架中,由多级辊构成。 此外,优选的是,夹紧辊具有在缩小U形管的开口宽度时提供U型管的防止装置,并且具有用于输送U型管的功能。 版权所有(C)2005,JPO&NCIPI
    • 7. 发明专利
    • U press apparatus and u press method
    • U压机和U压机
    • JP2007245218A
    • 2007-09-27
    • JP2006074672
    • 2006-03-17
    • Sumitomo Metal Ind Ltd住友金属工業株式会社
    • SHIMOMOTO TOSHIKI
    • B21D5/01B21C37/08
    • PROBLEM TO BE SOLVED: To prevent local wall-thickness loss which is generated in end parts in the axial direction of a pipe in U forming when manufacturing a UOE steel pipe especially having thick wall-thickness.
      SOLUTION: Relief parts 2ba the surfaces of which are brought into contact with a steel plate 3 are tapered as going to an end face are formed, in both end parts in the axial direction of the pipe of a lower rocker shoe 2b of a rocker die 2 which comprises a rocker assembly type U press apparatus. The lower rocker shoe 2b is constituted so that the positions in the axial direction of the pipe of the relief parts 2ba are changeable. When forming the steel plate 3 into a U shape, the plate is formed into the U shape by situating the relief parts 2ba formed in both end parts in the axial direction of the pipe of the lower rocker shoe 2b in the end parts in the axial direction of the pipe of the steel plate 3. When manufacturing the UOE steel pipe having the thick wall-thickness, the generation of the local wall-thickness loss in the end parts in the axial direction of the pipe is prevented in U forming. Then, it is unnecessary to manufacture the steel plate of which the thickness is on the thick side and the yield is improved.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了防止在制造尤其是具有较厚壁厚的UOE钢管时在U形成中的管的轴向端部产生的局部壁厚损失。 解决方案:其表面与钢板3接触的缓冲部分2ba在形成端面时呈锥形,在两个端部中,在下部摇臂2b的管的轴向方向上 摇杆2,其包括摇臂组件型U压机。 下摇臂2b构成为能够使浮雕部2ba的管的轴向的位置变化。 当将钢板3形成为U形时,通过将在两个端部中形成的凸出部分2ba沿着轴向的端部的下部摇臂2b的管的轴向位置来形成U形, 在制造具有厚壁厚度的UOE钢管时,在U形成中防止了在管的轴向方向上端部的局部壁厚损失的产生。 然后,不需要制造厚度较厚的钢板,并且提高成品率。 版权所有(C)2007,JPO&INPIT
    • 8. 发明专利
    • Connecting tube and its manufacturing method
    • 连接管及其制造方法
    • JP2006281217A
    • 2006-10-19
    • JP2005100426
    • 2005-03-31
    • Sumitomo Metal Ind Ltd住友金属工業株式会社
    • HIRATA HIROMASAHAMADA MASAHIKOSHINOKI KENICHISHIMOMOTO TOSHIKI
    • B23K9/028B23K101/06
    • PROBLEM TO BE SOLVED: To provide a connecting tube excellent in buckling resistance and also to provide its manufacturing method.
      SOLUTION: This connecting tube is equipped with steel tubes 10, 20 and a butt-welded zone 30. The steel tube 20 is installed coaxially with the steel tube 10 and provided with the same nominal outside diameter DA (mm) as the steel tube 10. The butt-welded zone 30 is between the tubes 10, 20 and formed by butt-welding of these tubes 10, 20. The outside diameter DO1 (mm) and the inner diameter DI1 (mm) of the end 11 of the steel tube 10 and those DO2 (mm) and DI2 (mm) of the end 21 of the steel tube 20 satisfy following expressions (1), (2). The yield stress Y1 (MPa) of the steel tube 10 and that Y2 (MPa) of the steel tube 20 satisfy expression (3) below. Expressions (1), (2) and (3) are: |DO1-DO2|≤1.5×|DI1-DI2| (1); |DI1-DI2|≤0.01×DA+2 (2); and |Y1-Y2|≤120 (3), respectively.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供耐弯曲性优异的连接管,并提供其制造方法。

      解决方案:该连接管配备有钢管10,20和对接焊接区域30.钢管20与钢管10同轴设置,并且设置有与钢管10相同的标称外径DA(mm) 对接焊接区域30在管10,20之间,并通过这些管子10,20的对接焊接形成。外径DO1(mm)和端部11的内径DI1(mm) 钢管20的端部21的钢管10和DO2(mm)和DI2(mm)满足下述式(1),(2)。 钢管10的屈服应力Y1(MPa)和钢管20的Y2(MPa)满足下面的式(3)。 表达式(1),(2)和(3)是:¾DO1-DO2¾≤1.5×¾DI1-DI2¾(1); ¾DI1-DI2¾≤0.01×DA + 2(2); 和¾Y1-Y2¾≤120(3)。 版权所有(C)2007,JPO&INPIT