会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • CONTROL DEVICE OF ABSORBING AIR CONDITIONER
    • JPH10246530A
    • 1998-09-14
    • JP5052497
    • 1997-03-05
    • RINNAI KKOSAKA GAS CO LTD
    • KURODA SHINJISATOU HISAHIROKAWAMOTO KAORU
    • F25B15/00
    • PROBLEM TO BE SOLVED: To improve a comfortable characteristic during a heating operation even in the case that a plurality of indoor devices and floor heating panels are provided. SOLUTION: This control device is comprised of a tandem pump for driving both an absorbing liquid pump and a cold or hot water pump 220 by the same motor. When the tandem pump is operated for a cooling operation, it is controlled to show a variable number of rotation corresponding to a temperature of absorbing liquid within the high temperature regenerating device, and in turn, when a heating operation is carried out, it is fixedly controlled to a high number of rotation of 3300rpm in response to the number of operation of an indoor machine 300 connected in parallel with a cold or hot water passage and a floor heating panel 400 when a floor heating operation of the floor heating panel is being performed, and it is fixedly controlled to a low number of rotation of 2100rpm when one indoor machine is operated in response to the number of rotation of the indoor machines and when more than two indoor machines are operated, it is fixedly controlled to a medium number of rotation of 2400rpm, respectively, when the floor heating operation of the floor heating panel is not carried out. When the floor heating panel is operated, a high discharging pressure can be assured and further a flow rate of cold or hot water passage is made stable in response to the number of operation of loads, resulting in that it is possible to prevent variation in temperature.
    • 3. 发明专利
    • CONTROLLER FOR AIR CONDITIONER
    • JP2002195628A
    • 2002-07-10
    • JP2000388384
    • 2000-12-21
    • RINNAI KKOSAKA GAS CO LTD
    • SATOU HISAHIROKURODA SHINJIKAWAMOTO KAORUFUKUCHI TORU
    • F24F11/02F25B15/00
    • PROBLEM TO BE SOLVED: To provide a controller for an air conditioner, which is capable of controlling cold water and hot-water pump for operation at an optimum number of revolutions, according to the length of a pipeline or the load condition of an indoor machine or the like to permit the development of cooling and heating performance or the like and contributing to saving in electric power. SOLUTION: The range of allowable number of revolution between the maximum and minimum numbers of revolution of the cold water and hot-water pump, according to the number of operating sets of indoor machines RU is set based on the heat- capacity curve of the pump while the temperature of returning cold water or hot-water from the indoor machines RU is considered with respect to the number of revolution as load information. When the temperature of returning cold or hot-water is high in cooling operation, the load of the pump is deemed that it is high and the number of revolution of the cold water and hot-water pump is increased; however, when this temperature is low, the load is deemed that it is low and the number of revolution of the pump is decreased, the number of revolution of the pump is corrected intermittently. Accordingly, the cold water and hot-water pump is controlled, so as to be operated at the optimum number of revolution in accordance with the length of the pipeline or the load condition of the indoor machines RU or the like.
    • 4. 发明专利
    • AIR CONDITIONER
    • JP2002195596A
    • 2002-07-10
    • JP2000388028
    • 2000-12-21
    • RINNAI KKOSAKA GAS CO LTD
    • SATOU HISAHIROKURODA SHINJINAKAYAMA RIE
    • F24F1/00F25B15/00
    • PROBLEM TO BE SOLVED: To provide an air conditioner with which the user can realize comfortableness capable of meeting its preference by quickly correcting the number of revolutions of a cold/hot water pump through simple operation in accordance with an application or installation of the air conditioner at a job site, his personal sense, etc., even when the number of revolutions of the pump is preset in accordance with the operating number of indoor machines. SOLUTION: This air conditioner is provided with a microcomputer 400 which is provided on an outdoor machine side, is made to store a number of revolutions to be corrected in accordance with cooling and heating operations, and sends an instructing signal to a controller 200 when dip switches U-Z are operated. The dip switches U-Z are operated in accordance with a request from the user after installation. Consequently, the number of revolutions of the cold/hot water pump is corrected when the instructing signal is sent to the controller 200 and the flow rate of cold water or hot water is corrected suitably to the original cooling or heating operation of this air conditioner in accordance with the preference or sense of the user.
