会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Concrete filling method in concrete filled steel pipe construction method and steel pipe for filling concrete used for the method
    • 混凝土填充钢管施工方法和钢管混凝土填充混凝土混凝土施工方法
    • JP2005200848A
    • 2005-07-28
    • JP2004005779
    • 2004-01-13
    • Penta Ocean Constr Co Ltd五洋建設株式会社
    • TAKEUCHI HIROYUKIOCHIAI RYOTAHATTORI KAKUSHIYOKOYAMA NAOKI
    • E04B1/16E04G21/02
    • PROBLEM TO BE SOLVED: To increase working efficiency by performing the other workings using a hoist in parallel with the placement of concrete without occupying the hoist when concrete is fallen and placed.
      SOLUTION: A vertical concrete guide passage 3 formed by partitioning a steel pipe inner space by a partition wall 4 is integrally formed in a steel pipe 1. A plurality of concrete outflow ports 5a to 5f are formed in the partition wall 4 of the concrete guide passage 3 at specified intervals in the vertical direction. With the steel pipe 1 erected vertically, concrete is placed therein from the upper end of the concrete guide passage. The concrete fallen through the concrete guide passage is allowed to flow into the steel pipe 1 through the concrete outflow port to fill the concrete in the steel pipe.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了提高工作效率,通过使用葫芦进行其他工作,与混凝土的放置平行而不占用起重机,当混凝土下落和放置时。 解决方案:通过分隔壁4分隔钢管内部空间形成的立式混凝土引导通道3一体地形成在钢管1中。多个混凝土流出口5a至5f形成在分隔壁4的 混凝土引导通道3在垂直方向上以规定的间隔。 在钢管1垂直竖立的情况下,混凝土从混凝土引导通道的上端放置在其中。 通过混凝土导流通道的混凝土允许通过混凝土流出口流入钢管1,以填充钢管中的混凝土。 版权所有(C)2005,JPO&NCIPI