热词
    • 3. 发明专利
    • IMMERSED TUNNELING METHOD OF PIPE BODY
    • JP2001164637A
    • 2001-06-19
    • JP34889299
    • 1999-12-08
    • RAITO KOGYO KK
    • KOBAYASHI SATOSHIIIDA HARUAKI
    • E03F3/06F16L1/024
    • PROBLEM TO BE SOLVED: To improve execution work efficiency. SOLUTION: A preceding pipe body 10 is immersed in an excavating groove 2 filled with a stabilizing liquid B1, a partition wall 30 is arranged in a lengthwise directional intermediate position of the preceding pipe body 10, a base end side first solidifying object area 31 of the preceding pipe body is partitioned, a tip part of the preceding pipe body 30 is positioned on the succeeding pipe body arranging side of the partition wall 30, solidification of the first solidifying object area 31 is started thereafter, and while pertforming this solidification, a process of excavating a succeeding excavating groove 2A on the succeeding pipe body 100 arranging side, an immersing process of a succeeding pipe body 100 in the succeeding excavating groove 2A, a connecting process of the succeeding pipe body 100 and the preceding pipe body 10 and a solidifying process in the succeeding excavating groove 2A are successively performed.
    • 4. 发明专利
    • METHOD AND DEVICE FOR HOLDING TUBE BODY IN SUSPENSION SUPPORT ATTITUDE
    • JP2001032960A
    • 2001-02-06
    • JP20722999
    • 1999-07-22
    • RAITO KOGYO KK
    • KOBAYASHI SATOSHI
    • E03F3/06F16L1/024F16L3/14
    • PROBLEM TO BE SOLVED: To hold a tube body in a specified suspension support attitude. SOLUTION: This method holds a tube body PU2 in a specified suspension support attitude in immersing the tube body PU2 suspended in an excavated groove filled with slurry B and supporting the sunk tube body PU2 suspended in the slurry B. In this case, guide bars 10A and 10B are provided in the excavated groove, on the other hand, guided tubes 23A and 23B into which these guide bars 10A and 10B are inserted and which are guided along the guide bars 10A and 10B are provided in the tube body PU2. In hanging the tube body PU2 down, the guide bars 10A and 10B are inserted into the guided tubes 23A and 23B of the tube body PU2, and while guiding the tube body PU2 along the guide bars 10A and 10B through the guided tubes 23A and 23B, the tube body PU2 is immersed in the slurry B in the excavated groove. With the tube body PU2 supported, the tube body PU2 is held in specified horizontal attitude or inclined attitude with the tube body PU2 engaged with the guide bars 10A and 10B through the guided tubes 23A and 23B.