    • 5. 发明专利
    • CONTROL DEVICE OF SUCTION TYPE AIR CONDITIONER
    • JPH10246492A
    • 1998-09-14
    • JP5052597
    • 1997-03-05
    • RINNAI KKOSAKA GAS CO LTD
    • KURODA SHINJIFUKUCHI TORU
    • F24F11/02
    • PROBLEM TO BE SOLVED: To simply perform the trial run after the installation work is completed in a method wherein the heating operation and the cooling operation of an outdoor unit are successively performed in the trial run following the instruction on the trial run by a trial run switch, cold/hot water valves are opened according to the command on each test operation to carry out each test operation. SOLUTION: The trial heating run is carried out for each indoor unit 300 by operating a trial run switch on the side of an outdoor unit 100, and the connection inspection of cold/hot water flow passages of the outdoor unit 100 to the piping 303 of an indoor heat exchanger 301 of each indoor unit 300, and the connection inspection of the signal transmission line between an outdoor unit control means and an indoor unit control means can be carried out. When the cooling trial run is carried out after the examination of each connection condition is completed in the heating trial run, the inspection on the connection of each piping and signal transmission line is completed, and the normal operation of the suction cycle in the outdoor unit 100 can be checked by detecting the drop of the temperature in an evaporator.
    • 6. 发明专利
    • Absorption type cooling and heating machine
    • 吸收式冷却和加热机
    • JP2003042588A
    • 2003-02-13
    • JP2001225819
    • 2001-07-26
    • Osaka Gas Co LtdRinnai Corpリンナイ株式会社大阪瓦斯株式会社
    • KURODA SHINJISUGIMOTO NAOMASAKAWAMOTO KAORU
    • F25B15/00
    • Y02A30/277Y02B30/62
    • PROBLEM TO BE SOLVED: To prevent freezing due to super-cool in an evaporator and permit the continuation of cooling operation without interrupting the same, even under a condition that a feed water temperature is low and the temperature of circulating cooling water is also low upon starting the cooling operation in an absorption type cooling and heating machine.
      SOLUTION: The temperature of cooling water is detected by a cooling water thermistor upon starting cooling operation. When the detected temperature is determined as lower than a predetermined temperature (25°C for example), a cooling tower fan for a cooling tower is stopped. According to this operation, an excessive absorbing capacity of an absorber is prevented by stopping the circulation of the cooling water whereby the freezing of the evaporator is prevented and the cooling operation is effected without causing any trouble. Further, when the temperature of cooling water has become higher than 28°C, for example, after stopping the cooling tower fan, the operation of the cooling tower fan is re-started.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了防止在蒸发器中由于超冷而导致的冷冻,并且即使在给水温度低并且循环冷却水的温度也低的条件下,即使在不使其中断的情况下也能够继续冷却操作 在吸收式制冷和加热机中开始冷却操作。 解决方案:开始冷却运行时,冷却水热敏电阻检测冷却水的温度。 当检测到的温度被确定为低于预定温度(例如25℃)时,用于冷却塔的冷却塔风扇停止。 根据该操作,通过停止冷却水的循环来防止吸收器的过度的吸收能力,从而防止蒸发器的冻结,并且不产生任何问题而进行冷却操作。 此外,当冷却水的温度例如高于28℃时,例如在停止冷却塔风扇之后,重新启动冷却塔风扇的操作。
    • 7. 发明专利
    • Absorption air conditioner
    • 吸气空调
    • JP2003075033A
    • 2003-03-12
    • JP2001263864
    • 2001-08-31
    • Osaka Gas Co LtdRinnai Corpリンナイ株式会社大阪瓦斯株式会社
    • KURODA SHINJIFUKUCHI TORU
    • F25B49/04F25B49/00
    • PROBLEM TO BE SOLVED: To solve the problem of uncertainty in setting up an air conditioner, i.e., the problem that no trial cooling operation can be performed in setting up the air conditioner to confirm its operation in a temperature condition where the trial cooling operation is supposed to be suspended (due to possible freezing of refrigerant in an absorption refrigerating cycle).
      SOLUTION: When a command to perform a trail cooling operation is given in the conditions where there is a possibility for the refrigerant to freeze in the refrigerating cycle 7 (the outside air temperature is lower than 15°C), and where there is no possibility for cooling water to freeze in a water supply means 65 and cooling water piping 62 (the outside air temperature is 3°C or more), heating operation is performed to heat cooling water, followed by performing the trial cooling operation. Specifically, in such a procedure, pressure lowering in an evaporation/absorption case 41 is suppressed, and thus freezing of the refrigerant is prevented, so that the trial cooling operation is enabled. Thus limitation of the trial cooling operation can be so much raised as to remarkably enhance reliability in setting up an air conditioner, in comparison with a conventional air conditioner.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了解决设置空调的不确定性的问题,即在试制冷运转的温度条件下,在设置空调机时不能进行试制冷运转以确认其运行的问题 应该暂停(由于可能在吸收制冷循环中冻结制冷剂)。 解决方案:在制冷剂在制冷循环7(外界空气温度低于15℃)中冻结的可能性的条件下,进行制冷运转的指令时,没有 在供水装置65和冷却水管路62(外部空气温度为3℃以上)中冷却水的冷冻的可能性,进行加热运转以加热冷却水,然后进行试冷。 具体地说,在这种方法中,抑制了蒸发/吸收壳体41的压力降低,从而防止制冷剂的冻结,使得能够进行试冷。 因此,与传统的空调相比,试制冷却操作的限制可以大大提高,从而显着增强了设置空调的可靠性。
    • 8. 发明专利
    • Absorptive cooling and heating machine
    • 吸收式冷却和加热机
    • JP2003042589A
    • 2003-02-13
    • JP2001225827
    • 2001-07-26
    • Osaka Gas Co LtdRinnai Corpリンナイ株式会社大阪瓦斯株式会社
    • KURODA SHINJIOSHIMA KATSUYAKAWAMOTO KAORU
    • F25B15/00
    • Y02A30/277Y02B30/62
    • PROBLEM TO BE SOLVED: To prevent the supercooling of an evaporator and eliminate the trouble in cooling operation, when a load from the side of an indoor terminal machine is very small upon cooling operation and cooling operation stopping process or the like during the cooling operation, or when cold start is effected under a condition that a feed water temperature is low, in an absorptive cooling and heating machine.
      SOLUTION: The temperature of the evaporator 4 is detected by a first thermistor Tf upon cooling operation and cooling operation stopping process or the like during the cooling operation. The temperature of the evaporator 4 is judged based on an output from the first thermistor Tf whether the same is lower than 3°C or not. When the temperature is lower than 3°C, both or either one of a cooling tower fan S or a cooling water pump P2 is stopped. When the temperature of the evaporator 4 is raised to a value higher than 7°C, the operation of both or either one of the cooling tower fan S or the cooling water pump P2 is re-started. According to this method, the supercooling and freezing of the evaporator 4 is prevented whereby the cooling operation is continued without interruption.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题为了防止蒸发器的过冷,并且消除了制冷操作的麻烦,当在冷却操作期间在冷却操作和冷却操作停止处理等时室内终端机侧的负载非常小时, 或者在吸水冷却加热机中,在供水温度低的条件下进行冷启动时。 解决方案:在冷却操作期间,在冷却操作和冷却操作停止处理等时,由第一热敏电阻Tf检测蒸发器4的温度。 根据第一热敏电阻Tf的输出判断蒸发器4的温度是否低于3℃。 当温度低于3℃时,冷却塔风扇S或冷却水泵P2中的任一个停止。 当蒸发器4的温度升高到高于7℃的温度时,重新启动冷却塔风扇S或冷却水泵P2中的任一个或任一个的操作。 根据该方法,能够防止蒸发器4的过冷却和冷冻,从而不间断地继续冷却运转。
    • 9. 发明专利
    • Absorption air conditioner
    • 吸气空调
    • JP2003014258A
    • 2003-01-15
    • JP2001199722
    • 2001-06-29
    • Osaka Gas Co LtdRinnai Corpリンナイ株式会社大阪瓦斯株式会社
    • KURODA SHINJIMAKI NAOYA
    • F24F5/00F24F11/02F25B15/00
    • Y02A30/277Y02B30/62
    • PROBLEM TO BE SOLVED: To solve the problems with a conventional absorption air conditioner that the life of a cold/warm water pump drops and the time required for automatic water filling operation becomes long because the fluctuation of water level within a cistern is large and the cold/warm water pump repeats the operation and stoppage many times when the automatic water filling operation for filling cold/warm water in a vacant cold/warm water pipe is executed.
      SOLUTION: A controller is provided to continue the state of supplying water into the cistern 55, opening a cistern water supply valve 58 for a specified time (for five seconds), even if a high liquid level sensor 55a detects high water level. Thereupon, the time of cold/warm water pump 54 pressurizing and supplying cold/warm water into the cold /warm water pipe 53 during water supply increases. Hereby, the number of times of the water level within the cistern 55 dropping decreases, so the time required for automatic water filling operation can be shortened. Moreover, since the number of times of the water level of the cistern 55 dropping decreases, the number of times of the cold/warm water pump 54 repeats the operation and stoppage decreases, and the life of the cold/ warm water pump 54 elongates.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题为了解决传统的吸收式空调的问题,冷/热水泵的使用寿命下降,自来水灌装运行所需的时间变长,因为水箱内的水位波动大, 冷/热水泵在空置冷/热水管道中灌装冷/暖水的自动灌水作业时,冷/热水泵重复操作和停机多次。 解决方案:即使高液位传感器55a检测到高水位,也提供控制器以继续向储水箱55供水的状态,打开水箱供水阀58一段规定时间(五秒钟)。 因此,在供水期间冷/暖水泵54对冷/暖水管53进行加压供水的时间增加。 因此,水箱55内的水位下降次数减少,所以可以缩短自动充水运转所需的时间。 此外,由于水箱55的水位下降次数减少,所以冷/暖水泵54的次数重复,停止运转减少,冷/暖水泵54的寿命延长。
    • 10. 发明专利
    • Absorption type air conditioning equipment
    • 吸收式空调设备
    • JP2003065625A
    • 2003-03-05
    • JP2001252733
    • 2001-08-23
    • Osaka Gas Co LtdRinnai Corpリンナイ株式会社大阪瓦斯株式会社
    • KURODA SHINJISHIMIZU MIKIOFUKUCHI TORU
    • F25B15/00F25B49/04
    • Y02A30/277Y02B30/62
    • PROBLEM TO BE SOLVED: To solve the problem of a usual indiscriminate diluting operation for a cooling operation conducted after recovery of power when the cooling operation is executed on the occasion of a power failure, considering that there are various cases in the state of the operation at the power failure and therefore the indiscriminate dilution causes waste.
      SOLUTION: When power recovers in the case of the power failure in the course of the cooling operation, a means for the diluting operation mounted on a controller executes a simple diluting operation when the temperature of a high-temperature regenerator 15 which is stored at the power failure is below 60°C. When this temperature is 60°C or above, simulated cooling is executed according to the condition and the diluting operation is conducted. A useless diluting operation is held down consequently and crystallization can surely be prevented. Since the dilution is conducted by executing the simulated cooling operation according to the condition, an absorbing solution in an absorption type refrigerating cycle 7 can be circulated efficiently and, as the result, a dilution time can be shortened.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:为了解决在停电时进行制冷运转时在恢复电力后进行的冷却运转的通常的不加选择的稀释运行的问题,考虑到在运行状态中存在各种情况 在停电时,因此不分皂白的稀释会造成浪费。 解决方案:当在制冷运行过程中电源故障的情况下恢复供电时,安装在控制器上的稀释操作的装置在存储在冷却器的高温再生器15的温度下执行简单的稀释操作 电源故障低于60摄氏度 当该温度为60℃以上时,根据条件进行模拟冷却,进行稀释操作。 因此,无用的稀释操作被抑制,可以可靠地防止结晶。 由于通过根据条件执行模拟冷却操作来进行稀释,因此可以有效地循环吸收式制冷循环7中的吸收溶液,结果可以缩短稀释时间。